HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1
Project: SWEETLAND (PP) - 07-00500016
PLANNING
1. As previously stated, please tie plat to a College Station monument or a known platted
point.
Reviewed by: Jennifer Reeves Date: February 16, 2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. 2 of 2
STAFF REVIEW COMMENTS NO. 1
Project: SWEETLAND (PP) - 07-00500016
PLANNING
1. Park land dedication will be required for this lot. More than likely since the proposed
acreage is less than three acres it will be an Administrative decision by Parks to
allow a fee in lieu of land dedication. Please contact Pam Springfield at the Parks
Department at 979.764.3414 for submission requirements and review date. (this
must be reviewed and approve by Parks prior to filing the Final Plat)
2. As previously stated in the rezoning comments, the metes and bounds do not close.
Please resubmit a new metes and bounds description and correct the preliminary
plat map as well.
3. Please tie plat to a College Station monument.
4. (FYI) The preliminary Plat can go the same night as the rezoning request, however it
will have to be approved with the condition that the rezoning request gets approved
by Council prior to the final plat moving forward to the Planning and Zoning
Commission.
Reviewed by: Jennifer Reeves Date: February 5, 2007
ENGINEERING COMMENTS NO. 1
1. Please illustrate the proposed 10-ft electrical easement as a 10-ft PUE.
2. Please illustrate the entire proposed off-site water main extension, as well as its
relation to surrounding ROW and PUE.
3. Please revise note number 11. Fire coverage should be as follows, the distance
from the existing hydrant to the proposed driveway should be equal to or less
than 300-ft, and the home should be built within 150-ft arc length from the point
where the proposed driveway meets the existing street or end of previously
measured 300-ft.
4. FYI: No fill will be permitted in the floodway.
5. FYI: The surrounding property owners of Indian Trail have voiced concerns
regarding the proposed sanitary sewer service connection. They have asked to
be informed well in advance of anyone entering their property or doing any
construction on their property. Please take these concerns seriously and inform
the surrounding property owners prior to any construction on or near their
property.
Reviewed by: Josh Norton Date: February 1, 2007