Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Letter of Completion
LETTER OF COMPLETION D P pZ - 31 ' RIGHT-OF-WAY/EASEMENT USER CITY ENGINEER DATE: /3'07 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF NtrW46 The purpose of this letter is to request that the following listed work activity occurring within a City of College Station right-of-way or easement be approved and accepted as being constructed under City inspection and completed according to plans, specifications, and City Ordinance requirements. The City acknowledges that the constructed infrastructure is the property of the user and that inspection is limited to those activities and the location of the user infrastructure within the right-of-way or easement. The user remains responsible for but not limited to the establishment of vegetation, settlement of excavation, restoration of landscaping, repair of irrigation systems, repair of City infrastructure such as sidewalks and streets, and any other areas of disturbance with a warranty responsibility period of one (1) year following completion. WORK COMPLETED DATE 42 C__z��.. Lf"Eox�iztiz I — / 3 . " 7 Owner: R©dtz› .t!,e7L3, 4 Contractor: '7Cm_c k 1.-- z c., Mailing Address: 0 0,7 /l iv Address:!1 O.1 j,4 )4.,2 Co`__-1.4940729-" e Q/1,,,,,. `fir..-..,--,,, Signature: SignaturZ-------, ACCEPTAICZEf& APP OV L Ci #.rese a ' Vs N 44AA1\- V--, Ci E gineer Revised 8/30/05 LETTER OF COMPLETION CITY ENGINEER DATE: �o 7 CITY OF COLLEGE STATION COLLEGE STATION, TEXAS RE: COMPLETION OF Ninli-A- bamc0-i`(', Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by and by their subcontractors as indicated by signatures below. WORK COMPLETED / /W�WARRANTY DATE / /-1 /44.j /0, al? rA-- fiZO Owner: go 4D ,Z--h ZL Contractor: ), qm ono j wvr e e S Mailing Address: /'' 2. ,ekyzC ._, Address: Yo, 4,3X 425 7-2._ 7 7.rizzs Signature: /��L Signature: ACCEPTANCE & APPROVAL t ._✓ City Representative Cit Engine0,441 Revised 10/12/00