Loading...
HomeMy WebLinkAboutStaff Comments (*,4411114 CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM December 17,2008 TO: Joe Schultz, Civil Development Ltd,via fax 764-7759 44 FROM: Matthew Hilgemeier,Staff Planner SUBJECT: TEXAS ENT (Landscape Plan) Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2)revised site and landscaping plans. If there are comments that you are not addressing with the revised site plan,please attach a letter explaining the details. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Adam GroupManagement Services via fax 776-6288 - g .47 ill Melody Stinson,Miller Architects,Inc,via email melody.stinson@hcdg.netv Case file#07-00500162 STAFF REVIEW COMMENTS Project:TEXAS ENT(Landscape Plan) -07-00500162 PLANNING/LANDSCAPING 1) The proposed landscaping calculations need to be adjusted as follows: a) I only count 15 New Canopy trees not 22. (15 trees X 150pts = 2,250) b) I count 18 New Non-Canopy Trees. (18 trees X 40 pts = 720) c) I count 195 shrubs (195 X 10 pts = 1,950) d) The required landscape points should total 4,920,not 4,940. 2) Plant List calculations are incorrectly labeled. The total points adds-up correctly, but the individual totals are off. 3) Knock-out Roses (Rosa x) are not on the approved planting list and cannot receive any points. Their points seem to not have been added into the final total point, but they are still listed as earning points. Please correct. 4) I only count six (6) trees along Birmingham Drive (this includes the two for one Non-Canopy Tree allowance). It looks as though one more Crape Myrtle on the west side of the sign would complete the required seven (7) streetscape trees. Reviewed by: Matthew Hilgemeier,Staff Planner Date: 12/16/08 Page 1 of 1 Subject: Staff Comments for Texas ENT(Landscape Plan) 12-17-08 Created By: Bboerboom@cstx.gov Scheduled Date: Creation Date: 12/17/2008 3:35 PM From: Beth Boerboom Recipient Action Date&Time Comment To: melody.stinson@hcdg.net(melody.stinson) Transferred 12/17/2008 3:35 PM file://C:\Documents and Settings\bboerboom\Local Settings\Tema\XPrrnwise\49491 C2F... 12/17/2008 (12/17/2008) Beth Boerboom - Staff Comments for Texas ENT (Landscape Plan) 12-17-08 Page 1 From: Beth Boerboom To: melody.stinson@hcdg.net Date: 12/17/2008 3:35 PM Subject: Staff Comments for Texas ENT (Landscape Plan) 12-17-08 Attachments: P0024967.pdf Melody Stinson, Please find attached the staff comments for the Texas ENT(Landscape Plan) project date 12-17-08. Sincerely, Beth Boerboom Beth Boerboom, Staff Assistant Planning&Development Services City of College Station 979.764.3570 www.cstx.gov(http://www.cstx.gov/) itgl 47ff CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM September fit, 2007 TO: Joe Schultz, P.E., Civil Development, Ltd, via fax 764.7759 ✓ FROM: Bridgette George, Development Coordinator SUBJECT: Staff Review Comments for Texas ENT Site Plan Staff reviewed the above-mentioned construction documents as requested. The following is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: $200 processing fee for the next round of three (3) staff reviews Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site plans One (1) landscaping plan One (1) 11x17 grading and erosion control plan Easement Dedication Sheet and required documents Copy of filed access easement. If you have any questions or need additional information, please contact Crissy Hart! or Carol Cotter at 979.764.3570. Attachments: Staff review comments pc: Adam Group Management Service, Inc., via fax 776.6288 I✓ Melody Stinson, Miller Architects, Inc, via melody.stinson ,hcdq.net Case File No. 07-500162 TEXAS ENT — SITE PLAN PLANNING / LANDSCAPING COMMENTS 1. Thank you for adjusting the parking spaces and the respective sidewalks/grassed islands to meet our standards; however, staff is still not comfortable General Note #8. Please remove the note. 2. A copy of the filed access easement will need to be provided prior to Site Plan approval. ENGINEERING COMMENTS NO. 2 1. Proposed off-site Public Utility Easement will have to be dedicated prior to Site Plan approval. 2. Isolation valve on fire suppression line needs to be located in the PUE. 3. As water line W-1 is designed, the hydrant will be shut off during connection to future development on Lot 2. Previous comments had suggested a design. Is what is provided a better design? 4. Blanket easement is not necessary with the dedication of actual easements. However, the PUEs dedicated need to be full PUEs. It appears that those being dedicated are utility specific. 5. Copy of filed access easement is required for Site Plan approval. Reviewed by: Carol Cotter Date: September 7, 2007 (frff" CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 0\9j College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM 116 1\j11/4'LV September 11, 2007 TO: Joe Schultz, P.E., Civil Development, Ltd, via fax 764.7759 v FROM: Bridgette George, Development Coordinator SUBJECT: Engineering Document Comments for Texas ENT Site Plan Staff reviewed the above-mentioned engineering documents as requested. The following is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: One (1) sets of revised construction documents. If you have any questions or need additional information, please call Carol Cotter, EIT, at 979.764.3570. Attachments: Staff review comments pc: Adam Group Management Service, Inc., via fax 776.6288 '/ i Melody Stinson, Miller Architects, Inc, via melody.stinson( hcdq.net Case File No. 07-500162 ENGINEERING COMMENTS NO. 2 1. Proposed off-site Public Utility Easement will have to be dedicated prior to Site Plan approval. 