HomeMy WebLinkAboutCorrespondence (1)kff CITY OF COLLEGE STATION the heart of the Research Valley February 14, 2007 Jane Kee, A.1.C.P. IPS Group 511 University Drive East, Suite 211 College Station, TX 77840 RE: Multi family Development on Property in Wolf Pen Creek District (Miles Construction Corporation) Dear Jane: This letter is to confirm administrative acceptance of a fee in lieu of land for the required dedication fee for the proposed multi-family development by Miles Construction Corporation, which fronts on George Bush Drive. If your client so chooses, anagreement may be considered to allow the developer to construct sidewalk improvements adjoining the development in the Wolf Pen Creek District as part of the site plan process, that will be of equal value to the required development fees, in place of paying the fee. This is allowable under the requirements of the Park Land Dedication Ordinance. If I can be of any further assistance, please contact me at (979) 764-3413. Sincerely, \,41z(241 Stephen C. Beachy Director Parks and Recreation Department City of College Station pas P.O.BOX 9960 1101 TEXAS AVENUE COLLEGE STATION•TEXAS•77842 979.764.3500 www.cstx.gov 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM November 27, 2007 TO: Bo Miles, JP Miles Construction via fax 846-7860 FROM: Lindsay Boyer, Senior Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 processing fee for the next round of three (3) staff reviews; One (1) complete sets of civil construction documents for the proposed development; One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Brett McCully, Bleyl Engineering via fax 260-3849 Case file #07-00500036 m g Bleyl & Associates 1722 Broadmoor & Suite 210 Project Engineering & Management Bryan, TX 77802 A P4-Q December 3,2007 0 _ 0 1)-0 Lindsay Boyer V� - Planning&Development Services City of College Station C P.O. Box 9960 `� City of College Station College Station,TX 77842 Re: Wolf Creek Apartments SDSP 07-00500036 Dear Lindsay, This information is provided in regarding comments received 11/29 from Carol Cotter and yourself regarding this project. Following each comment is our response in italics. Planning 1. All phases must meet site plan requirements. There must be an end island at the end of each parking row as it is phased. You can adjust the phase lines to incorporate the existing parking islands. First of all,phasing is shown for this project for the purposes offacilitating Certificates of Occupancy on some buildings (the phases) before the entire site is complete and ready for final inspection. We can (and have) easily move the line dividing phases 2 and 3 to address this comment. However; the line between phases 1 and 2 cannot be shifted more than a few feet east due to drainage issues, and cannot be shifted west due to parking requirements. Therefore we are showing a temporary end island that apparently will be needed in order to allow the development of phase one, but which will be removed prior to completion of phase 2. 2. Please make note that the bedrooms for the 2-bedroom units are less than 130 sf in size. Otherwise there is not sufficient parking. This note has been added to the site plan. 3. Curbing note should state that all pavement edge will have 6 inch raised monolithic curb. The site plan curbing note has been revised to indicate the 6 inch height, however the City standards allow 2-part curbing, so the word `monolithic'was not included. 4. Will these changes to the building layout change any of the issues regarding the fire coverage for buildings over 30 feet in height? No, the minor shifts still fall well within the ladder truck envelope used to approve the first site plan. 5. With the construction being done in phases,how is turnaround being provided for fire and sanitation? The end of phase 1 is within the allowable backing distance to George Bush East so a turnaround is not required Phase 2 includes the turnaround that is required for the rest of the site. Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM November 27, 2007 TO: Bo Miles, JP Miles Construction via fax 846-7860 FROM: Lindsay Boyer, Senior Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 processing fee for the next round of three (3) staff reviews; One (1) complete sets of civil construction documents for the proposed development; One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Brett McCully, Bleyl Engineering via fax 260-3849 Case file #07-00500036 J. P. Miles Construction Corporation P.O.Box 10467 17 1 tp 1005 University Drive East \// t) College Station,Texas 77842 WWW" Phone(979)777-4675 Fax(979)846-7860 December 16, 2007 Ms. Lindsay Boyer City of College Station 1101 Texas Avenue College Station, Texas 77840 Re: Wolf Creek Condos Lindsay, Architectural plans including elevations that you requested are attached. In your last review comments you requested a set for your file. Brett McCully with Bleye Engineering has made the minor changes requested and re- submitted the documents. Let me know if you need any additional information. Thanks -And if I