HomeMy WebLinkAboutStaff CommentsFebruary 27, 2004 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Rabon Metcalf, RME, Via fax 690.0329 V FROM: Bridgette George, Asst. Development Manager SUBJECT: CS MED CENTER BED TOWER (SP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: $200 processing fee for the next round of three (3) staff reviews; and, Six (6) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached; Two (2) revised site; and One (1) landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call Jennifer Reeves or myself at 979.764.3570. Attachments: Staff review comments cc: Frank Hartman, CS Hospital, Via fax 764.5155 David Watkins, AIA, 214.775.6201 Case file # 03-00500265 STAFF REVIEW COMMENTS No. 4 Project: CS MED CENTER BED TOWER (SP) - 03-00500265 PLANNING 1. Please show dimensioned parking spaces. 2. The parking spaces at the end of your parking rows will need to be screened from the right-of-way. 3. (FYI) You are showing tree protection for existing trees that will count toward your landscape and streetscape point requirement. Please be aware that if there is any disturbed earth within the drip line of these trees during construction, they cannot count as protected points. Reviewed by: Jennifer Reeves Date: 02-26-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 October 30, 2003 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM TO: Rabon Metcalf, RME, Via fax 690.0329 FROM: Bridgette George, Assistant Development Manager SUBJECT: COLLEGE STATION MED CNTR BED TOWER (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached Easement Dedication Sheet and required documents. Please note that the Easement Dedication Sheet and the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Frank Hartman, CS Hospital, LP, Via fax 764.5155✓ David Watkins, AIA, Perkins & Will/CRA; Via fax 214.775.6201 Case file #03-00500265 Home of Texas A&M University STAFF REVIEW COMMENTS NO. 1 Project: COLLEGE STATION MED CNTR BED TOWER (SP) — 03-265 This is a stop review. This review does not constitute a complete review. A development plat is required and thoroughfare issues need to be resolved prior to site plan approval. PLANNING 1. Please include the contact information for the property owner on the site plan. 2. Please show the gross square footage of the tower. 3. Sheets C-3 through C-6 were not included with the submittal; therefore, the details that are references to these pages can not be reviewed. 4. Where is the sound barrier wall being constructed? 5. Please identify ANSI ramp locations. 6. Please identify how parking needs are being determined. 7. All drive aisles between two rows of parking will need to be a minimum of 23 feet wide. 8. Please show the location of the existing fire lane. 9. Provide a general note that all roof and ground -mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right- of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. LAN DSCAPING/STREETSCAPING/BU FFER 1. Please show a phase line that covers all new improvements to the site. 2. Please identify the area and required point calculations for the phase. 3. If this phase includes the land abutting Birmingham, please provide more complete screening of the parking lot and streetscaping. 4. Each crepe myrtle trunk needs to be 1.25" caliper. Please provide this information in the legend. 5. Live oaks needs to be planted a minimum of 35 feet from other live oaks. 6. The total points shown in the legend is equal to 9630. 7. Please provide an irrigation plan or a note that an irrigation system to service all new plantings will be installed by a certified installer before a C.O. will be issued. 8. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Reviewed by: Molly Hitchcock Date: October 27, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 2 of 3 ENGINEERING 1. A Development Plat is required. 2. The Site Plan should show the required thoroughfare. 3. Provide grading and drainage information. 4. Provide utility information. 5. Provide paving and curbing details. Reviewed by: Carol Cotter Date: October 30, 2003 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of #4 rigid conduit for riser poles. Developer installs first 10'. City installs remainder. 3. Developer pours transformer pad(s) per city specs and design. 4. Developer installs pull boxes as per city specs and design.(pull boxes provided by the city. 5. Developer provides digital AutoCAD 14 version of plat and/or site plan. email to rbolinCa),ci.college-station.tx.us 6. Developer provides load data for project. 7. Developer provides temporary blanket easement for construction purposes. 8. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Reviewed by: Ronnie Bolin Date: MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double -Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 3 of 3 November 18, 2003 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 TO: Rabon Metcalf, RME, Via fax 690.0329 FROM: Bridgette George, Assistant Development Manager SUBJECT: CS MED CENTER BED TOWER (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Frank Hartman, CS Hospital, LP, Via fax 764.5155 David Watkins, AIA, Perkins & Will/CRA; Via fax 214.775.6201 Case file #03-00500265 Home of Texas A&M University I LAI: f : 2V:&TJ[*TTK61*1JUIT,I: 4 k1l kIRIki[�I�a Project: CS MED CENTER BED TOWER (SP) - 03-265 PLANNING 1. Please show the location of the existing fire lane. LAN DSCAPING/STREETSCAPING/BUFFER 1. There is no buffer requirement between commercial and commercial properties. 2. Please provide point totals in the Landscape Schedule. 3. Each crepe myrtle cane needs to be 1.25" caliper. Please provide this information in the Landscape Schedule. 4. Please remove the tree replacement information from the plan. It was not intended for sites that were still developing. Reviewed by: Molly Hitchcock Date: November 17, 2003 ENGINEERING 1. The temporary fire water line under the plant expansion will not be allowed. Relocate the line or utilize a vault with double check valves and make the line a private line. 2. Plan and profile are required for the public fire water line. 3. Please show existing and proposed easements on Utility Plan. 4. Make sure the existing 8" sanitary sewer is covered by a PUE. 5. The private 6" sanitary sewer line cannot be located in the PUE. 6. Where is domestic line between the plant expansion and the bed tower being metered? 7. The 8" private sewer line on the west side on the expansion requires a manhole instead of a cleanout. 8. The note for the 6" cleanout on the 6" sewer line shows a flow line for an 8" line. Is the private sewer line an 8" or 6" line? 9. Provide detail of backfill with cement stabilized sand. 10. Type II curbing is not allowed. Reviewed by: Carol Cotter Date: November 14, 2003 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. f�.tOM