HomeMy WebLinkAboutStaff Comments STAFF REVIEW COMMENTS NO. 1
Project: Veterans Park Ph2A (SP) - 07-00500165
PLANNING
1. All signs are by separate permit
Reviewed by: Lindsay Boyer Date: July 12, 2007
ENGINEERING COMMENTS NO. 1
1. Please submit letter of acknowledgment that can be found on bcsunited.net.
2. Please submit engineer's cost estimate for the street and storm infrastructure extensions.
3. Please provide the BCS Unified Design Details for street and drainage with the next
construction document submittal.
4. Please verify that the proposed connection to SH 60 has been approved by TxDOT.
5. Please verify that the bedding detail for the RCP pipe crossing streets or structural areas
meets the city structural backfill requirement, see Detail D3-03.
6. Please submit a copy of the NOI prior to approval.
7. Please submit development permit application.
Reviewed by: Josh Norton Date: July 24, 2007
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: July 11, 2007
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit installed under previous phases of construction and
extend beyond limits of this phase for continuation by others.
5. Developer pours transformer pad(s) per City specs and design.
6. Developer installs pull boxes as per City specs and design (pull boxes provided by the City).
7. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
sweido@cstx.gov.
8. Developer provides load data for project.
9. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 7-11-07
1� 1101 Texas Avenue, P.O. Box 9960
fri
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
CITY OF COLLEGE STATION MEMORANDUM
July 24, 2007
TO: Pete Vanecek, via email
FROM: Josh Norton
SUBJECT: Veterans Park Ph2A (SP) - Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. The next submittal will be the third
and final review by staff for this round of reviews. If all items have not been addressed on the
next submittal, another $200 processing fee will need to be submitted for the subsequent set of
three (3) reviews. Please address the comments and submit the following information for
further staff review:
One (1) complete set of construction documents
Development Permit Application
If there are comments that you are not addressing with the revised site plan, please attach a
letter explaining the details. If you have any questions or need additional information, please
call me at 764-3570.
Attachments: Staff review comments
cc: Robert Schmidt, via fax 836-7936
Case file #07-00500165