Loading...
HomeMy WebLinkAboutCorrespondence Page 1 of 2 Carol Cotter-RE: New Development for the Week of 2/19/2007 > sem. . < r,h,,.ai aVOM,4.ar aZA1%.••i':0.a2."' .as,�i„ 9,s3: .a.aa *?s u..n..:�5,r..xaE;,fg From: "Randy Trimble" To: "Brittany Korthauer" Date: 2/22/2007 2:24 PM Subject: RE: New Development for the Week of 2/19/2007 Hidden Springs: • Need 16' PUE along the front of Lots 14 - 20 of Block 1. • A 20' PUE will need to extend around the outer perimeter of the subdivision. (i.e., Block 4, Lots 1-3 and Block 1 lots 1-3) • FYI: Electrical service to each lot will be from the front of the lots. BTU may utilize any part of the PUE's to place its facilities. Original Message From: Brittany Korthauer [mailto:Bkorthauer@cstx.gov] Sent: Monday, February 19, 2007 1:37 PM To: Randy Trimble Subject: RE: New Development for the Week of 2/19/2007 Yes. That is fine! Brittany Korthauer Staff Assistant-Planning & Development City of College Station P.O. Box 9960 College Station, TX 77842 979.764.6252 "Work like you don't need the money, love like you've never been hurt, and dance like you do when nobody's watching." >>> "Randy Trimble" <rtrimble@btutilities.com> 02/19/07 1:04 PM >>> Brittany, I was out of the office part of last week and today. I have some comments on plats from last week. I'll get them to you ASAP (hopefully tomorrow). Will that work? Thanks, Randy Original Message From: Brittany Korthauer [mailto:Bkorthauer@cstx.gov] Sent: Monday, February 19, 2007 10:46 AM To: Elton Abbott; kimberly.winn@atmosenergy.com; pcorley@bc911.org; file://C:\Documents and Settings\ccotter.CSTX\Local Settings\Temp\XPgrpwise\45DDA7E5City ... 2/22/2007 Page 2 of 2 Kim Hoesel;jbeard@bcsmpo.org; Randy Trimble; Shawndra Green; jimp@bvsbdc.org; Days Inn; clint@clarkewyndham.com; cmetest@cox-internet.com; mike.lavender@cox.com; Clark Ealy; David Norton; Bridgette George; Connie Hooks; Glenn Brown; Harvey Cargill; John Happ; Pete Vanecek; Ron Silvia; Jennifer Mascheck; Jay Page; Karl Nelson; George Lea; Shelly Taylor; gbrewer@fnb-bcs.com; Joe Salvato; mholmgreen@fnb-bcs.com; Nora Thompson; Steve Hilton; Sharon @ Days Inn; Jon; Ed Clarkson; Daniel Westerheim; belinda_fikes@mcgraw-hill.com; Joe Vargo; Newell@Newellsdesigns.com; James Drews; Mark Dudley; Charles White; Joe Bethany; Rod Weis; Paul; The Plan Room; Tracy.Holland@verizon.com; Tim Williams; Jim Survant; Ann@wicksoncreek.com Subject: New Development for the Week of 2/19/2007 The following attachment is the list of new development projects submitted to Planning and Development Services for the deadline of 2/19/2007. Thank you Brittany Korthauer Staff Assistant-Planning& Development City of College Station P.O. Box 9960 College Station, TX 77842 979.764.6252 "Work like you don't need the money, love like you've never been hurt, and dance like you do when nobody's watching." College Station. Heart of the Research Valley. College Station. Heart of the Research Valley. file://C:\Documents and Settings\ccotter.CSTX\Local Settings\Temp\XPgrpwise\45DDA7E5City ... 2/22/2007 Feb. 16. 2007 3:42PV No. 5883 P.• '''' ''''''''' BRAZOS COUNTY HEALTH DEF J1",, T 4 r�.I, .) 201 NORTH TEXAS AVENUE•BRYAN,TEXAS 7 `10- 0 0" (979)361-4440•Fax(979) 823-2275 ° ,, '.: E-mail: healthdept@co.brazos.tx.us lJJ 1 P„ www.brazoshealth.org February 16,2007 Mr.Jeff Robertson McClure and Browne Engineering 1008 Woodcreek Drive,Suite 103 College Station,Texas 77845 Re: Preliminary Plat and Final Plat,Phase 1 for Hidden Springs Subdivision,Samuel Davidson League,A-13,Brazos County,Texas. Dear Mr. Robertson: We appreciate the opportunity to review the preliminary plat and the final plat,phase 1 for Hidden Springs Subdivision. It appears from the plat that some lots are within the 100-year flood plain. TAC,Section 285.30(h)states the following about 100-year flood plain: ".,,Any sites within the 100 year floo lain,}tetermined from either FEMA maps or flood studies prepared by a professional engineer registered in a s,shall be subject to special planning requirements to indicate that the location of the OSSF will not r t in damage to the OSSF or result in contamination from the OSSF during flooding. Any planning materials submitted under this subsection shall indicate how possible tank flotation is eliminated." Future homeowners should be made aware of these special requirements for an on-site sewage facility. Other than the above mentioned provision,and the enlarging of Lot 12 to add more non-floodplain property,the plat meets the requirements set forth by the Texas Commission on Environmental Quality (TCEQ)and Brazos County concerning on-site sewage facilities. If we can be of further assistance,please call me at(979)361-4450. Sincerely,, Don Plitt,RS Director of Environmental Health Services Division Via Fax: Gary Arnold,Brazos County Road and Bridge Department