Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: PEBBLE CREEK PH 9F (FP) - 07-00500054 PLANNING 1. Please include the number of lots in the title block. 2. Please adjust the acreage in the title block of the plat to reflect the acreage listed on the tax certificate. 3. The construction documents and reports are still under review and may affect the plat. Reviewed by: Crissy Hartl Date: March 12, 2007 ENGINEERING COMMENTS NO. 1 1. Apparently the water line along St Andrews Drive was not constructed with Phase 9D although it was required for fire flow. Include water line with this construction set. Be aware that a fire flow test may be performed on the existing system, and if there is not fire flow, no building permits will be issued on any remaining lots in 9D. 2. Add proposed easements to Overall Plan (Sheet 2). 3. Please indicate whether water and sewer design reports submitted with Phase 9D are still valid. 4. Additional PUE width is required for sewer main (existing) deeper than 14 feet. Especially since storm pipe will also be constructed in the easement and lines cut through lot where house could be closely placed. 5. How will sanitary sewer be provided to Lot 1, Block 53 in future Phase 9G? It was previously shown to be sewered through Block 46. 6. Are Lots 12-17 Part of Block 41 or 49? Not clear on Preliminary Plat. Construction Documents show Block 41. 7. It does not appear that the drainage Report that was submitted previously for 9D and 9F is still valid. Some of the storm pipe sizes have been changed. Submit revised report. Are energy dissipation blocks not needed on Outfall SD-B? 8. How will Owner of Lot 23 know that he cannot build a fence across path of discharge from outfall SD-B. Would it be better to extend outfall past lot line? 9. As shown, additional PDE will be required for maintenance of Outfall SD-B. Rock rip rap extends outside PUE of Lot 23. 10. Match soffits of pipes at Junction Box 26.1. 11. How does the "Typical Junction Box" detail account for pipe not connecting perpendicular to box? 12. Provide "Letter Acknowledging City Standards". Reviewed by: Carol Cotter Date: March 11, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to bread@cstx.gov . 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: March 7, 2007 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia / Rodney Harris Date: March 7, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3