2. Isolation valve on fire suppression line needs to be located in the PUE. 3. As water line W-1 is designed, the hydrant will be shut off during connection to future development on Lot 2. Previous comments had suggested a design. Is what is provided a better design? 4. Blanket easement is not necessary with the dedication of actual easements. However, the PUEs dedicated need to be full PUEs. It appears that those being dedicated are utility specific. 5. Copy of filed access easement is required for Site Plan approval. Reviewed by: Carol Cotter Date: September 7, 2007 Response to STAFF REVIEW COMMENTS NO. 2 Project: TEXAS ENT (SP) - 07-00500162 PLANNING 1. Please provide the ownership and zoning of all abutting parcels. Ownership and zoning of all abutting parcels has been provided on the Site Plan. 2. Label or dimension all setback lines so they are distinguished from the other lines on the site plan. The building set back lines are labeled. 3. Remove Site Specific Note 7, that the final plat is not filed. The site plan will be not be approved until the plat is filed, making the note invalid. Site Specific Note 7 has been removed. 4. Provide a 26' access easement from the driveway on Longmire to the property to the south and adjust the pavement width to reflect that same width. A 26'access easement has been added from the driveway on Longmire to the property to the south and the pavement has been adjusted to reflect the same width. 5. Realign the drive aisles along Longmire such that it is parallel to Longmire and provides better circulation with the driveway on the east side of the building as well as to the property to the south. The drive aisle along Longmire has been realigned. 6. Remove the proposed monument sign as signs are permitted separately. Also be aware that the proposed location indicates that the sign will be in the 10' PUE and as proposed will not be permitted. The proposed monument sign has been removed. 7. Provide a note stating that Lots 1, 2, & 3 of Block 4 are a building plot. (note from plat) The note has been added as Site Specific Note 9. 8. Specify the height of the building in Site Specific Note #2. The height of the building has been specified in Site Specific Note #2. 9. General Note 8 is not correct. If a parking space is not 20' in depth, it may be down to a minimum of 18' in depth provided that it is adjacent to a landscape island of at least 4' in depth or a 6' wide sidewalk. Please remove/revise the note and adjust the plan accordingly. General Note 8 has been revised. 10. Temporary curbing will be required between the subject lot and the property to the south. Please indicate the temporary curbing on the site plan. Temporary curbing between the subject lot and the property to the south has been added to the Site Plan. 11. Revise Site Specific Note 9 to state vehicle trips generated by proposed and future development may be incorporated into a TIA for Belmont Place at some future time. Site Specific Note 9 has been revised to state that vehicle trips generated by proposed and future development may be incorporated into a TIA for Belmont Place at some future time. 12. Why is the site triangle on the adjacent property being shown? The site triangle on the adjacent property has been removed. 13. The following comments apply to the architectural elevations: • The northwest elevation measures 103' which requires 6 architectural elements on this façade. Staff was able to identify 3 elements. Please provide the remaining 3 elements, preferably on the northern most end of the building. • The northeast façade measures 159' which requires 8 architectural elements. Staff was not able to identify any elements on the second section of the building, between the metal canopy and the EIFS canopy. Additionally, only one element was identified on the last section of the building, being the recession. Please provide the 3 remaining elements where noted. Revised building elevation drawings are provided. 14. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. The following items have been revised: • The FDC has been moved to the building wall. • A parking space has been deleted and will be striped as "No Parking"for fire department access to FDC. • The domestic waterline and fire sprinkler system line have been moved to enter the building at another location. • The ADA ramps on the east side of the building have been revised. • Parking Lot Lights have been added. LANDSCAPING/STREETSCAPING 1. Why were the required landscape points doubled? Double landscaped points are only required if the total area of building space in the building plot will exceed 50,000 s.f. Are the developments expected to exceed that threshold? Calculations have been revised. 2. Removed proposed sign from the landscape plan. Sign has been removed. 