HomeMy WebLinkAboutStaff Review Project: THE FACTORY (SP) — 06-00500274
ENGINEERING COMMENTS NO. 3
1. Provide a letter or report which satisfies the Fire Code requirements: i.e.
proposed building square footage, building construction type (fire retardence),
flow, and number of hydrants, etc. I have faxed the engineer the applicable
Fire Code excerpts.
2. Revise the Site Utility Plan in accordance with the proposed sanitary service
realignment. The proposed service will need to be in accordance with the
standard service details within the ROW. The manhole the service was
previously intended to be connected to will need to be noted to be plugged by
pulling the rubber boot and grouting.
3. Relocate the 2" irrigation backflow preventor out of the street.
4. Provide the standard pavement cut/repair detail ST4-01.
5. FYI - a public access easement is required for the portions of the sidewalk on
private property. This must be submitted and accepted prior to C.O.
Reviewed by: Alan Gibbs Date: 3/9/07
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled" on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 2 of 2