Loading...
HomeMy WebLinkAboutNotes W10.1640d Jo Ph nawSoh <093-976g Z he -fitiott•dct 4-;-.\-(cry\ \IV on4100A r � . he item before you is a rezoning for 13 acres northeast of the Windwood �� T Subdivision from A-O, Agricultural Open to R-1 , Single Family Residential oning for residential development of the tract. This e and a misnimum lot size of 50 trict carries a Pe maximum density of 8 dwelling units per acJby 100. 440o property is a 13 acre portion of a larger 77 acre tract a majority i The subject pr p y of which is in the Carter Creek Floodplain. The Comprehensive Plan designates this property as Residential, Medium Density, Park along the States easement and Floodplain for the remaining portions. The and is, Gulf floodplain is identified as greenways on the Greenways Master a priority 7. (1-6) Thep roperty has access from Brookway Drive a local si d entiastreet. The street has approximately 24 feet of pavement width. upon platting of the property, an additional access point will be required. fired. The Study W p g property is also impacted by the East College Station t connect Harvey L which proposes a thoroughfare through thisproperty Road to Switch Station Road by extending Associates Drive. As s study will you are aware, this study has not yet been adopted lowingfolyCity item �- ��ure Cjt�e� be addressed in greater detail in th This rezoning is affected by a proposed FEMA Letter d of oa dp Reviision the submitted by the City of Bryan. The LOMR if approve floodplain on this property. The blue line is the current floodplain as mi identified b FEMA, the yellow line is the applicants depiction of the li the of the ffloodplain presented in the LOMR. Staff believes that the1limits floodplain extend further into this property. Gym? l City Staff has requested that the applicant remove the portions of the floodplain based on the most conservative data in compliance with the Comprehensive Plan, however, to date, that has notbeen provided. Staff is recommending denial of the request due to res tohe impact l mit n the floodplain in keeping with Comprehensive Plan poli development ment in the floodplain and floodprone areas, as well as for issues of access.