HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 3 Project: CREEK MEADOWS SEC 1A, PH1-2 & SEC 1B, PH - 07-00500003 PWINING Pr Section 1B is not tied to a College Station monument. Reviewed by: Lindsay Boyer, Staff Planner Date: March 23, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 STAFF REVIEW COMMENTS NO. 3 Project: CREEK MEADOWS SEC 1A, PH1-2 & SEC 1B, PH - 07-00500003 PLANNING 1. Section 1B is not tied to a College Station monument. Reviewed by: Lindsay Boyer, Staff Planner Date: March 23, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 ENGINEERING COMMENTS NO. 5 WA 1'LR 1. The widths of the utility and access easements in the dedication for the lift station do not match the widths shown in the plans. You were to submit revised metes and bounds, but I never received them. Lift Station and "On-site" force main infrastructure will not be accepted until easement is dedicated. j::)./1\--M- i 11It. c 2. Plans and water report mention proposed 6" line along Royder Road. Be aware that the maximum distance for a 6" line is 1,500 feet. This line needs to be an 8" line. When will this proposed waterline along Royder Road be constructed? Is it needed for fire flow? It appears that the stand alone report for Phase 1A includes it in the modeling. '2v ap 'Required NPPA testing once construction is complete will be for 1000 gpm from single hydrant. Your report seems to indicate that it is designed for 1500 split between two hydrants. E J Blowoff required at end of W-18. �o wi rl F(.-tom lrr \--('1✓`2. L l►5 E: SEWER V Service taps from middle of roadway?Split in middle of cul-de-sac (S-10)?Bends (S-14)? Be aware that additional PUE width required on sewers deeper than 6'. Be aware that sewer line under retention/detention pond is tested to a higher pressure to include pressure exerted by groundwater. Y t> \SC.LISSFJP, DRAINAGE 1. County will give final approval of Drainage Report. 2. Final Plat will need to reflect BFEs determined by flood study. 3. FYI-Verify a USACE permit is not needed for stream modifications. 4. FYI-We believe a flood study and possible LOMR should be conducted due to the large flows that have been determined. 5. FYI-Sealed Drainage Report with dialogue and summary should be provided. 6. FYI-What is order/phasing of drainage construction? 7. FYI-Velocity out of Pond 2 is 8.9 fps. 8. FYI-Where does 100 year flow go for Run#s 20-22? Reviewed by: Carol Cotter Date: February 21,2007 I ENGINEERING COMMENTS NO. 4 WATER Y) ( ' . Provide documentation that Wellborn SUD is amenable to water lines on the ROW. gZ-Provide Cost Estimate for Public Infrastructure required for Section 1A,Phase 2. 4'4H`f 1"2 ? VItLt. o�J W Pil fXL XClearly indicate which parts of the water main are required to provide water to Section 1A, Phase 2. Provide documentation that Section 1A,Phase 2 will have fire flow on its own. 5,--13e aware that the subdivision will have to show fire flow capabilities once constructed in 6K order to file the Final Plat. Test will have to be performed in accordance with NFPA 291 and witnessed by the Design or SUD Engineer. _�,.., _-a--.f You do not show a PUE on Common Area J (Alley). There is a PUE surrounding the alley, but one is need to get the services across the Alley.A�t._ OF- (.3 w\I.c 13 .. Els v r C .i 12.-F.X: t3- amu A 16' PUE is shown on the Plat surrounding Commotn Area•£J Alley),.but the construction plans show 20'PUE. ( (A. GitIh41--6c -\ c 14. n-0-4- C.) kSt1,---) There is not 4'cover on W7 where it crosses Greens Prairie Trail. F•12.20e. t Na 12R-1-r 1 tJ C- -Ast •" •ere is not 4'cover on W10 where it crosses Pawnee Creek Court. or•'•. The dimension of 48" minimum cover on W11 measures to existing grade not final grade of eet crossing. . Station all services.lt .*fre. There is only 3'cover on W14 at Wood Brook Lane. • Provide final grade on W16 from Sta 0+21 to Sta 1+50. �heet W-16 is missing. 