HomeMy WebLinkAboutStaff CommentsResponse to Staff Review Comments No. I
(dated 112412008)
Spring Creek Townhomes Phases 2 & 3 Preliminary Plat
PLANNING:
1. Note #2 has been corrected.
ENGINEERING:
1. The existing sanitary sewer easement crossing over Lots 23 & 24 and also
adjacent to these lots has been widened to 30' total width by adding 10' to one
side.
2. Noted.
3. A descriptive label has been added to the existing pipeline shown on the plat.
4. Noted.
SANITATION:
1. Yes, the residents will have somewhere to store their trash containers.
2. The townhomes will have garage attachments.
All Electrical and General Electrical comments have been noted.