Loading...
HomeMy WebLinkAboutStaff Comments • ‘ff1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CII'OF COLLEGE SIA'ION MEMORANDUM 7/30/07 TO: STEVE DUNCAN via fax: 979-731-1500 FROM: JEFFREY MISSAL, P& DS SUBJECT: PARKWAY BAPTIST CHURCH (SP) (PORT ADD)- Site Plan Staff reviewed the emailed options as requested. The following page is a list of planning review comments regarding these options. The next submittal will be the third and final review by staff for this round of reviews. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please submit the following information for further staff review: Two (2) revised site plans Easement Dedication If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 764-3570. Attachments: Staff review comments cc: Chris Snidow via fax: 979-693-1328 Case file #07-00500166 STAFF REVIEW COMMENTS NO. 2 Project: PARKWAY BAPTIST CHURCH (SP) (PORT ADD) - 07-00500166 PLANNING 1. Option #1 requires one of three choices to the western end of the walkway across the parking lot in order for it to be viable. These choices are: a. Islands must be located on either side of the walkway for pedestrian protection. b. A single island constructed wide enough for the walkway to be safely located within it for pedestrian protection, or; c. The marking of the adjacent parking spaces for handicapped only parking. Please refer to the appropriate requirements for accessible parking. 2. Option #2 requires the marking of a handicapped parking only parking place on the eastern end of the walkway. 3. Option #3: no comments at this time. 4. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. Reviewed by: Jeffrey Missal Date: 7/30/07 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to: sweido@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: 7-11-07 NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 3 ff„„..34,14 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 CITY or COLLEGE STATION MEMORANDUM July 17, 2007 TO: Steve Duncan, P.E. via hand-delivery FROM: Jeffrey Missal SUBJECT: PARKWAY BAPTIST CHURCH (SP) (PORT ADD)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Two (2) revised site plans Easement dedication documents Please note that the necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments pc: Parkway Baptist Church, Chris Snidow, via hand-delivery Case file #07-00500166 NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal letter and "bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: PARKWAY BAPTIST CHURCH (SP) (PORT ADD) — 07-00500166 PLANNING 1. The title block should include the name, address and phone number of applicant and engineer. 2. The correct zoning specified in the Notes should be R-6. 3. Gross square footage of proposed structures and their intended uses are not identified. 4. Please note that building use will dictate building setback from each other. 5. Please show proposed phasing. 6. Please provide all necessary sidewalks. 7. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not be made of aware of will constitute a completely new review. Reviewed by: Jeffrey Missal Date: 07/16/07 ENGINEERING COMMENTS NO. 1 1. Will there be grading on the property. If so, submit Grading Plan and Erosion Control Plan. 2. Provide Drainage Letter. Reviewed by: Carol Cotter Date: July 13, 2007 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: July 11, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes as per City specs and design (pull boxes provided by the City). NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 3 1 Grff1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 CITY OF COLLEGE STATION MEMORANDUM August 13, 2007 TO: Steve Duncan, P.E. via fax: 979-731-1500 FROM: Jeffrey Missal, P&DS SUBJECT: PARKWAY BAPTIST CHURCH (SP) (PORT ADD)- Site Plan Staff reviewed the above-mentioned site plan as requested. Please submit the following for stamping: Five (5) copies of the site plan (one set will be returned to you, please submit additional copies if you want more than one approved set) Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If you have any questions or need additional information, please call me at 979.764.3570. pc: Chris Snidow via fax: 979-693-1328 Case file #07-00500166