don't see you. Have a blessed Christmas. Bo Miles J P Miles Construction Corporation enclosure 4ff"414 CITY OF COLLEGE STATION Planning&Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 13, 2007 TO: Bo Miles, JP Miles Construction via email FROM: Lindsay Boyer, AICP, Senior Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set); Two (2) revised site plans; One (1) landscaping plan; and One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Brett McCully, Bleyl Engineering via fax 260-3849 Case file #07-00500036 Home of Texas A&M University m g Bleyl & Associates 1722 Broadmoor & Suite 210 Project Engineering & Management Bryan, TX 77802 A P4-Q December 3,2007 0 _ 0 1)-0 Lindsay Boyer V� - Planning&Development Services City of College Station C P.O. Box 9960 `� City of College Station College Station,TX 77842 Re: Wolf Creek Apartments SDSP 07-00500036 Dear Lindsay, This information is provided in regarding comments received 11/29 from Carol Cotter and yourself regarding this project. Following each comment is our response in italics. Planning 1. All phases must meet site plan requirements. There must be an end island at the end of each parking row as it is phased. You can adjust the phase lines to incorporate the existing parking islands. First of all,phasing is shown for this project for the purposes offacilitating Certificates of Occupancy on some buildings (the phases) before the entire site is complete and ready for final inspection. We can (and have) easily move the line dividing phases 2 and 3 to address this comment. However; the line between phases 1 and 2 cannot be shifted more than a few feet east due to drainage issues, and cannot be shifted west due to parking requirements. Therefore we are showing a temporary end island that apparently will be needed in order to allow the development of phase one, but which will be removed prior to completion of phase 2. 2. Please make note that the bedrooms for the 2-bedroom units are less than 130 sf in size. Otherwise there is not sufficient parking. This note has been added to the site plan. 3. Curbing note should state that all pavement edge will have 6 inch raised monolithic curb. The site plan curbing note has been revised to indicate the 6 inch height, however the City standards allow 2-part curbing, so the word `monolithic'was not included. 4. Will these changes to the building layout change any of the issues regarding the fire coverage for buildings over 30 feet in height? No, the minor shifts still fall well within the ladder truck envelope used to approve the first site plan. 5. With the construction being done in phases,how is turnaround being provided for fire and sanitation? The end of phase 1 is within the allowable backing distance to George Bush East so a turnaround is not required Phase 2 includes the turnaround that is required for the rest of the site. Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax 6. On the landscaping plan,I only counted 3 Bicolor Iris in phase 3. Although these plants are not required due to our large surplus of landscaping points, we have clarified the landscaping plans, 7.Again on the landscaping plan,I only counted 96 Heavenly Bamboo in Phase 2(instead of 98— the phase line is drawn so that the island would not be constructed),and 60 Heavenly Bamboo in Phase 3 (instead of 58). With the shifts in phase lines, we have recalculated these requirements, as well as our tabulation showing that this plan is far in excess of city requirements. 8. Provide updated façade details for our files. This comment has been relayed to the Developer. 9. Clearly label the pedestrian access ways to the trails. The site plan currently includes clear labels for both pedestrian access ways. If there is some other required means of noting this element, we request an example. 10. Please note that any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on you plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Noted. Engineering 1. Will water, sanitary sewer, and storm drain be constructed with Phase 1? If not, show effects on system with partial installation. As mentioned above, the phasing shown is for the purpose of facilitating Certificates of Occupancy on some buildings before the entire site is ready for final approval. All water and wastewater improvements will be constructed with the first phase. Because the line between phases 1 and 2 is a crest grade break in the paving, the phase 1 drainage improvements can stand alone if the developer wants to delay the rest of the paving until the first two buildings get going. Phase 2 includes all drainage improvements to serve Phases 2 and 3. 2. If the water line being extended by the adjacent River Oaks project is constructed before yours, you will need to connect to it in lieu of the blow-off. A note has been added to this effect on the water plant. 3. Off-site drainage profile#2 does not appear to match plan view. Is there still an inlet grate? Show flowline in at junction box. The profile is intended to only apply to the public portion of the line,from the junction box downstream. We have added the flowline-in elevation and corrected the top elevation note to indicate that this is solely a junction box and not an inlet. 