Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 3 Project: First National Bank @ Manuel Dr. (Bank & Trust) - 07-005.00051 PLANNING 1. Please change the site plan title to reflect the new project name, owner, submittal date, etc. 2. Please provide the dimensions of the dumpster enclosure on the site plan. A plan view and elevation detail of the screening need to be provided on the site plan as well. Because of the visibility from Manuel Drive, gates will be required on the front of the enclosure for screening. The inside dimensions (inside bollards, etc.) for the type of service needed at this location is a minimum of 10x10 per container. 3. The dumpster pad appears to be curbed on all sides. Please remove curb from front loading area. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jennifer Prochazka Date: January 15, 2010 Engineering 1. No Comments Reviewed by: Carol Cotter Date: January 19, 2010 STAFF REVIEW COMMENTS NO. 3 Project: First National Bank @ Manuel Dr. (Bank & Trust) - 07-00500051 PLANNING 1. Please provide updated contact for this project. Currently, the contact information that we have (those who should be receiving staff comments) includes First National Bank and McClure & Browne Engineering. 2. The landscape plan needs to match the approved site plan. If the site plan has changed, the document on file with the City needs to be amended. The landscape plan shows several concrete pads (surrounded by bi-color iris) that are not shown on the site plan. One looks like it may be a dumpster enclosure (if this is the case, plan and elevation details of the screening need to be provided). Additionally, the landscape plan includes a "Phase II" that is not on the site plan. Is the site now intended to be phased? 3. The plan includes narrow gray lines which look to either be concrete flumes or walls. Please call out. If walls, please provide details. Any walls should also be reflected on a revised site plan. 4. Full screening (between 0-3' in height) is required between the parking spaces and Texas Avenue right-of-way (including adjacent to the western-most parking spaces on Manuel Drive. 5. Because the raised "drystack planter beds" are proposed in a PUE, please add the following note to the plan: "The property owner will be responsible for the replacement or repair of the raised planter beds constructed in the Public Utility Easement if it becomes necessary to remove them for utility construction or maintenance." 6. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jennifer Prochazka Date: December 31, 2009 STAFF REVIEW COMMENTS NO. 2 Project: FIRST NATIONAL BANK (MANUEL DR) (SP) - 07-00500051 PLANNING building being 1. How is the transition from the temporary structure to the permanent handled? As shown, a CO can not be granted to the permanent structure until the temporary structure has been removed. (REPEAT COMMENT) Reviewed by: Lindsay Boyer Date: April 20, 2007 STAFF REVIEW COMMENTS NO. 1 Project: FIRST NATIONAL BANK (SP) — 07-00500051 PLANNING 1 . How is the transition from the temporary structure to the permanent building being handled? As shown, a CO can not be granted to the permanent structure until the temporary structure has been removed. 2. The elevations do not currently meet the requirements of the Non-Residential Architectural Standards based on the following: • West Elevation — This facade is facing Manuel and therefore, must have 2 elements for every section of 45 feet. This elevation requires 2 different elements (43 feet in length). The façade has 2 pilasters, however the requirement calls for 2 different elements. See section 7.9.6.2 of the Unified Development Ordinance for design elements that may be used to meet this requirement. Additionally, no more than 60% of the roofline of this elevation may be on the same horizontal plane. • South Elevation — This facade must have two sets of 2 different elements. This façade has pilasters, recessed entry, and a wall plane projection greater than 4 feet. Another element is required. • North Elevation — This facade is not facing a ROW and therefore, must have 2 elements for every section of 60 feet — 2 elements total required. This elevation also has 2 pilasters of which one may count. If it is the intent to use the canopy and columns for the drivethru to meet this standard, then it must also meet the requirements along for the facade facing Manuel to have 2 elements for every 45 feet of the canopy and for the east façade to have 2 elements for every 60 feet of canopy. • East Elevation — This facade is not facing a ROW and must have 2 elements for every section of 60 feet (43 feet in length). There are pilasters, however another element is required. Reviewed by: Lindsay Boyer, Staff Planner Date: March 7, 2007 LANDSCAPING/STREETSCAPING/BUFFER 1 . Please correct the streetscaping calculations in the landscape legend - required Streetscape should be noted for Texas Avenue as 120/25 = 5 canopy trees, and for Manuel is 180 ft/32 = 6 canopy trees. 11 streetscaping trees are required within 50 feet of the ROW. This requirements has been met, however the calculations are incorrect. Reviewed by: Lindsay Boyer, Staff Planner Date: March 7, 2007 ENGINEERING NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 4 1. Is the Drainage Report for "First National Bank of Bryan Temporary Branch @ Manuel Drive" still valid for this project? If so, I have an extra copy from the first phase that I can put with this project. Reviewed by: Carol Cotter Date: March 8, 2007 FIRE 1. Site plan looks good for fire, no fire lanes required and the existing hydrant will work if it meets the fire flow requirement for the building. 2. Will need a Knox box for the building. Reviewed by: Jerry Duffey, Deputy Fire Marshal Date: 6March07 SANITATION 1 . Sanitation is ok with this project. Will probably keep the 90 gallon level of service currently being used. Reviewed by: Wally Urrutia / Rodney Harris Date: March 7, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights as required). 3. If applicable, the following easements will be required: GENERAL ELECTRICAL COMMENTS 1. Developer will furnish and install all conduit per CSU specs and design. 2. CSU will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for each riser pole. CSU installs riser. 4. Developer to intercept existing conduit at designated location or device, i.e. transformer, switch gear, etc. and extend as required. 5. If conduit does not exist at designated location or device, i.e. transformer, switch gear, etc. then the developer will furnish and install conduit as shown on electric layout. 6. Developer will pour all transformer pads (or pads for other devices as required) per CSU specs and design. 7. Developer will install pull boxes and secondary pedestals as per CSU specs and design (pull boxes and secondary pedestals provided by the CSU). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: gmartinez@cstx.gov. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 4 9. Developer will provide load data for project so that transformer and wire size can be determined. 10.To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 03/07/07 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 4 of 4