HomeMy WebLinkAboutStaff Report STAFF REPORT
Project Manager: Crissy Hartl Report Date: March 23, 2007
Email: chartl@cstx.gov Meeting Date: April 5, 2007
Project Number: 07-00500054
Item: Presentation, possible action, and discussion on a Final Plat for Pebble Creek Phase 9F
consisting of 31 lots on 14.02 acres generally located off of St. Andrews Drive just southwest of
Pebble Creek Parkway.
Applicant: Davis Young, Pebble Creek Development
Staff Recommendations: Staff recommends approval of the final plat.
Item Summary: This final plat consists of 31 single-family residential lots on 14.02 acres in the
Pebble Creek Subdivision. This phase is located at the northeast corner of the St. Andrews
Drive and Quaker Ridge Drive intersection, just southwest of the future Pebble Creek Parkway.
Until Pebble Creek Parkway is constructed, the only access to this phase will be from Quaker
Ridge Drive.
Comprehensive Plan Considerations: The Land Use Plan identifies this area as Single
Family Medium Density. The Thoroughfare Plan shows the extension of a minor collector St.
Andrews Drive from Congressional Drive to the future extension of Pebble Creek Parkway,
which is shown as a major collector. However, St. Andrews will not connect to Pebble Creek
Parkway until Pebble Creek Parkway is extended. This portion of St. Andrews Drive will also
includes bikelanes as shown on the Bikeway Master Plan.
This final plat is in compliance with the approved preliminary plat for Phases 9D-9H, the City's
Subdivision Regulations and the Comprehensive Plan.
Item Background: The subject property was annexed in 1994 and subsequently zoned A-O
Agricultural-Open. It was rezoned in 2004 to R-1 Single-Family Residential and has remained
unplatted. A preliminary plat was approved for Phases 9D-9H in March 2005 by the Planning &
Zoning Commission.
Budgetary & Financial Summary: None requested.
Related Advisory Board Recommendation: Parkland has already been dedicated through
previous phases of the Pebble Creek subdivision.
Commission Action Options: The Commission has final authority over the final plat. The
options regarding the final plat are:
• Approval
• Denial
Supporting Materials:
1. Small Area Map (SAM) and Aerial Map
2. Application
3. Copy of Final Plat (provided in packet)