4. Is the 5' wide curb opening now an inlet(Drainage#2)? Yes, this has been clarified on the plan. 5.Provide amendment to drainage report/letter for modified Drainage#2. Attached. 6. Proposed pedestrian access call note needs to be shifted. The leader line has been corrected. 7. Private sanitary sewer service line cannot be located in the PUE. Why not make it public?It can end in a cleanout if line is less than 4' deep. The line was revised to make it public upon our last submittal, including changes to grades and pipe materials, but one note was missed This has been corrected I would like to take a moment and remind you both that I am readily available for questions or discussions on any element of any of our projects. If a question arises during your review, I would much rather we speak about it via phone or in person to quickly resolve any confusion, rather than spend lots of combined time writing comments and responses to each other. Sincer-ly, Brett Cully,'. Sr. Engineer :ranch Manager CC: Carol Cotter Encl: Drainage Report Amendment c1 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM October 25, 2007 TO: Jane Kee, IPS Group via email jane@ipsgroup.us FROM: Lindsay Boyer, AICP, Senior Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Bo Miles, JP Miles Construction via email Brett McCully, Bleyl Engineering via email Mike Record, Arkitex Studio via email Case file #07-00500036 0. 1WO13 1D • V•Di- B Bleyl & Associates 1722 Broao.; :.r _ & Sui Illik A Project Engineering & Management Bryan, TX 77802 IIU lllllill 11111111 October 8, 2007 Ms. Carol Cotter, E.I.T. Development Services City of College Station P.O. Box 9960 College Station, Texas 77842 RE: WOLF CREEK CONDOMINIUMS, COLLEGE STATION, TEXAS Dear Ms. Cotter: Transmitted under this cover are 7 copies of the revised construction plans for the referenced project. Key elements changed in this submittal include: 1. Adding ADA space and ramp in front of Building 6. Proposed sidewalk elevations were checked for ADA compliance. 2. The main drive aisle was widened to 26' inside by shifting the northern curb north. 3. A small sidewalk section within the access easement at the end of the turnaround was added. 4. All proposed water mains are now 8" in diameter. 5. Added the public sewer replacement of the existing 8" VCP from the Arbors at Wolf Pen apartments east to the 15" line at River Oaks Town Homes. The line west of the existing manhole from the Arbors will remain private. 6. The existing trees are still shown on the plans, but have been removed from the point calculations. Please contact me if you have any questions or require any other information for your review. Sincerely, '4' Brett A. McCully, P.E. Senior Engineer 2Y 4 (\ Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax B • B l eyl & Associates 1722 Broadmoor Suite 210 iiiik& A Project Engineering & Management Bryan, TX 77802 Ill]li tlll 111 ll1il11 Lindsay Boyer, Staff Planner Date 5/1/2007 Job No. 7040 City of College Station Attn: Lindsay Boyer, Staff Planner P.O. Box 9960 Re: Wolf Pen Condominiums College Station, Texas 77842 (979) 764-3570 We are sending you: X Attached Under separate cover via: The following items: Shop drawings Prints Plans Samples Copy of letter Change order Specifications X Other See Below Copies Date No. Description 8 5/1/2007 7040 24"x 36" Construction Plans 2 5/1/2007 7040 24"x 36" Site Plans 2 5/1/2007 7040 24"x 36" Landscaping Plans 1 4/9/2007 7040 11"x 17" Erosion Control Plans These are transmitted as checked below: X For approval For review For your use As requested For bids due: 7 Signed �� : •tt cC y, P.E. Seni• Engineer/Branch Manager Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax - B Bleyl & Associates 1722 Broadmoor & Suite 210 Project Engineering & Management Bryan, TX 77802 A April 16,2007 Lindsey Boyer Planning and Development Services City of College Station P.O. Box 9960 College Station,TX 77842 Re: Wolf Creek Condos Plan Revisions Dear Lindsey, As we discussed by phone,a DRB member is not in agreement with the plant selection used for the dumpster screening chosen by our Landscape Designer. Therefore we have revised the landscape plan to incorporate the Nandina Compacta as requested. In order to expedite the approval process,we have changed ALL the Elaeagnus shrubs to Nandina on the plan. We anticipate that during the construction process,we will submit a revised plan showing where each of the plants are desired by the owner,with the understanding that the Nandina will be ultimately required adjacent to the trash enclosures. Also as we discussed,we have revised the drainage release points,and have included detail and profile information on the pipes used with these plans. While separate profile blocks are not included for these short pipe reaches,the details for each pipe include all profile related information required. We have included 7 copies for each of the affected sheets for your review. Since you already have 7 full sets of the remaining documents,the new sheets can be incorporated into the final sets for approval. Thank you again for your assistance. 