HomeMy WebLinkAboutLetter of Completion (11/15/2007) Deborah Grace-Rosier- Sonoma Phase 1.doc Page 1
III I
LETTER OF COMPLETION —
CITY ENGINEER DATE:1 C3/2/6 7
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS •
RE: COMPLETION OF 5a/N-0 L4'
Celam'c.�r U l.$i oN 47i7/d S Q-
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station,Texas. This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by
BfC--, 4()c lops er
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
JG/Blob
Sew 2 /o
Sl-t)ft-k — /O S'�v
SI-Ile c.0 _Loi 7/0-7 �
Owner:gcs i• //// r^
1,'''+,4 .t Contractor: /�/(,•4 f/.4 fri-r e
�D�
Phone Number: 1-1/��K11� Phone Number: S."‘g7/�� � f/3 6
RO
Address: • f( S�'f0•�whrtfo�SJ t-F Address: 41.s/ (<A
i. : tm� S�rco�2vc �ct�.y
II r o�
Signature:�� . �4 - Signature:_
ACCEPT APP VAL
City epresentative
t6bs
City Engineer
Revised 1131107
ReSe-erre etc-hedjetta-a c -v s 6e-LL ,zwksah.