Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 2 Project: SONOMA (FP) - 07-00500047 ENGINEERING 1. Please submit the appropriate construction documents and easement documentation for the off-site sanitary sewer extension from the Reatta Meadows Subdivision as illustrated on the Master Utility Plan. The construction documents cannot be approved, nor can the plat be filed until these items are resolved. 2. Please revise the engineers cost estimate as it reflects the lift station. The cost estimate should also reflect the off-site sanitary sewer extension from the Reatta Meadows Subdivision as illustrated on the Master Utility Plan. The cost estimate will need to be updated as that information is obtained. 3. As the terms of the off-site sanitary sewer extension from the Reatta Meadows Subdivision as illustrated on the Master Utility Plan are still unresolved the note on the construction documents stating "with separate contract" may not be appropriate at this time. 4. Please dedicate 10-ft easement along Barron Road, alongside the existing 10' H.O.A.C.A. easement, for electrical infrastructure. 5. Additional comments specifically related to the construction documents will follow as soon as possible, but will not affect the final plat going forward to P&Z. Reviewed by: Josh Norton Date: April 25, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: SONOMA (FP) - 07-00500047 PLANNING 1. Please provide the total number of lots in the title block. 2. Include acreage of Right-of-Way dedication for Barron Road. 3. Include General Note #3 from Preliminary Plat on Final Plat. Reviewed by: Grant Wencel, Staff Planner Date: March 12, 2007 ENGINEERING COMMENTS NO. 1 1. Please illustrate the temporary vehicle turn around for sanitation and emergency vehicles at the end of Silver Oak Drive and Field Stone Place. 2. The use of the sanitary sewer force main is not in compliance with the City of College Station Master Utility Plan for the sanitary sewer system or with the previously approved preliminary plat for the Sonoma subdivision. Although not required to, it is our understanding that City of College Station Utilities Department is in the process of working with the adjacent property owner to help resolve the existing stalemate. 3. This final plat may not go forward to P&Z, as the sanitary sewer issues are unresolved. 4. The construction document/ report comments will follow as soon as possible. Reviewed by: Josh Norton Date: March 12, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. If possible, we would like an additional 10' easement along Barron Road, alongside the existing 10' H.O.A.C.A. easement, for electrical infrastructure. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to breadcstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: March 7, 2007 SANITATION 1. Need to show temporary turnarounds for sanitation vehicles at two locations. The south end of Silver Oaks Dr. The east end of Field Stone Place. Reviewed by: Wally Urrutia / Rodney Harris Date: March 7, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3