HomeMy WebLinkAboutStaff Review (10 2. Developer provides easements for electric infrastructure as installed for electric lines GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes as per City specs and design (pull boxes provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: sweido@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314 Reviewed by: Sam Weido Date: February 20, 2007 SANITATION 1. Sanitation has no issues with this project. Reviewed by: Wally Urrutia Date: February 21, 2007 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will coPage 3 tofitute 3 completely new review. 0 STAFF REVIEW COMMENTS NO. 2 Project: GATEWAY CENTER PH. 2C (SP) -07-00500035 PLANNING 1. Again the pilaster will need to go the wnastates thate awnings wningof the stare g being proposed.to count not hThe legend reflects 2. The cover letter and the elevationp "Canvas Awnings/F-1". An F-1 is not being reflected on any of the elevations. This layer may have just been turned off possibly..?Please resubmit the elevations with the awnings. 3. Per my discussion with Doug Patterson on 2-23-07, the pilaster can go 3/4 of the up the building.. Date: February 22,2007 Reviewed by:Jennifer Reeves STAFF REVIEW COMMENTS NO. 1 Project: GATEWAY CENTER PH. 2C (SP) — 07-00500035 PLANNING 1. Provide a general note that all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 2. It does not appear that the proposed dumpsters in the rear of the building have a screening wall all the way around them. Please be aware that if these are visible from driving down the rear drive isle or the drive along the west driving into the multi-family development a Certificate of Occupancy will not be issued for any building in Phase 2-C, until they are screened all the way around. 3. The pilaster will need to go all the way to the top of the building to count (not half way). 4. There needs to be two different architectural elements. LAN DSCAPINGISTREETSCAPING!BUFFER 1. The landscape plan needs to match the site plan layout (phase lines and phase labels need to match). The plan is currently showing Phase 2-B where 2-C is. NON- RESIDENTIAL ARCHITECTUAL STANDARDS (NRA) 1. The brick pilasters that are being proposed need to go all the way to the top of the building (not a portion of the way). This would ly count as canopiesone or awnings asual element, please provide another one. Wet ked about possibility. Reviewed by: Jennifer Reeves Date: February 22, 2007 MISCELLANEOUS 1. Irrigation system must be pro by eit Pressure Vacuum Breaker, Reduced Pressure Principle Back Flow Device, or a Double-CheckBack Flow Device, and installed as per City Ordinance 2394. 2. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING 1. No comments. Reviewed by: Carol Cotter Date: February 22, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans.Any additional changes on these plans that have not been pointed out to the City,willpage 2 constituto 3 completely new review.