HomeMy WebLinkAboutCost Estimate , it PEBBLE CREEK,PHASE 9-F MBESI PROJ#: 1065-0007 Engineer's Estimate of Construction Costs March 5,2007 Item# Description Unit Quantity Unit Price Total Paving Construction 1 Excavation(Roadway and Lots) C.Y. 4,233 7.50 31,748 2 6"Lime Stabilized Subgrade(6%by weight) S.Y. 8,976 3.25 29,172 3 6"Crushed Limestone Base S.Y. 6,926 8.25 57,140 4 2"HMAC Surface Course(including prime coat) S.Y. 6,926 9.40 65,104 5 Concrete Curb and Gutter(all types) L.F. 3,563 9.50 33,849 6 6"Reinforced Concrete Pavement S.Y. 332 36.00 11,952 7 4"Reinforced Concrete Sidewalk S.F. 8,906 3.00 26,718 8 Colored Sidewalk Ramps EACH 8 500.00 4,000 9 End/Road Markers EACH 6 250.00. 1,500 Paving Subtotal $261,182 Drainage System Construction 10 18"HDPE Pipe,(ADS,N-12 or approved equal w/water- tight joints)Str.Backfill L.F. 317 37.00 11,729 11 24"HDPE Pipe,(ADS,N-12 or approved equal wwater- / tight joints)Str.Backfill L.F. 590 49.00 28,910 12 24"HDPE Pipe,(ADS,N-12 or approved equal w/water- tight joints)Non-Str.Backfill L.F. 75 50.00 3,750 13 36"HDPE Pipe,(ADS,N-12 or approved equal w/water- tight joints)Non-Str.Backfill L.F. 369 60.00 22,140 14 42"HDPE Pipe,(ADS,N-12 or approved equal w/water- tight joints)Non-Str.Backfill L.F. 90 70.00 6,300 15 42"x45 deg.HDPE Bend EACH 1 250.00 250 16 4:1 Sloped End Treatment for 42"HDPE EACH 1 1,250.00 1,250 17 Standard 10'Recessed Inlet EACH 8 2,500.00 20,000 18 Standard Junction Box EACH 1 2,000.00 2,000 19 Rock Rip-Rap Channel Lining,on Filter Fabric S.Y. 26 50.00 1,290 Drainage System Subtotal $97,619 Water System Construction 20 6"PVC,C909 Cl 200,Water Line,Str.Backfill L.F. 217 20.00 4,340 21 6"PVC,C909 Cl 200,Water Line,Non-Str.Backfill L.F. 381 16.25 6,191 22 3"PVC,D2241 Cl 200 Water Line,Str.Backfill L.F. 190 17.00 3,230 23 3"PVC,ASTM D2241 CL 200 Water Line,Non-Str.Backfi1,J 543 10.00 5,430 24 Fire Hydrant Assembly EACH 2 2,650.00 5,300 25 Connect to Existing Waterline EACH 3 500.00 1,500 26 6"x13"M.J.Anchor Coupling EACH 1 130.00 130 27 6"x45 deg.Bend EACH 2 240.00 480 28 6"x3"Tapped Plug EACH 2 200.00 400 29 2"Blow Off Valve Assembly EACH 3 850.00 2,550 30 Water Service,1.5"type K Copper,short side(<20') EACH 5 650.00 3,250 31 Water Service, 1"type K Copper,short side(<20') EACH 3 450.00 1,350 32 Water Service,1.5"type K Copper,long side(>20') EACH 4 1,600.00 6,400 33 Water Service, 1.5"type K Copper,long side(>20') EACH 4 1,600.00 6,400 Water System Subtotal $46,951 1 of 2 PEBBLE CREEK,PHASE 9-F MBESI PROJ#: 1065-0007 Engineer's Estimate of Construction Costs March 5,2007 Item# Description Unit Quantity Unit Price Total Sewer System Construction 34 6"PVC,D-3034 SDR 26 L.F. 1,162 7.50 8,715 35 6"PVC,D-2241 SDR 26 L.F. 20 7.50 150 36 Non-Str.Backfill(0'-5'Depth) L.F. 42 10.00 420 37 Str.Backfill(5'-8'Depth) L.F. 283 26.00 7,358 38 Str.Backfill(8'-10'Depth) L.F. 344 35.00 12,040 39 Non-Str.Backfill(5'-8'Depth) L.F. 222 12.00 2,664 40 Non-Str.Backfill(8'-10'Depth) L.F. 291 14.00 4,074 41 Standard Manhole,0-6 ft.deep EACH 8 2,500.00 20,000 42 Extra Depth for Manhole V.F. 33.4 250.00 8,345 43 Drop Connection EACH 2.0 750.00 1,500 44 Short Side 4"Sewer Service(<20') EACH 5 450.00 2,250 45 Long Side 4"Sewer Service(>20') EACH 13 1,400.00 18,200 46 Trench Safety(sewer) L.F. 1,182 1.00 1,182 Sewer System Subtotal $86,898 Erosion Control Construction Erosion Control Plan&Sedimentation Control(per Item 106)(includes silt fencing,construction exits,straw bale 47 S.Y. 1 25,000.00 25,000 bathers,inlet protection,grass seeding,and any other sedimentation control devices) Erosion Control Subtotal $25,000 Total Construction Cost' $517,650 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction,additional features may become apparent as the work progresses,which will result in an increase in cost. L• //q. � *�P ' ...','.. X4 *lt, Jtery' .L. ,•beitson,P. . Date * • °� * �i ` JEFFERY L.ROBERTSON 4-o• 94745 i Q i ,rlO6• 4/CENSE •�:: 2 of 2