HomeMy WebLinkAboutLetter of Completion (f2 go -q`kTi
LETTER OF COMPLETION
CITY OF COLLEGE STATION DATE:JULY 19,2007
ENGINEERING DIVISION
COLLEGE STATION,TEXAS
RE: COMPLETION OF CREEK MEADOWS SUBDIVISION SECTION 1A(PH 1&2)SANITARY
SEWER IMPROVEMENTS SPECIFICALLY OUTLINED AS FOLLOWS;
SEWER LINE S-1 FROM MANHOLE S1.12 TO S1.26
SEWER LINE S5
SEWER LINE S6
SEWER LINE S7
SEWER LINE S8
SEWER LINE S9
To Whom It May Concern:
The purpose of our letter is to request that the wing listed improvements be approved
and accepted as being constructed under City inspection and completed according to plans and
specifications as approved and required by the City of College Station,Texas. This approval and
acceptance by the City is requested in order that we may finalize any subcontracts and to affirm
their warranty on the work. This approval and acceptance by the City of the improvements listed
below does hereby void the letter of guarantee for the listed improvements on the above reference
project.
The one-year warranty is hereby affirmed and agreed to by TEXCON and by their sub-
contractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
Sanitary Sewer Lines As Listed Above
�o\y is?2007
OWNER: CONTRACTOR:
CREEK MEADOWS PARTNERS TEXCON
(979)694-4040 (979)690-7711
230 SOUTHWEST PARKWAY EAST 1707 GRAHAM ROAD
COLLEGE STATION,TEXAS 77840 COLLEGE STATION,TX 77845
\:S"
I------------ 6fa---
SIGNATURE SIGNATURE
ACCEPTANCE&APPROVAL
'_..„ -<:,r,.....0 4;4,-,____
REPRESENT• IVE
1
CITY G '
JUL-24-2007. TUE 03: 16• PM FAX NO. P. 02
LETTER OF COMPLETION
CITY OF COLLEGE STATION DATE: JULY 19,2007
ENGINEERING DIVISION
COLLEGE STATION,TEXAS
RE: COMPLETION OF CREEK.MEADOWS SUBDIVISION SECTION 1A(PH 1& 2) SANITARY
SEWER IMPROVEMENTS SPECIFICALLY OUTLINED AS FOLLOWS;
SEWER LINE S-1 FROM MANHOLE 81.12 TO 51.26
SEWER LINE S5
SEWER LINE S6
SEWER LINE 87
SEWER LINE S8
SEWER LINE S9
To Whom It May Concern:
The purpose of our letter is to request that the following listed improvements be approved
and accepted as being cons)rercted under City inspection and completed according to plans and
specifications as approved and required by the City of College Station,Texas. This approval and
acceptance by the City is requested in order that we may finalize any subcontracts and to affirm
their warranty on the work. This approval and acceptance by the City of the improvements listed
below does hereby void the letter of guarantee for the listed improvements on the above reference
project.
The one-year warranty is hereby affirmed and agreed to by TEXCON and by their sub-
contractors as indicated by signatures below.
NVW K COM Pi,ETED WARRANTY DATE
Sanitary Sewer Lines As Listed Above Jury 3 24207
OWNER: CONTRACTOR:
CREEK MEADOWS PARTNERS TEXCON
(979) 694-4040 (979)690-7711
230 SOUTHWEST PARKWAY EAST 1707 GRAHAM ROAD
COLLEGE STATION,TEXAS 77840 COLLEGE STATION,TX 77845
SIGNATURE SIGNATURE
ACCEPTANCE&APPROVAL rteit)
2;3
REPftESENTAk IVE
i) ,.\\\W\jsk
CITY NTG'NEER