Loading...
HomeMy WebLinkAboutStaff Comments('H Y OF C OL LEGE STMION Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM May 15, 2006 TO: Hunter Goodwin, Applicant via fax #979.846.7020 FROM: Crissy Hartl, Staff Planner SUBJECT: LAYNES (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing -,with the revised site plan, please attach a letter explaining the details. As a reminder, a facilitation meeting has been scheduled for Tuesday, May 16 at 2:30 pm in our conference room. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Four Ags Investment, LLC via fax #979.691.5787 Gessner Engineering, LP via fax #979.680.8841 Case file #06-00500099 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: LAYNES (SP) — 06-00500099 PLANNING l 1- FYI — Our Transportation Planner, Ken Fogle, is currently reviewing this site plan for drive- thru queing standards and other issues. Additional comments may arise from his review. W' 12. Please show the entire property, including the first phase so that staff can review the circulation of the site as well as how this phase will affect the rest of the property. Based on this comment, please be aware that additional comments may be made on the second submittal that could not be made on this submittal. /J 3. The first site plan for this property indicates that both pad sites along Wellborn Road will be developed as a part of Phase II. This means both pad sites will have to have to be built before a Certificate of Occupancy is issued for any building. You also have the option of / calling the remaining pad site 'Phase III'. Please inform staff of your preference. �'J 4: Please provide a key map on the site plan giving a general location of the subject property. . �5. ,-'Provide the name, address, and telephone number of the applicant and property owners. . Please show the ownership and current zoning of parcel and all abutting parcels. Please show all building setbacks for this phase. 8 Per section 7.7.0 Solid Waste — Minimum Requirements, dumpster screening shall be at least as tall as the dumpster and may be achieved through the use of buildings, fences, or walls. Plant material may be used to supplement the screening. Please verify that solid screening will be provided and include a profile of the screening on the site plan. 9. The eight (8) parking spaces on the east side of the building and the eight (8) parking spaces on the north side of the building that are shown on the property cannot be counted for thisn� building as they were included in Phase I calculations. Also, please be aware that this building will require 24 parking spaces as restaurants with drive-thrus require one (1) parking G -C` space per 100 sf. v, /10. Please clearly show the bounds of the building on the site plan and identify what the remaining area will be used as. Please be aware that outdoor eating areas will be included in the building square footage and additional parking will be required. ,/fl. Please provide a parking legend that states how many parking spaces are required for this1 ti phase and how many will be provided. Also, please dimension the parking spaces on the sitep plan. ✓°f2. As a part of the review for non-residential buildings, please provide building elevations, color samples, and materials list including total percentage colors and materials used on all -`.PCAv'OWI+itj 0, elevations. VCL r talrl0� `ry ,,-13. Show and label existing streets and sidewalks and include the right-of-ways. g ! :, �4. Please provide bicycle parking facilities to accommodate at least 4 bicycles. 9, v1'5. Please identify the order board along the drive-thru and other such related amenities. mo, url V,. Vf6 Please dimension all drive aisles. v6 Provide a general note that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. Reviewed by: Crissy Hartl Date: May 9, 2006 LANDSCAPING/STREETSCAPING/BUFFER A. Please be aware that all of the required landscaping points for Phase II must be installed before a Certificate of Occupancy can be issued. If you choose to separate the two pad sites into separate phases, please be aware that the minimum number of points that a site is required is 800 points. Please adjust the landscape accordingly. 2. The legend should clearly state the point value of each plant or tree, the number provided, and the total number of points. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and 'bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ...:3. Please provide parking screening along 100% of right-of-way, such as 1 shrub for every 3 feet of frontage, or by use of berms, structural elements, or combinations thereof. Screening must be a minimum of 3 feet tall. If a berm is existing, please identify it on the site plan. 4. Please provide the streetscape requirements and irrigation plan for Phase I to verify that it has been met for future reference. ,,,, 5. Please be aware that Compact Nandina is not an approved shrub on our Plant List. Please choose a shrub from the approved plant list. 6. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Reviewed by: Crissy Hartl Date: May 9, 2006 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING 1. Show all existing and proposed easements on Site Plan. Existing easements need to reference volume and page. 2. The pavement under dumpster conflicts with Detail C/D provided on Sheet 5.1. What is the reinforcement for the 8" pavement? 3. Provide Erosion Control Plan. 4. Please review Details B, C and D. They may not be titled correctly, and all mention expansion joint material. 5. Will the underground electrical be relocated? Reviewed by: Carol Cotter Date: May 12, 2006 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer to intercept existing conduit at designated transformers and extend as required. 4. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 5. Meter will be located on building. 6. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to gmartinez(a)cstx.gov 7. Developer provides load data for project as soon as it is available. 8. To discuss any of the above electrical comments, please contact Gilbert Martinez at 979.764.6255. Reviewed by: Gilbert Martinez Date: 05-12-06 SANITATION COMMENTS 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: May 15, 2006 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3