HomeMy WebLinkAboutCorrespondence INDIAN LA.. .S PHASE 3B— PRELIMINARY PLAT
RESPONSE TO STAFF REVIEW COMMENTS
``
PLANNING
1. The Phase 3b Preliminary Plat point of beginning lies at the back corner of Phase 3a, Block 18, Lot 12. The
Preliminary Plat for Phase 3a and Phase 1 Lots 5-R &6-R (submitted jointly)was tied to the back corner of
Phase 1, Block 1, Lot 4, which is a platted lot filed of record as a part of the Phase 1 Resubdivision Plat.
Refer to the field notes of the Phase 1 Resubdivision Plat. Field notes for each new phase will be provided
at the time of Final Plat submittal for each of the new phases.
2. See revised Note 16 on the revised Preliminary Plat. Construction drawings showing the exact location of
the temporary cul-de-sac will be submitted with the Final Plat.
3. See revised Preliminary Plat.
4. See revised Preliminary Plat.
5. See revised Preliminary Plat.
BRAZOS COUNTY
1. Block 19, Lots 3-4 will take access from Pawnee Crossing.
2. See revised Preliminary Plat.
3. See revised Preliminary Plat.
ENGINEERING
1. See revised Preliminary Plat.
ELECTRICAL
1. No comments.
SANITATION
2. No comments.
2/17/2007 Page 1 of 1