2. Developer provides easements for electric infrastructure as installed for electric lines
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as
required.
5. If conduit does not exist at designated transformer, developer to furnish and install
conduit as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes as per City specs and design (pull boxes provided by the
City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email
to: sweido@cstx.gov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314
Reviewed by: Sam Weido
Date: February 20, 2007
SANITATION
1. Sanitation has no issues with this project.
Reviewed by: Wally Urrutia
Date: February 21, 2007
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will coPage 3 tofitute
3
completely new review.
0
STAFF REVIEW COMMENTS NO. 2
Project: GATEWAY CENTER PH. 2C (SP) -07-00500035
PLANNING
1. Again the pilaster will need to go the wnastates thate awnings wningof the stare g being proposed.to count not hThe legend reflects
2. The cover letter and the elevationp
"Canvas Awnings/F-1". An F-1 is not being reflected on any of the elevations. This layer may have just
been turned off possibly..?Please resubmit the elevations with the awnings.
3. Per my discussion with Doug Patterson on 2-23-07, the pilaster can go 3/4 of the up the building..
Date: February 22,2007
Reviewed by:Jennifer Reeves
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY CENTER PH. 2C (SP) — 07-00500035
PLANNING
1. Provide a general note that all roof and ground-mounted mechanical equipment shall be
screened from view or isolated so as not to be visible from any public right-of-way or
residential district within 150' of the subject lot, measured from a point five feet above grade.
Such screening shall be coordinated with the building architecture and scale to maintain a
unified appearance.
2. It does not appear that the proposed dumpsters in the rear of the building have a screening
wall all the way around them. Please be aware that if these are visible from driving down the
rear drive isle or the drive along the west driving into the multi-family development a
Certificate of Occupancy will not be issued for any building in Phase 2-C, until they are
screened all the way around.
3. The pilaster will need to go all the way to the top of the building to count (not half way).
4. There needs to be two different architectural elements.
LAN DSCAPINGISTREETSCAPING!BUFFER
1. The landscape plan needs to match the site plan layout (phase lines and phase labels need
to match). The plan is currently showing Phase 2-B where 2-C is.
NON- RESIDENTIAL ARCHITECTUAL STANDARDS (NRA)
1. The brick pilasters that are being proposed need to go all the way to the top of
the building (not a portion of the way). This would ly count as canopiesone or awnings asual
element, please provide another one. Wet ked about
possibility.
Reviewed by: Jennifer Reeves
Date: February 22, 2007
MISCELLANEOUS
1. Irrigation system must be pro
by eit
Pressure Vacuum
Breaker,
Reduced
Pressure Principle Back Flow Device, or a Double-CheckBack Flow Device, and installed
as per City Ordinance 2394.
2. All Back Flow devices must be installed and tested upon installation as per City Ordinance
2394.
ENGINEERING
1. No comments.
Reviewed by: Carol Cotter
Date: February 22, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled" on your plans.Any additional changes on these plans that have not been pointed out to the City,willpage 2 constituto 3
completely new review.