Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: BELMONT PLACE SECT. 3 (PP) - 07-00500007 PLANNING 1. Verify that the preparation date has been changed to January 16, 2007. 2. The rezoning for this plat area is to be considered by City Council on 1/25/07. If approved, remove "proposed" from the note stating the zoning designation. Reviewed by: Jason Schubert Date: January 22, 2007 ENGINEERING COMMENTS NO. 1 1. Please remove all proposed drive access points that have been illustrated. Please illustrate any desired drive or joint access points as easements. If you do not wish to plat these access points as easements then the access points can be worked out at site plan. 2. Longmire Drive is shown as a major collector (80-ft ROW) in the thoroughfare plan. Please dedicate additional ROW accordingly. 3. Graham Road is shown as a major collector (80-ft ROW) in the thoroughfare plan. Please dedicate additional ROW accordingly. 4. CoCS utilities has requested a 10-ft public utility easement be illustrated on the plat for all side, front, and rear property lines, with the exception of property lines which run along ROW. 20-ft public utility easements should be illustrated on property lines along platted property where an easement was not previously dedicated. 5. Please dedicate easements for all existing utilities shown to be outside of public utility easements. 6. Our records indicate the sanitary sewer line located on Lot 1 of Block 4 is a public main, please provide easement. 7. FYI — Our records indicate that a gas main crosses these properties, please illustrate accordingly. 8. FYI — Upon site plan these properties will be required to provide detention. These detention ponds will need to be in designated HOA/POA maintained areas. 9. FYI — Construction documents for required infrastructure (sidewalks, sanitary sewer, etc.) required with this plat will need to be turned in with the final plat. 10. FYI — Further subdivision or site plan development of these lots could trigger the need for extending water mains, especially for fire protection. Looping alternatives are required per the design guidelines. It may be advantageous while this is development is under sole ownership to loop the 2 parallel systems or accommodate for this future extension, as to plan for future development. Reviewed by: Josh Norton Date: January 22, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Need to confirm that 30' U.E. along Graham Road covers all utilities (e.g. is a public utility easement). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: tcrabb@csutx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Timothy Crabb 979.764.3439. Reviewed by: Timothy R. Crabb, P.E. Date: January 18, 2007 SANITATION 1. Sanitation has no issues with this project. Reviewed by: Wally Urrutia Date: January 17, 2007