HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: THE FACTORY (SP) — 06-00500274 PLANNING 1. Please revise the site plan so that the dimensions of the proposed exercise facility and its distance to surrounding structures and property lines are legible. 2. Please reference the variance received (including date) on the site plan. 3. Please provide either color samples or a list of colors to be used, including its Sherwin Williams equivalent name/#. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 • STAFF REVIEW COMMENTS NO. 1 Project:THE FACTORY (SP)-06-00500274 PLANNING 1. Please add the title "Site Plan and Landscape Plan" to the title block of the site plan. 2. The title block on the site plan must include the following additional information: • Legal description • Name,address and telephone number of applicant, developer/owner, architect,engineer • Date of submittal • Total site area 3. All drawings needed for site review, including the site/landscape plan must be submitted in a standard engineering scale. 4. Please include the current zoning of the parcel and all abutting parcels on the site plan. 5. Please include the ownership of the abutting parcels on the site plan. 6. Please include the density on the site plan (du/ac). 7. Please better delineate the property line on the site plan. I cannot tell where the property ends to the south. 8. The application states that there are 107 parking spaces provided and the site plan states that 214 parking spaces are provided. Please reconcile. The minimum parking requirement for this project is 121 spaces (using the unit information provided in the site plan application). 9. Please provide the square footage and over all height of the parking garage on the site plan. 10. Please provide the number of stories and overall height of the main structure on the site plan. 11. Please provide locations of structures on adjacent properties. If within 15 feet, please provide information regarding fire rating/ fire protection. 12. Please show required setbacks on the plan or provide a note stating the requirements. 13. Please provide note stating that the property is not located within the floodplain (please cite FEMA/FIRM map number). 14. Please provide right-of-way widths for all adjacent streets. 15. Please provide curb and pavement detail with the site plan. 16. Please label any easements on this or adjacent property on the site plan. 17. Please label the Fire Department Connections (FDC) on the site plan. 18. Please show all meter locations on the site plan. 19. Please provide a water and sanitary sewer legend to include max/min water and sewer demands on the site plan. 20. Please show fire hydrants on site plan. 21. The layout of the project and relation to property lines, etc. is different on some of the plans. Please reconcile. 22. Balconies, canopies and awnings that are over public right-of-way require a Private Improvement in Public Right-of-way(PIP) permit. 23. A dedicated public access easement is needed for all required sidewalk areas that are on private property. 24. Please provide detail and material for all sidewalks (including interior). 25. Please provide curb detail. 26. What does "DS" refer to on the site plan? 27. Please indicate what is proposed in the space between the sidewalk and the building. It is required to be landscaped, streetscaped,or treated with brick pavers to extend the sidewalk. 28. Please better label the sidewalk benches. In some cases I cannot tell if a bench is there or not. (A legend may also be helpful). 29. I believe that an additional sidewalk bench is required on Tauber. 30. Please provide a legend on the site plan. There are several symbols on the plan that have no explanation. 31. Is any street or exterior building lighting proposed? Please provide detail. 32. Are any trash receptacles proposed? If so,please show placement on site plan and provide specs. Home of Texas A&M University 33. Are any newspaper racks proposed? If so,please show placement on site plan and provide specs. 34. Please label dumpster and screening and provide a detail of the dumpster screening. 35. Please note any mechanical areas on site and provide a detail of the screening. 36. Please provide manufacturer information for bike rack. 37. Brick pavers are required to be placed on top of full depth concrete pavement, as specified in the BCS Unified Design Guidelines Manual. 38. Please indicate the pattern of the brick sidewalk. 39. Elevations 6-9 relate to the 'Atrium.' Please lable the location of the atrium on the site plan. I see where it is shown in the building plans,but am having difficulty relating the elevations provided to that location. 40. Per section 5.6.B.4.c, Architectural Relief, all facades facing a right-of-way must incorporate at least two design elements from the list per 25' section for facades facing a right-of-way and two different design elements per 60' section on the first two stories for all other facades. I do not believe that Elevation 3, the East End Elevation facing Tauber Street,is meeting this requirement. I also do not believe that any of the parking garage elevations are meeting this requirement. 41. Glazed curtain walls are prohibited. 42. What material/ color is used for the awnings? 43. Please provide information about the brick/tubular steel fence (ie: color of steel and brick). 