Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Cost Estimate
Feb 15 07 10:53a Rabon Metcalf Engineering 9796900329 p.2 ENGINEER'S COST ESTIMATE -2/15/2007 NINFA'S MEXICAN RESTAURANT DRAINAGE IMPROVEMENTS 1007 EARL RUDDER FREEWAY COLLEGE STATION,BRAZOS COUNTY, TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST WATER LINE IMPROVEMENTS 1 Mobilization&Construction Staking 1 LS $1,000.00 $1,000.00 2 Erosion, Sedimentation Control&Seeding I LS $1,000.00 $1,000.00 3 6'x 4' CIP Box Culvert(TxDOT SCC-5&6) 100 LF $150.00 $15,000.00 4 Grading, Erosion Control Fabric&Rock Rip-Rap 1 LS $1,500.00 $1,500.00 i SUB-TOTAL= $18,500.00 10% CONTINGENCY= $1,850.00 TOTAL ESTIMATED CONSTRUCTION COST = $20,350.00 This Engineer's Cost Estimate was prepared in our office, at the date shown, and is released for the purpose of public infrastructure cost projections, ;:x .;."-u.z�� i��E ;Tic • * ` /\ .* ril RABON A. METCALF // \ '' -'3... , :cz- , —741W4F,Iif '''l ' °ii; ,,-7.0 •<4, 00 Rabon A.'Metcalf, P.E 1 r'13\1!).„,' SIC; .k°C1 darii �� RABON METCALF ENGINEERING Ooi . ! POST OFFICE BOX 9253 �' COLLEGE STATION,TEXAS 77842 �1 ,L1 CELL: (979)219-4174 �J L...------ ..-/ 4 FAX: (979)690-0329 -Ai �,EERYNG E-mail: rabon@rmengineer.com CD I-208-0296-E01 1 of 1 + �rrrrrr Engineer's Cost Estimate-Revision No. 1 NINFA'S MEXICAN RESTAURANT UTILITY IMPROVEMENTS 1007 EARL RUDDER FREEWAY COLLEGE STATION,BRAZOS COUNTY,TEXAS UNIT TOTAL NO. DESCRIPTION QUANTITY UNIT COST COST WATER IMPROVEMENTS 1 Mobilization&Trench Safety(Water Line) 1 LS $1,500.00 $1,500.00 2 8" PVC Water Line(C909, CL 200) 219 LF $23.00 $5,037.00 18"x8"(MJ)Tapping Valve&Sleeve(Tie to Existing 3 1 LS $3,000.00 $3,000.00 18"DIP Water Line) 4 8"(MJ)Gate Valve&Box 1 EA $850.00 $850.00 5 6"(MJ)Gate Valve&Box 1 EA $650.00 $650.00 6 D.I. Fittings(Class 350) 1 LS $1,500.00 $1,500.00 7 Cement Stabilized Sand Bedding&Backfill 175 LF $15.00 $2,625.00 8 Standard Fire Hydrant Assembly 1 EA $2,300.00 $2,300.00 SUB-TOTAL= $17,462.00 10%CONTINGENCY= $1,746.20 ESTIMATED CONSTRUCTION COST = $19,208.20 This Engineer's Cost Estimate was prepared in our office, at the date shown, and is released for the purpose of public infrastructure cost projections-a., --m11111111111111111 ,0°7:4••••..•ME?CACF ••t' 41/7 Rabon A. Metcalf, P.E ;• •,Y'. J.RABON METCALF ENGINEERING V POST OFFICE BOX 9253 COLLEGE STATION,TEXAS 77842 �qt-- % CELL: (979)219-4174 ANO 7,N FF F.R t�G FAX: (979)690-0329 E-mail: rabonta rmengineer.com CD1-208-0296-E03 1 of 1