3. Per Section 7.5.D.3 of the UDO 300 additional landscape points shall be required for every 50 linear feet of frontage on a right of way. Excluding driveways there is approximately 430' of frontage on Longmire and Birmingham, which would include an additional 2,580 landscape points for a total of 6,498 points for the site. Please adjust the plan accordingly. Plan was adjusted. 4. Canopy trees that measure between 1.5" to 2" in caliper are awarded 75 points. As listed on the plan, the canopy trees would need to measure at least 3.5" caliper. Adjust the plan and calculations accordingly. Tree sizes were changed. 5. What caliper are the non-canopy trees? Crepe Myrtles must be a minimum of 1.25" on a single cane. The size is noted as 1.5". 6. Shrubs used for parking screening must be a minimum of 36" tall. The shrubs have been changed to 36"tall. 7. Staff was only able to account for 6 of the 9 Live Oaks. Calculations have been revised to show 6 Live Oak trees. MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. These notes are included on the Site Plan. ENGINEERING COMMENTS NO. 1 1. Proposed off-site Public Utility Easement will have to be dedicated prior to Site Plan approval. Easement application is being prepared. 2. Proposed off-site access easement will have to be dedicated prior to Site Plan approval. This easement is being prepared for filing. 3./Submit Easement Dedication Sheets and required documents for both proposed PUEs. You may want to dedicate blanket easement for on-site PUE initially. Easement application is being prepared. If the easements are provided, is there a need for the blanket easement? ‘)-(04 re , $rte ?Led-- C4tairiam( ) 4. Adjust locations of private fire suppression line that extends from the iso : ion valve and the domestic service line extending from the meters to outside of the PUE. These lines have been adjusted. 5r! Erosion Control Plan - Add inlet protection to existing storm inlets in City Street. Inlet Protection has been added to existing storm inlet in the City Street. 8✓ Provide letter from adjacent property owner consenting to fill/grading and drainage on his/her property as proposed. Letter is attached. 7. Indicate limits of structural backfill on Water Line W-1. The limits of structural backfill on Water Line W-1 has been indicated. 8. Provide "Letter Acknowledging City Standards." Letter is attached. 9. Storm Junction Box No. 1 connecting to public storm sewer will be public and needs to be designed / constructed to public standard. Storm Junction Box No. 1 had been noted as a public storm sewer junction box. 77 10. As fire hydrants are exempted from site triangle limitations, please install hydrant closer to street, off-line with a tee, continue line and end with required Isolation Valve. c9 Waterline has been revised as requested. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. The Electrical Note 2 needs to be changed. The Developer is only responsible for providing the 30' of rigid conduit. The Developer is not responsible for installing the first 10' of the riser. The City installs the riser. Noted GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to bread(a�cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. These notes are on the Site Plan. FIRE COMMENTS 1. FDC will require "Knox Caps". Get with DFM Steve Smith @ (979) 764-6273 for application and instructions. Noted on Site Plan. SANITATION COMMENTS 1. Sanitation is ok with this project. Noted. 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 C:a� :r Ctit.ira;t ti i�ru MEMORANDUM August 2, 2007 TO: Joe Schultz, P.E., Civil Development, Ltd, via joe@,cdlbcs.com FROM: Crissy Hartl, Staff Planner SUBJECT: TEXAS ENT (SP) — Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments pc: Adam Group Management Service, Inc., via fax 776.6288 Melody Stinson, Miller Architects, Inc, via melody.stinsonc hcdg.net Case file #07-00500162 STAFF REVIEW COMMENTS NO. 2 Project: TEXAS ENT (SP) - 07-00500162 PLANNING 1. Please provide the ownership and zoning of all abutting parcels. 2. Label or dimension all setback lines so they are distinguished from the other lines on the site plan. /3. Remove Site Specific Note 7, that the final plat is not filed. The site plan will be not be approved until the plat is filed, making the note invalid. 4. Provide a 26' access easement from the driveway on Longmire to the property to the south and adjust the pavement width to reflect that same width. 1 5. Realign the drive aisles along Longmire such that it is parallel to Longmire and provides better circulation with the driveway on the east side of the building as well as to the property to the south. 