44. A "retaining wall" is shown in section A-A on sheet C-3. What is the material of the retaining wall? 45. Raised parking islands (min. 180 s.f.) are required at the end of every parking row for circulation and safety. Islands are provided in most cases; however I believe that they are striped and not raised concrete. 46. The minimum parking space dimensions are 9'x20'. Parking space lengths can be reduced to a minimum of 18'if there is sufficient clear space for the vehicle overhang(ie: 18'with a 2' overhang). 47. Curb cuts for parking garage entrance and compactor? 48. Provide a general note on the site plan that states the following: "all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 49. An irrigation plan is required. 50. An additional streetscape tree is required on College Main. 51. Two additional streetscape trees are required on Tauber. 52. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required on adjacent property disturbed during construction. 53. Please provide a detail showing how trees will be planted within tree wells. 54. Provide detail or specs for tree wells. 55. Please provide information about street tree soil. **Please contact me if you need the standard City details or specs for these items, including streetscape items. Reviewed by:Jennifer Prochazka Date: 12-20-06 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. (Please note on plan). 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. (Please note on plan). NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 6 ENGINEERING COMMENTS NO. 1 1. The ROW dedication the site do along Tauber needs executed not appear to matchTand accounts. previously submitted to Ci 2. Confirm y agreed ROW dedication aswell. The depicted bounds bothof trrn that all ADA requirement are satisfied (ie Please co width, adequate landings nave on 3. Provide access ease g dimensions encroachments into the etc.) sidewalk leave 4. Thep easement for areas where sidewalks leave the proposed storm sewer passable standards os plan and inside and parallel ROW depicting proposed 18"RCP or � the ROW P andd profile, to the stormHDPE,junction box must be constructed Provide e the depicting the prtpl sSed connection3at deflections to Public 5. Provide utilizing inlet—a modification of ' etc')' Provide additional detailg pilot holes and Sy the connection a detail maintenanceon the RCBC structural would be appropriate. depicted r m6. onde additional access in the detention facility. total end PP opriate. drainagetreatment for the detention feature calculations including as well as the means for proposed p tore emonstrag g the orifice equation for the P public lines and connections. each storm event is not exceeded, metering outfall device ft. grade on as well as velocities in the 8. Provide all associated standard the detention RCBC greater than the details for PYOPosed 0.06 ft in 144 and driveways. Mist public water details, the standard Construction Note public storm details — simply No. 5 on Sheet C-3 should Sewer,public sidewalks construction details for retainingp y state the limit of be consistent and covered what the 2 walls• the locations of s ' 6 in PVC Stormfractural trenches. by 9. Defineey ifirrigationt hoe is Stubs near Provide 10 The associated P proposed for the plantersthe pool are intended to plans need to be approved E the sanitary within the ROW. s ��• 1 11. The cons Eforfor tproposedSite Plan.arY needs to acquired d submitted, thee, a PIP. traction can run together with muted, the public sanitary 2 sanitary alignment shouldot be u the site cons 13.14. TheClaeify it oupdated to the construction, but Certificate of 15. Additional apt portions of the necessarya proposed is alt Occupancy ail o req Public sanitary gement. local Fireawed for the public water improvements line is noted as "by others". Codeis required requirements, improvements hydrant and meter at Cherry depicting all hydrants F including a Fire Ftoe, following applicable and College Main (in relation to etc, clarificationYeP°rt meeting guidelines: the sidewalk as to the locations of , street, etc.) as well as the "Public"Fir Line • Extent: o o From main to and including isolation Typically ends at street ROW or ed gate valve than 15 feet to building edge edge of existing easement but in no case • Design (on Site Plan and Construction Plans* o To public standards: closer o Coordinate andBCS United Design ) sizing with Licensed Fire Guidelines sizesSprinkler Engineer: 3" o *Less than a joint, does not require � 4 . and 6" Plan Plan and Profile, or PE are standard o *More a joint, — Provide details on Site o IsolationMe than joint, does require Plan and Profile, and PE gate valve with a Ampro USE, LL562 lockable lid or by City o Fire Hydrants, domestic and irrigation services equivalent approved (Hydrant ands tapsarein vault) not acceptable if after external e • Inspection: pback flow lit Fire Lines o Accepted with Letter of Completion Prevention NOTE: Any changes des made to the plans that have not been re completely "bubbled"to plans, plans.Any additional changes p y new review, quested by the City of College Station g on these plans that have not been pointed,must be rool explained n your next trans the Ci transmittal City,will�.,....... "Private"Fire Suppression Line • Extent: o From back side of isolation gate valve to the building • Design (on Building Plans): o