Loading...
HomeMy WebLinkAboutLetter of Completion Mar 03 2008 6:50PM HP LASERJET FAX p. 1 LETTER OF COMPLETION di � CITY ENGINEER DATE: �� CITY OF COLLEGE STATION / COLLEGE STATION,TEXAS RE: C MWETION OF S.0".1 474'1/4/1'- �y a�e% tJiSic.r TLSO 7-- Dear Sir: The purpose of our letter is to request that the following listed Improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station,Texas. This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. Co,The one-year warranty Is hereby affirmed end agreed to byfCS Develo(m-en± and by their subcontractors as indicated by signatures below. WORK fOMPLETED W RA TY DATE 4kft.4- 3/ 3/Q s� w eti 7/3/0 ? 4,4-14e/c_ 7/� o owner.BCS beve[o?men+ Co Contractor:4Z61 A4 ir//(//CP, Phone Number. L949 t2-Z-2 Phone Number: ripn Address: `C • S 44-LP SO I,ll►1Addre s: erWAIN� Cd//�ft f;4 74i on, 11— 7 7 �l Signature: avian Signature:?/ 4 ACCEPT• • CE ,,•PPRO, •L l/`/ ity Representative ngineer/ff14.'6 Reused 1/31/07