5 c.(2-`42-'1 --- t N hal>i,�TA-'t E 65. Add lines to overall plan. It is too confusing and time intensive to review as presented. a£LtEVE TL-3C Nrtew Fi .FGE,P-(Pt-t1or..l WILL -t4E-uf? SANITY SEWER ' Station all services. ,,7!All connections and service leads shall be installed with construction of the main. Add services to sewer main being constructed that will eventually serve future phases. zl.8:Add lines to overall plan. It is too confusing and time intensive to review as presented. J. Clearly indicate which parts of the sewer main are required to provide sewer to Section 1A, Phase 2. Q0.-"provide Cost Estimate for Public Infrastructure required for Section 1A, Phase 2. *. ,1.1!Vater and sewer crossings note to center joint of pipe. Are you relying on the Contractor to follow the notes on GN-02, or should you be a little more specific as to pressure pipe and cement stabilized backfill? c*C .There is not the required 6' of cover fro PVC on S2 through Common Area X. More discussion is needed to evaluate impact from culvert,etc. There is not the required 6' cover fro PVC on$under culdesac of Pawnee Creek Court. g4-Provide final grade on S8 from Sta 6+70 to Sta 7+70. OZIYour Trench Bedding Detail does not match BCS Unified. Use standard detail or submit for approval why your design is better. 5C S 61 k 1W tn1 t Lt- 8E- V 71L.i ZEX::.. --* Covt_ rvivabutter, morn wA-r1..1 Nit NO1 SL.EEVtNCS-. 4c- *- too, PILL 51-1-twt.t t-}A'J zo' 0.C. of -e12.uG-ry rt.. BErnnit4u_ `TNo.st� rcl Lt..F_-P, ncc,E. E, ..-cwEE+J co" 24 " wtt.L t4 WE. A �►►rr OF- Sale-2cp t CL.l(DO , ALL -ci- lS iS 6}40wtS t+4 P2t'Ft>.E„ Po MCI fWeL`f -to FUT. C..V-c Sc►JU-S. STREETS AND DRAINAGE 26. Provide drainage report. Streets and Drainage cannot be effectively reviewed without the drainage report. (I will not review without it). 27. The Final Plat will not go to P&Z without review of the Drainage Report. Reviewed by: Carol Cotter Date: February 16, 2007 i V�t tii l rvi.o 2 of -Rec,./10 w C7 3),P 5-ra o c-r v erA ENGINEERING COMMENTS NO. 4 WATER 1. Provide documentation that Wellborn SUD is amenable to water lines on the ROW. 2. Provide Cost Estimate for Public Infrastructure required for Section 1A,Phase 2. 3. Clearly indicate which parts of the water main are required to provide water to Section 1A, Phase 2. 4. Provide documentation that Section 1A,Phase 2 will have fire flow on its own. 5. Be aware that the subdivision will have to show fire flow capabilities once constructed in order to file the Final Plat. Test will have to be performed in accordance with NFPA 291 and witnessed by the Design or SUD Engineer. 6. You do not show a PUE on Common Area J (Alley). There is a PUE surrounding the alley, but one is need to get the services across the Alley. 7. A 16' PUE is shown on the Plat surrounding Common Area J (Alley), but the construction plans show 20'PUE. 8. There is not 4'cover on W7 where it crosses Greens Prairie Trail. 9. There is not 4'cover on W10 where it crosses Pawnee Creek Court. 10. The dimension of 48" minimum cover on W11 measures to existing grade not final grade of street crossing. 11. Station all services. 12. There is only 3' cover on W14 at Wood Brook Lane. 13. Provide final grade on W16 from Sta 0+21 to Sta 1+50. 14. Sheet W-16 is missing. 15. Add lines to overall plan.It is too confusing and time intensive to review as presented. SANITARY SE WE R 16. Station all services. 17. All connections and service leads shall be installed with construction of the main. Add services to sewer main being constructed that will eventually serve future phases. 18. Add lines to overall plan.It is too confusing and time intensive to review as presented. 19. Clearly indicate which parts of the sewer main are required to provide sewer to Section 1A, Phase 2. 20. Provide Cost Estimate for Public Infrastructure required for Section 1A,Phase 2. 