Loading...
HomeMy WebLinkAboutLetter of Completion (f2 go -q`kTi LETTER OF COMPLETION CITY OF COLLEGE STATION DATE:JULY 19,2007 ENGINEERING DIVISION COLLEGE STATION,TEXAS RE: COMPLETION OF CREEK MEADOWS SUBDIVISION SECTION 1A(PH 1&2)SANITARY SEWER IMPROVEMENTS SPECIFICALLY OUTLINED AS FOLLOWS; SEWER LINE S-1 FROM MANHOLE S1.12 TO S1.26 SEWER LINE S5 SEWER LINE S6 SEWER LINE S7 SEWER LINE S8 SEWER LINE S9 To Whom It May Concern: The purpose of our letter is to request that the wing listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station,Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above reference project. The one-year warranty is hereby affirmed and agreed to by TEXCON and by their sub- contractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE Sanitary Sewer Lines As Listed Above �o\y is?2007 OWNER: CONTRACTOR: CREEK MEADOWS PARTNERS TEXCON (979)694-4040 (979)690-7711 230 SOUTHWEST PARKWAY EAST 1707 GRAHAM ROAD COLLEGE STATION,TEXAS 77840 COLLEGE STATION,TX 77845 \:S" I------------ 6fa--- SIGNATURE SIGNATURE ACCEPTANCE&APPROVAL '_..„ -<:,r,.....0 4;4,-,____ REPRESENT• IVE 1 CITY G ' JUL-24-2007. TUE 03: 16• PM FAX NO. P. 02 LETTER OF COMPLETION CITY OF COLLEGE STATION DATE: JULY 19,2007 ENGINEERING DIVISION COLLEGE STATION,TEXAS RE: COMPLETION OF CREEK.MEADOWS SUBDIVISION SECTION 1A(PH 1& 2) SANITARY SEWER IMPROVEMENTS SPECIFICALLY OUTLINED AS FOLLOWS; SEWER LINE S-1 FROM MANHOLE 81.12 TO 51.26 SEWER LINE S5 SEWER LINE S6 SEWER LINE 87 SEWER LINE S8 SEWER LINE S9 To Whom It May Concern: The purpose of our letter is to request that the following listed improvements be approved and accepted as being cons)rercted under City inspection and completed according to plans and specifications as approved and required by the City of College Station,Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above reference project. The one-year warranty is hereby affirmed and agreed to by TEXCON and by their sub- contractors as indicated by signatures below. NVW K COM Pi,ETED WARRANTY DATE Sanitary Sewer Lines As Listed Above Jury 3 24207 OWNER: CONTRACTOR: CREEK MEADOWS PARTNERS TEXCON (979) 694-4040 (979)690-7711 230 SOUTHWEST PARKWAY EAST 1707 GRAHAM ROAD COLLEGE STATION,TEXAS 77840 COLLEGE STATION,TX 77845 SIGNATURE SIGNATURE ACCEPTANCE&APPROVAL rteit) 2;3 REPftESENTAk IVE i) ,.\\\W\jsk CITY NTG'NEER