1 GOMA Sinc-ii gi , eitR, AOC\-- V\le rett Mc r ull .E. t Sr.Engi eer/Branch ManagerJam(.2.1 f VeriLt'JW-'v Cc: Jane Kee Bo Miles ,Q).\( 50 S y;'C-:-.-k . . ,ice \ Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax (11111k,111111111111 CITY OF COLLEGE STATION Planning 6.Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM April 23, 2007 TO: Jane Kee, IPS Group via email jane@ipsgroup.us FROM: Lindsay Boyer, Staff Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Bo Miles, JP Miles Construction via fax 846-7860 Brett McCully, Bleyl Engineering via fax 260-3849 Mike Record, Arkitex Studio via fax 846-8224 Case file # 07-00500036 _.I3. 71,\ HAE Bleyl & Associates �� 1722 Broadmoor LSuite 210 A Project Engineering & Management �1 Bryan, TX 77802 11111111111111111111 ,( Lindsay Boyer, Staff Planner Date 4/9/2007 Job No. 7040 City of College Station Attn: Lindsay Boyer, Staff Planner P.O. Box 9960 Re: Wolf Pen Condominiums College Station, Texas 77842 (979) 764-3570 We are sending you: X Attached Under separate cover via: The following items: Shop drawings Prints Plans Samples Copy of letter Change order Specifications X Other See Below Copies Date No. Description 1 4/9/2007 7040 Design Letter 7 sets 4/9/2007 7040 24"x 36" Construction Plans 2 4/9/2007 7040 '24"x 36" Site Plans 1 4/9/2007 7040 24"x 36" Landscaping Plans _ 1 set 4/9/2007 7040 11'x 17" Grading & Erosion Plans These are transmitted as checked below: X For approval For review For your use As requested For bids due: 1/ Signed /,'' : 't i ,s , -.E. Seni. E .ineer/Branch Manager Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax CITY OF COLLEGE STATION Planning e4'Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 26, 2007 TO: Jane Kee, IPS Group via email jane@ipsgroup.us FROM: Lindsay Boyer, Staff Planner SUBJECT: Wolf Creek Condos Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: $200 processing fee for the next round of three (3) staff reviews; and, Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site One (1) landscaping plan One (1) 11x17 grading and erosion control plan If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Bo Miles, JP Miles Construction via fax 846-7860 Brett McCully, Bleyl Engineering via fax 260-3849 Mike Record, Arkitex Studio via fax 846-8224 Case file #07-00500036 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 2 B Bleyl & Associates 1722 Broadmoor & Suite 210 Project Engineering & Management BryanTX 77802 cx IL1L\A March 2, 2007 Lindsay Boyer, Staff Planner Planning and Development Services City of College Station P.O. Box 9960 College Station, TX 77842 Re: Wolf Creek Condos Response to March 9th Comments Dear Lindsey, The following should list our responses to your March 9th review comments regarding this project. PLANNING 1. Minimum throat width for multi-family two way driveways is 24 feet. The dimension shown is 23 feet. Please revise. We have widened the driveway to 24 feet. ENGINEERING 1. Fire flow/water design report needs to show that the proposed improvements meet the requirements of the BCS Unified Design Manual with regard to pressure and velocity. This needs to be shown for both scenarios; the 6" line as dead end, and ultimate connection to water line from Jim Stewarts property. A more detailed water design report is attached for your use. 2. Waterline fittings and valves under pavement? As described in our last comment response letter, the water line cannot be shifted to move the fittings out from under paving without removing several significant existing trees or violating TCEQ separation distances from sanitary sewer facilities. The Wolf Pen Creek Design District Guidelines encourage existing trees to be protected and accommodated in new project design with the same strength that the Uniform Design Guidelines Bryan Austin Conroe (979)-268-1125 (512)-328-7878 (936)-441-7833 (979)-260-3849 (512)-328-7884 Fax (936)-760-3833 Fax encourage waterline fittings to not be under paving. It is our professional opinion that the current straight alignment with few fittings under paving is preferable to either removing the six mature trees necessary to shift the fittings out from under the paving, or the numerous additional fittings which would be required to zig-zag the waterline back and forth between the buildings and the paving while still trying to dodge the trees. If it is Staff's position that the waterline issues should take priority over the existing trees, we will require Staff to support that position at the project Design Review Board meeting on March 19th. 3. I did not receive the initial Drainage Report/letter that we discussed. Please provide. I have combined the two previous drainage submittals into the attached report. 4. Drainage report/letter needs to certify that drainage design meets provisions of COCS Drainage Policy and Design Standards and explain how. (Include primary channel verbiage and why detention is not required.) This has been included in the revised drainage report. 