21. Water and sewer crossings note to center joint of pipe. Are you relying on the Contractor to follow the notes on GN-02, or should you be a little more specific as to pressure pipe and cement stabilized backfill? 22. There is not the required 6' of cover for PVC on S2 through Common Area X. More discussion is needed to evaluate impact from culvert,etc. 23. There is not the required 6'cover fro PVC on S2 under culdesac of Pawnee Creek Court. 24. Provide final grade on S8 from Sta 6+70 to Sta 7+70. 25. Your Trench Bedding Detail does not match BCS Unified. Use standard detail or submit for approval why your design is better. STREETS AND DRAINAGE 26. Provide drainage report. Streets and Drainage cannot be effectively reviewed without the drainage report. (I will not review without it). 27. The Final Plat will not go to P&Z without review of the Drainage Report. Reviewed by Carol Cotter Date: February 16, 2007 STAFF REVIEW COMMENTS NO. 3 Project: CREEK MEADOWS (FP) - 07-00500003 PLANNING 1. Plat should also be tied to a College Station monument Reviewed by: Lindsay Boyer Date: January 29, 2007 ENGINEERING COMMENTS NO. 3 Where there is a change in pipe diameter,the soffit of the smaller upstream pipe shall at least match the soffit of the larger pipe. Structural backfill is required on all utilities including storm to within 5 feet of pavement, including sidewalks. LVProvide drainage report and storm pipe sizing. {JJ t 4 t. wow t- T'Acst 6zyweecicrt qJ Show all water and sewer conflicts. C Q 1'l r7XC Plan set not complete. Sheets and Details are referenced that were not provided. ? 6. Provide design information for transition from 80' to 60'ROW. g3: `What is happening to storm water discharge from Section 1A? Provide design information of Creek Meadow Blvd connection with Greens Prairie Trail. Is a culvert not needed? Provide measures to insure that the roadways are not undermined by drainage at the end roadways that stop with this phase and will be continued with later phases. Reviewed by: Carol Cotter Date:January 29, 2007 1/'LL/LUU/ 11:6U AM UWPAA -. U/UOMUJLU rage L ox L ENGINEERING COMMENTS NO. 2 ,elProvide documentation that gas line has been abandoned and no longer in use. z.' Provide overall layout of water and sewer lines, showing valve and hydrant locations. Provide"Letter Acknowledging City Standards". MLA. P .. t . u'j Fps Include Sheets of BCS Details. "Limits of proposed PUEs need to be more clearly defined. p Show proposed final grades. O `Additional valves are required on a number of tees (fire hydrant tee included) - two valves on every tee connection. KRelocate water and sewer mains and manholes outside ROW, except were crossing ROW. Gov N-r't VaRAFvf4CE. -P - CoN at.Vnt64 I 1.'11'1015 :- Provide deflection information. the sewer main crossing Common Areas V and W in a PUE? 21!Station all services. 3'OVhat is the communication wire on the water line? !)3Eui. ,2-4 l�l�s'1P t �� �� Rrrp3 p-Are the alleys that have water and sewer lines on either side also designated as PUEs? ili4 Water line W4 crossing through Common Area A needs PUE. J..5.-Waterline W6 is called out as W4. 1$\/erify Station Equation for Water line W6 = W2? j.Design information missing from profiles Sheets W-08 through W-17. 18.Provide water tight manhole lids in areas of ponding. / Sanitary Sewer S3 ASTM 2241 for TCEQ pressure pipe requirement? \(IrS I IDtW plbints of sanitary sewer that are to be centered under water lines are to be bit pressure pipe per TCEQ requirements and are to be backfilled with cement stabilized sand. You have a note to this regard, but it is not clear in the plans. p Mains (water and sewer) crossing streets are not required to be encased unless crossing major collector or greater. _4E,Qu1 .r) 13-1 Coves-cam Uflu ccE 22.Additional comments may be issued once aforementioned comments are addressed. Information requested will aid in review of the project. Reviewed by: Carol Cotter Date: January 17, 2007 STAFF REVIEW COMMENTS NO. 1 Project CREEK MEADOWS (FP) -07-00500003 PLANNING l• Plat does not close. Co ye_, -c—t e_.b Z,21'..Area between Section 1B,Phase 1,Block 3,Lot 1 and Block 2,Lot 22,is this part of common area AA?If so,shouldn't it be contiguous,I'm confused by the line type as to what this actually is. Remove the City Secretary from the Planning and Zoning Commission approval certificate. 