To NFPA 24 Standards o Sized and Certified by Licensed Fire Sprinkler Engineer o Provide detailed engineered Sprinkler Plans covering Private Fire Suppression Line o Does not require Plan and Profile o No taps are permitted off Private Fire Suppression Lines • Construction: o By either a Licensed Plumber or Licensed Fire Sprinkler Company • Inspection: o Acknowledged with Certificate of Occupancy "Private"Fire Sprinkler Line • Extent: o From internal back flow device up into sprinkler system • Design (with Building Plans): o Sized and Certified by Licensed Fire Sprinkler Engineer o Provide detailed engineered Sprinkler Plans with Building Permit • Construction: o By Licensed Fire Sprinkler Company with Certification of Installation • Inspection: o Acknowledged with Certificate of Occupancy Reviewed by: Alan Gibbs Date: 12-21-06 FIRE 1. Building will be required a Knox Box 2. Door to the riser for the sprinkler system on the outside of the building 3. The riser does not appear to be accessible nor is the FDC shown on the building or the parking garage 4. There is no hydrant shown to reference the distance to a FDC Reviewed by: Eric Dotson Date: 12/21/06 SANITATION COMMENTS 1. Roll-Off compactor location looks fine,but not enough detail on screening. Reviewed by:Wally Urrutia Date: December 20,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 5 of 6 STAFF REVIEW COMMENTS Project: THE FACTORY (SP) - 06-00500274 PLANNING COMMENTS NO. 3 1. Please show how you are proposing to screen the transformer and electrical switchgear from the right-of-way. 2. Please remove details that are not proposed with this project (ie: #2 Wood Fence Elevation and #3 Wood Fence Section). 3. Please provide more information on the curb detail (dimensions, rebar, etc.). 4. The minimum requirements for sidewalks include either#3 bars @ 12" o.c. or#4 bars @ 18" o.c. Please revise details. Reviewed by: Jennifer Prochazka Date: February 9, 2007 ENGINEERING COMMENTS NO. 2 1. FYI, provide access easement for areas where sidewalks leave the ROW before Certificate of Occupancy. 2. FYI, provide an application for a PIP (Private Improvement in a Public ROVV) Permit for all proposed private improvements (including benches, irrigation, landscaping, balconies, etc.) within the ROW. The irrigation and vegetation is exempt from the indemnity requirements. This is required before Certificate of Occupancy. 3. The associated PUE for the proposed sanitary needs to be provided before Certificate of Occupancy and to allow the release of the temporary blanket easement. 4. FYI, a Development Permit for the sanitary sewer relocation has been issued. The existing line will need to be physically abandoned before full building permits can be issued. 5. FYI, we a preparing a Development Permit for Clearing and Grading for the site. This will require you to fill out a Development Permit specifically for the Clearing and Grading for the file. We will have the Permit ready, simply requiring your application. You have already paid the associated fee. 6. We are also preparing a "piers only" Building Permit for the residential structure. This will require you to fill out a Building Permit specifically for the piers only for the file. We will have the Permit ready, simply requiring your application. This will have an associated Building Permit fee related to the valuation of the piers. Also, the piers in the vicinity of the existing 5 ft utility easement and the existing sanitary sewer line will be "bubbled" so as not to be included within this Building Permit. 7. Provide an application for a PUE Abandonment for the existing 5 ft PUE on Lots 1 to 3, Block 22 of the Boyett Subdivision. Abandonments are Council items. The next possible Council meeting is on March 8, 2007. This would require the application to be submitted immediately, so that the City can contact the newspaper to advertise by February 16, 2007. Following your submittal of a complete application (including metes and bounds, private utility signatures, etc.), I will need time to prepare the paperwork on my end and secure 6 additional internal signature — before submitting to Legal on February 20, 2007. If we cannot make these deadlines, the next Council meeting is scheduled for March 22, 2007. 8. Provide a Fire Flow report meeting local Fire Code requirements. I have provided flow data on 5 of the hydrants in the vicinity by email. NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 9. Clarification as to the locations of hydrants and meters (in relation to the sidewalk, street curb, etc.). 10. The downspouts should be designed to discharge underneath the sidewalk either into a storm drain if available, or through the curb. Reviewed by: Alan Gibbs Date: 02-11-07 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3 Project: THE FACTORY (SP) — 06-00500274 ENGINEERING COMMENTS NO. 3 1. Provide a letter or report which satisfies the Fire Code requirements: i.e. proposed building square footage, building construction type (fire retardence), flow, and number of hydrants, etc. I have faxed the engineer the applicable / Fire Code excerpts. Revise the Site Utility Plan in accordance with the proposed sanitary service realignment. The proposed service will need to be in accordance with the standard service details within the ROW. The manhole the service was previously intended to be connected to will need to be noted to be plugged by pulling the rubber boot and grouting. Relocate the 2" irrigation backflow preventor out of the street. Provide the standard pavement cut/repair detail ST4-01. 