HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: SOUTHWOOD HOLDINGS (FP-REPLAT) - 07-00500061
PLANNING
1. Please add the general notes to the plat that will be filed with the City and County.
2. Please change the name of the R-4 zoning district to "Multi-Family Residential."
Reviewed by: Crissy Hartl Date: March 23, 2007
ENGINEERING COMMENTS NO. 1
1. No comments.
Reviewed by: Carol Cotter Date: March 22, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
3. If applicable, the following easements will be required: Developer to coordinate w4th CSU
and get existing underground electrical primary line marked by CSU locators and a 20' wide
easement surveyed off the marked primary line with the primary line being in the center of
the 20' wide easement. A subsequent 20' easement will need to be obtained by plat from
the existing electrical transformer to the common lot line of Brandon Heights Phase 1 Lot 13
and Brandon Heights Phase 2 Block A.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
wdavis@cstx.gov
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Weldon Davis at
979.764.5027, or Tony Michalsky at 979.764.3438.
Reviewed by: Weldon Davis Date: March 20, 2007
SANITATION
1. Dumpster enclosure needs to be turned at a 90 degree angle in order to access.
Reviewed by: Wally Urrutia Date: March 20, 2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 2 of 2