1,4(-.HOA note 3,remove curb at the end of the notes. The entrance off Greens Prairie Road West had a median shown on the preliminary plat. If you are planning to keep that median,please show it as a common area. -..Car a1, shcola-E-hsl- e � c- Reviewed by: Lindsay BoyerDate January 8,2007 Ste'•l 1 1 . BRAZOS COUNTY 1. Pending. Reviewed by: Date: BTU Please have the second sentence of from the Construction Standards and Notes number 4 removed. It is not needed and could potentially be too restrictive. There seems to be a PUE on every lot line. Does it have some special usage? How far does it go into the property? ME —t t hi Car F's—V—. —ToYv1 .e.—r I\Vott3. There is no reference to any type of pump station,lift station,etc.Are there any three-phase requirements within the subdivision? If so,what and where? Reviewed by: Randy Trimble Date: January 4,2007 ENGINEERING COMMENTS NO.1 'Please consolidate Plat to 3 pages. Line and curve tables can be reduced. GAN NO-7 g41 Submit construction plans for streets and drainage. 6F-C- l Pc 1-1-?.--c_,-114....v--- Submit water(Fire flow)report. Ste- t A '4" 1 P Submit Drainage Report trSl Lt_ Frz=k-l.uw 11-11 SEG lR PV l'4( 3 5. Construction plans for water and sewer are still under review and may affect the plat Reviewed by: Carol Cotter Date:January 8,2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION. GENERAL ELECTRICAL COMMENTS 1. Outside our electric service territory,will be served electric by BTU. 2. To discuss any of the above electrical comments,please contact Tony Michalsky at 979.764.3438. Reviewed by:Tony Michalsky Date: 1-4-07 L ....___ ENGINEERING COMMENTS NO. 2 1. Provide documentation that gas line has been abandoned and no longer in use. 2. Provide overall layout of water and sewer lines, showing valve and hydrant locations. 3. Provide "Letter Acknowledging City Standards". 4. Include Sheets of BCS Details. 5. Limits of proposed PUEs need to be more clearly defined. 6. Show proposed final grades. 7. Additional valves are required on a number of tees (fire hydrant tee included) — two valves on every tee connection. 8. Relocate water and sewer mains and manholes outside ROW, except were crossing ROW. 9. Provide deflection information. 10.1s the sewer main crossing Common Areas V and Win a PUE? 11.Station all services. 12.What is the communication wire on the water line? 13.Are the alleys that have water and sewer lines on either side also designated as PUEs? 14.Water line W4 crossing through Common Area A needs PUE. 15.Waterline W6 is called out as W4. 16.Verify Station Equation for Water line W6 = W2? 17.Design information missing from profiles Sheets W-08 through W-17. 18.Provide water tight manhole lids in areas of ponding. 19.Is Sanitary Sewer S3 ASTM 2241 for TCEQ pressure pipe requirement? 20.Joints of sanitary sewer that are to be centered under water lines are to be pressure pipe per TCEQ requirements and are to be backfilled with cement stabilized sand. You have a note to this regard, but it is not clear in the plans. 21.Mains (water and sewer) crossing streets are not required to be encased unless crossing major collector or greater. 22.Additional comments may be issued once aforementioned comments are addressed. Information requested will aid in review of the project. Reviewed by: Carol Cotter Date: JanJary 17, 2007 Sanitation Comments 1. Sanitation is ok with this project Reviewed by: Wally Urrutia Date: January 3,2007