HomeMy WebLinkAboutCorrespondence P T 4�. 4 `�
CITY OF COLLEGE STATION '"- �
July 16,2007
L.A.Berry,P.E.,Berry Engineering Company
1811 Rose St
Bryan,Texas 77802
RE:Property located at 110 Dominik Drive
Dear Mr.Berry:
This letter is to inform you that the above referenced property has received an administrative adjustment
of two (2) parking spaces from the number of spaces required by the Unified Development Ordinance,
Article 7,Section 2,Off-Street Parking Standards.
According to the Unified Development Ordinance Section 3.15, the Administrator has the authority to
authorize adjustment of up to 10 percent from any numerical zoning standard set forth in Articles 5, 6, or
7 of the Unified Development Ordinance. To approve the application for an administrative adjustment,
the Administrator shall make an affirmative finding that specific criteria, as outlined in Section 3.15.E of
the Unified Development Ordinance,have been met.
The Administrator has found that:
Granting the adjustment will ensure the same general level of land use compatibility as the otherwise
applicable standards because the amount of the adjustment is negligible and will not significantly alter
the intensity of the land use;
Granting the adjustment will not materially or adversely affect adjacent land uses or the physical
character of uses in the immediate vicinity because the land use is an existing development and
confined to one lot;and
Granting the adjustment will be generally consistent with the purposes and intent of this UDO owing
to the fact that the reduction of two parking spaces is negligible.
If you have any questions,please feel free to call me at 979.764.3570.
Sincerel
i7/
Bob Cowell,AICP
Director of Planning&Development Services
CC: Habibeh Faizullah and Afzal Faizullah,owners,2801 Texas Ave S College Station,TX 77845
Jacob Hill,via hard-copy pick-up
File #07-00500163
the heart of the Research Valley
P.O.BOX 9960
1101 TEXAS AVENUE
COLLEGE STATION•TEXAS•77842
979.764.3510
E-mail Correspondence
From: Jason Schubert
To: berryeng@hotmail.com
CC: habibehf@gmail.com
Date: 7/12/2007 2:00 PM
Subject: Fwd: The Pump review comments
Attachments: Staff Review Comments 2.DOC
One additional comment I forgot to add. Ben McCarty, Plans Examiner, has said that for the new landing
area to be compliant with ADA standards, it is to be a total of 54" out from the building and run 5' (60")
along the building. This would revise your 1' x 4' addition to the sidewalk to 1.5' x 5'. Staff does not feel
this would substantially affect the drive aisle. Also, the ramp would outside the landing area and may
only be the 3' width if desired. If you have any questions, please contact Ben.
Thanks,
Jason
Jason Schubert
Staff Planner
Planning & Development Services
City of College Station
Phone: 979.764.3570
Fax: 979.764.3496
From: "Jason Schubert" <Jschubert@cstx.gov>
To: <berryeng@hotmail.com>
Sent: Thursday, June 07, 2007 3:10 PM
Subject: electric contact
Larry,
I just spoke with Sam Weido with College Station Utilities and d I guess you
have already been in contact with him. Let me know if you have any more
questions.
Jason
Jason Schubert
Staff Planner
Planning & Development Services
City of College Station
Phone: 979.764.3570
Fax: 979.764.3496
from: "L. A. Berry" <berryeng@hotmail.com>
To: "Jason Schubert" <Jschubert@cstx.gov>
CC: "L. A. Berry" <berryeng@hotmail.com>
Date: 7/17/2007 5:48 PM
Subject: Re: electric contact
Jason, yes, I meet with Jacob Hill (he's the guy who is opening the site for
a restaurant) and he had Sam's phone number. I called Sam and he verified
that the utility poles were to be taken down and he needed easements on the
south and west side of the property-which is fine with Jacob.
Thanks for all your help and patience visiting with me on short notice when
I go to your office.
Take care,
Larry
>>> Jason Schubert 7/26/2007 8:25 am >>>
Wally and Rod,
I've been asking both of your questions, not sure if that's ok with you guys. Anyway, I have two
different sites I would like your feedback on. First, 1400 Athens is the Gamma Phi Beta sorority remodel.
They are asking for a CO but I think we may have concerns with the tree overhanging the dumpster
enclosure. I've attached 2 pictures, let me know if you feel we should require them to cut back the tree.
Second, the site plan for 110 Dominik has been approved. It's the old Quick as a Flash being remodeled
into a restaurant called The Pump. They're adding a dumpster enclosure in the back. Right now, there's
overhead power lines (I think Verizon too) that are to be taken down as CSU will be running electric
underground. From your perspective, is it possible that this project would be able to get a Temp CO with
the dumpster being located outside the enclosure (and not underneath the lines) until that's completed?
I appreciate your help and let me know what you think on these.
Jason
From: Rodney Harris
To: Jason Schubert
CC: Wally Urrutia
Date: 7/26/2007 1:07 PM
Subject: Re: site plan questions
I met with Jacob Hill at 110 Dominik before lunch. We would have to place the container to the right of
the proposed enclosure site until the wires are buried. We shouldn't have any problems with issuing a
Temp CO.
Rodney Harris
Sanitation Foreman
Public Works
Tel(979)764-3698
Fax(979)764-3489
email:rharris@cstx.gov