5. What are discharge quantities and velocities at each discharge point? These have been included in the revised drainage report. 6. Grading Plan doesn't have enough information to accurately tell what final grade/drainage areas will be. We have included drainage area maps in the drainage report to help clarify the existing and proposed drainage patterns. 7. I do not see the cleanouts you say were added to the private sanitary sewer plans. Cleanouts are required every 100'. Cleanouts will be located at the connection of each building service line to the private collection line, which will not exceed 100 feet in spacing. 8. Shouldn't the curvature note read "...be no less than 220' radius"? Curvature info needed on other bends. We have clarified the note and applied it to all pipe curves. 9. Provide information on the meter banks. What size are water service headers? We have included a detail of the header design and meter bank for review including this information. As always, we stand ready to meet and discuss any issues regarding this project at your convenience. Sinc-rely, 1 // B ett fC lly,P.E. Regional Manager Cc: Jane Kee End: Water System Design Report Drainage Report (*firli44 CITY OF COLLEGE STATION Planning 6Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM March 9, 2007 TO: Jane Kee, IPS Group via email jane@ipsgroup.us FROM: Lindsay Boyer, Staff Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Bo Miles, JP Miles Construction via fax 846-7860 Brett McCully, Bleyl Engineering via fax 260-3849 Mike Record, Arkitex Studio via fax 846-8224 Case file #07-00500036 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM February 26, 2007 TO: Jane Kee, IPS Group via email jane@ipsgroup.us FROM: Lindsay Boyer, Staff Planner SUBJECT: WOLF CREEK CONDOS - MILES (SDSP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) complete set of construction documents for the proposed development with the revised site and landscaping plans attached Easement Dedication Sheet and required documents (please allow 4 weeks to process). $4320 Parkland Dedication fees prior to issuance of a building permit. Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Bo Miles, JP Miles Construction via fax 846-7860 Brett McCully, Bleyl Engineering via fax 260-3849 Mike Record, Arkitex Studio via fax 846-8224 Case file #07-00500036 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. Page 1 of 4 3-� b7 IPS Group,w4i440 Planning Solutions MEMORANDUM March 2, 2007 TO: Lindsay Boyer, Staff Planner FROM: Jane Kee, IPS Gr. p SUBJECT: WOLF CREEK CONDOS MILES (SDSP)- Site Plan (Case file #07- 00500036) Attached please find: 10 copies each of site and landscape plans. Three (3) complete set of construction documents for the proposed development with the revised site and landscaping plans attached TEMPORARY BLANKET OCNSTRUCTION EASEMENT ALREADY DEDICATED AS NOTED ON PLAT (3916 / 196) Parkland Dedication fees will be paid prior to issuance of a building permit. Construction documents will be submitted before Monday deadline. PLANNING 1. Provide key map. Done 2. Provide legal description of the property. Done 3. Show the ownership of the WPC dedication property (City of College Station). Done 4. Note the density of the development. Done 5. Provide the gross square footage of all buildings. Done 6. Provide building height of all buildings. Noted on elevation drawings 7. Provide color and material samples for review by the Design Review Board. Previously Submitted. 8. Dimension driveway throat depth and width. Done 9. Provide typical parking space dimension. Done 10.Show handicap parking spaces. None Required 1 1 Clearly show all easements. Done 511 University Drive East, Suite 211 College Station, TX 77840 979-846-9259 www.IPSGroup.us 12.Turnaround for emergency vehicles must also be paved and striped to fire lane standard. Done 13.Show detail for solid waste pad site with dimensions and note the screening method used. Done 14.AII signs are through a separate permit. Please submit an application for sign review in a design district, with the details for the Design Review Board to review. Understood. 15.Provide specifications for the bench and light pole that are used by Parks. Noted on 11X 17 drawings submitted. 16.Provide detail of the mail kiosk. Will be addressed later as a minor change as code allows if applicant decides to have a kiosk. 17.How is trail connection being maintained between Wolf Creek Condos and The Arbors? There is no existing trail connection to the Arbors. Reviewed by: Lindsay Boyer, Staff Planner Date: February 23, 2007 LANDSCAPING/STREETSCAPING/BUFFER 1. Existing trees must be at least 4-inch caliper to receive 40 points without a barricade. Please note this in the landscape legend. Note has been added. 2. Mountain cedar is not on the approved plant list. Points credit for saving this species has been removed from calculations. 