16. Remove the proposed monument sign as signs are permitted separately. Also be aware that the proposed location indicates that the sign will be in the 10' PUE and as proposed will / not be permitted. ✓ 7. Provide a note stating that Lots 1, 2, & 3 of Block 4 are a building plot. (note from plat) ✓8. Specify the height of the building in Site Specific Note#2. ✓9. General Note 8 is not correct. If a parking space is not 20' in depth, it may be down to a minimum of 18' in depth provided that it is adjacent to a landscape island of at least 4' in depth or a 6' wide sidewalk. Please remove/revise the note and adjust the plan accordingly. J 10. Temporary curbing will be required between the subject lot and the property to the south. Please indicate the temporary curbing on the site plan. 111. Revise Site Specific Note 9 to state vehicle trips generated by proposed and future development may be incorporated into a TIA for Belmont Place at some future time.I6Why is the site triangle on the adjacent property being shown? The following comments apply to the architectura I elevations: • The northwest elevation measures 103' which requires 6 architectural elements on this facade. Staff was able to identify 3 elements. Please provide the remaining 3 elements, preferably on the northern most end of the building. • The northeast facade measures 159' which requires 8 architectural elements. Staff was not able to identify any elements on the second section of the building, between the metal canopy and the EIFS canopy. Additionally, only one element was identified on the last section of the building, being the recession. Please provide the 3 remaining elements where noted. 14. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Crissy Hartl Date: July 30, 2007 LANDSCAPING/STREETSCAPING 1. Why were the required landscape points doubled? Double landscaped points are only required if the total area of building space in the building plot will exceed 50,000 s.f. Are the developments expected to exceed that threshold? 2. Removed proposed sign from the landscape plan. 3. Per Section 7.5.D.3 of the UDO 300 additional landscape points shall be required for every 50 linear feet of frontage on a right of way. Excluding driveways there is approximately 430' of frontage on Longmire and Birmingham, which would include an additional 2,580 landscape points for a total of 6,498 points for the site. Please adjust the plan accordingly. 4. Canopy trees that measure between 1.5" to 2" i n caliper are awarded 75 points. As listed on the plan, the canopy trees would need to measure at least 3.5" caliper. Adjust the plan and calculations accordingly. 5. What caliper are the non-canopy trees? Crepe Myrtles must be a minimum of 1.25" on a single cane. 6. Shrubs used for parking screening must be a minimum of 36" tall. 7. Staff was only able to account for 6 of the 9 Live Oaks. Reviewed by: Crissy Hartl Date: July 30, 2007 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. Proposed off-site Public Utility Easement will have to be dedicated prior to Site Plan approval. 2. Proposed off-site access easement will have to be dedicated prior to Site Plan approval. 3. Submit Easement Dedication Sheets and required documents for both proposed PUEs. You may want to dedicate blanket easement for on-site PUE initially. 4. Adjust locations of private fire suppression line that extends from the isolation valve and the domestic service line extending from the meters to outside of the PUE. 5. Erosion Control Plan -Add inlet protection to existing storm inlets in City Street. 6. Provide letter from adjacent property owner consenting to fill/grading and drainage on his/her property as proposed. 7. Indicate limits of structural backfill on Water Line W-1. 8. Provide "Letter Acknowledging City Standards." 9. Storm Junction Box No. 1 connecting to public storm sewer will be public and needs to be designed / constructed to pu blic standard. 10. As fire hydrants are exempted from site triangle limitations, please install hydrant closer to street, off-line with a tee, continue line and end with required Isolation Valve. Reviewed by: Carol Cotter Date: 7/27/2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides tern porary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. The Electrical Note 2 needs to be changed. The Developer is only responsible for providing the 30' of rigid conduit. The Developer is not responsible for installing the first 10' of the riser. The City installs the riser. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours tran sformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to breadcstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: July 5, 2007 FIRE COMMENTS 1. FDC will require "Knox Caps". Get with DFM Steve Smith @ (979) 764-6273 for application and instructions. Reviewed by: Steve Smith Date: 07/03/2007 SANITATION COMMENTS 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: July 25, 2007 (**,441141 CITY OF COLLEGE STATION Planning d'Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 10, 2007 TO: Joe Schultz, P.E., Civil Development, Ltd., via joe(a�cdlbcs.com FROM: Jason Schubert, Staff Planner SUBJECT: TEXAS ENT (SP) — Site Plan Staff reviewed the above-mentioned site plan application and determined it to be incomplete. The submittal, however, counts as the first round of review. The following is a preliminary list of items needed to complete the submittal and conduct a thorough review. Please submit the following information by any Monday at 10 a.m. for review that week: Provide Civil Plans; Provide Grading Plan and Erosion Control Plan; Provide Drainage Report; Provide Water Design Report. If you have any questions or need additional information, please call me at 979.764.3570. pc: 1, Adam Group Management Service, Inc., via fax 776.6288 Melody Stinson, Miller Architects, Inc, via melody.stinsonhcdq.net Case file #07-00500162