3. Provide a general note on the landscape plan that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback, rights-of-way, and adjacent property disturbed during construction. Note has been added. 4. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. Note has been added. 5. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. Note has been added. Reviewed by: Lindsay Boyer, Staff Planner Date: February 23, 2007 ENGINEERING COMMENTS NO. 1 1. Provide fire flow report. Done. 2. Will buildings have fire sprinkler systems? Nc 3. Provide drainage report/letter. Done. 4. Drainage is required to discharge to defined channel. Drainage release point has been rerouted to existing channel at property line. 5. Show location of floodplain and floodway per 1999 LOMR . Done. 6. Private sewer cannot be placed in PUE, only crossings are allowed. The private sewer has been shifted completely outside the public easement. 7. Private sewer shall meet plumbing code. Additional cleanouts are required. What is the slope? Cleanouts and slope has been added. 8. Shift the water line to the north, so that fittings and valves will not be located under pavement. Water line cannot be shifted north without eliminating significant existing trees, specifically discouraged in this design district. 9. Water line - Additional valves are required, two on every tee. Valve also required within 200' of temporary dead-end line. The existing line in George Bush has an existing valve as shown on the water plan which precludes the additional 12 inch valve. The first fire hydrant tee is too close to the 12 inch line to require another line valve. The second fire hydrant tee has the dual valves as requested. 10.Blow-off required at end of water line. A blow off has been added in case this project seeks acceptance of water improvements before the adjacent Stewart project makes it's required connection. 11.Station all water service(s). The water services have been gathered into header areas and stationed. 12.Maximum distance of 6" line is 1500 feet when connected on both ends to 8" line or larger. What is the timeline for the connection to adjacent property's water line? What is contingency if line not constructed by adjacent property? It is our understanding that the adjacent Stewart Project is less than a month behind this project, and is required to tie into this line to obtain fire flow. However, since this line is only roughly 800 feet in length, it falls within the requirements anyway. 13.Only one fire hydrant is allowed on a 6" line unless connected on both ends to 8" line or larger. What is contingency if line not constructed by adjacent property? As mentioned before, we anticipate the adjacent connection within the same construction time line. Our only contingency would be to further cut up the 12 inch line in George Bush by tapping our first fire hydrant directly to it, thus meeting the letter of the requirements at the expense of the line in George Bush. We will allow the City to make the determination on which is preferred. 14.Provide radius of curvature for pipe deflections. Done 15.Show limits of structural backfill. Done 16.Include BCS Unified Details. Done 17.Provide "Letter Acknowledging Standards". Done Reviewed by: Carol Cotter Date: February 26, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. Said easement already exist onsite. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). Understood. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. Understood. 2. City will provide drawings for conduit installation. Base drawings have already been provided to CSU. 3. Developer provides 30' of rigid or IMC conduit for each riser pole. City installs riser. Understood. 4. Developer to intercept existing conduit at designated device or location and extend as required. Understood. 5. If conduit does not exist at designated device or location the developer will furnish and install all conduit as shown on electrical layout. Understood. 6. Developer pours transformer pad(s) per City specs and design. Understood. 7. If pull boxes and secondary pedestals are required the developer will install them as per City specs and design (pull boxes and secondary pedestals provided by the City). Understood. 8. Developer will provide CSU Electric Department with a digital (AutoCAD 2000 or later version) of plat and/or site plan. Email to: gmartinez@cstx.gov. Base drawings have already been provided to CSU. 9. Developer will provide load data for project so that transformers can sized be ordered. Base drawings have already been provided to CSU. 10.To discuss any of the above electrical comments please contact Gilbert Martinez at 979.764.6255. Base drawings have already been provided to CSU. Reviewed by: Gilbert Martinez Date: 02/21/07 SANITATION 1. Will need at least 3-300 gal. containers for the amount of units. We have added one container to total 3. We place 1-300 gal for every 8 units at our 4-plex and town-homes locations that normally utilize this type of service. Understood. Reviewed by: Wally Urrutia Date: February 21, 2007 FIRE 1. No comment. Reviewed by: Jerry Duffey Date: February 26, 2007