5. FYI - a public access easement is required for the portions of the sidewalk on private property. This must be submitted and accepted prior to C.O. Reviewed by: Alan Gibbs Date: 3/9/07 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: THE FACTORY (SP) —06-00500274 PLANNING ir 1. Please add the title "Site Plan and Landscape Plan" to the title block of the site plan. V 2. The title block on the site plan must include the following additional information: • Legal description • Name, address and telephone number of applicant, developer/owner,architect, engineer ■ Date of submittal • Total site area t7 3. All drawings needed for site review, including the site/landscape plan must be submitted in a standard engineering scale. v 4. Please include the current zoning of the parcel and all abutting parcels on the site plan. i j 5. Please include the ownership of the abutting parcels on the site plan. ✓ 6. Please include the density on the site plan (du/ac). ✓ 7. Please better delineate the property line on the site plan. I cannot tell where the property ends to the south. • 8. The application states that there are 107 parking spaces provided and the site plan states that 214 parking spaces are provided. Please reconcile. The minimum parking requirement for this project is 121 spaces (using the unit information provided in the site plan application). 9. Please provide the square footage and over all height of the parking garage on the site plan. J 10. Please provide the number of stories and overall height of the main structure on the site plan. / 11. Please provide locations of structures on adjacent properties. If within 15 feet, please provide information regarding fire rating/ fire protection. `l 12. Please show required setbacks on the plan or provide a note stating the requirements. J 13. Please provide note stating that the property is not located within the floodplain (please cite FEMA/FIRM map number). 14. Please provide right-of-way widths for all adjacent streets. 15. Please provide curb and pavement detail with the site plan. 16. Please label any easements on this or adjacent property on the site plan. 17. Please label the Fire Department Connections (FDC) on the site plan. J 18. Please show all meter locations on the site plan. • 19. Please provide a water and sanitary sewer legend to include max/min water and sewer demands on the / site plan. 20. Please show fire hydrants on site plan. ,/ 21. The layout of the project and relation to property lines, etc. is different on some of the plans. Please reconcile. (�C`0 N. Balconies, canopies and awnings that are over public right-of-way require a Private Improvement in u Public Right-of-way (PIP) permit. )c o - ED A dedicated public access easement is needed for all required sidewalk areas that are on private property. v ✓24. Please provide detail and material for all sidewalks (including interior). 25. Please provide curb detail. V 26. What does "DS" refer to on the site plan? t727. Please indicate what is proposed in the space between the sidewalk and the building. It is required to be landscaped, streetscaped,or treated with brick pavers to extend the sidewalk. ✓ 28. Please better label the sidewalk benches. In some cases I cannot tell if a bench is there or not. (A legend may also be helpful). V29. I believe that an additional sidewalk bench is required on Tauber. 30. Please provide a legend on the site plan. There are several symbols on the plan that have no explanation. 31. Is any street or exterior building lighting proposed? Please provide detail. 32. Are any trash receptacles proposed? If so,please show placement on site plan and provide specs. Home of Texas A&M University • 433. Are any newspaper racks proposed? If so,please show placement on site plan and provide specs. kit) 134. Please label dumpster and screening and provide a detail of the dumpster screening. 35. Please note any mechanical areas on site and provide a detail of the screening. 036. Please provide manufacturer information for bike rack. �--37. Brick pavers are required to be placed on top of full depth concrete pavement, as specified in the BCS Unified Design Guidelines Manual. 38. Please indicate the pattern of the brick sidewalk. /39. Elevations 6-9 relate to the 'Atrium.' Please lable the location of the atrium on the site plan. I see where it is shown in the building plans,but am having difficulty relating the elevations provided to that location. 40. Per section 5.6.B.4.c, Architectural Relief, all facades facing a right-of-way must incorporate at least two OR(3 oh, design elements from the list per 25' section for facades facing a right-of-way and two different design elements per 60' section on the first two stories for all other facades. I do not believe that Elevation 3, 41,,,,(1-� the East End Elevation facing Tauber Street, is meeting this requirement. I also do not believe that any of the parking garage elevations are meeting this requirement. 41. Glazed curtain walls are prohibited. i I' 42. What material / color is used for the awnings? W-Ailta444-e— 43. Please provide information about the brick/tubular steel fence (le: color of steel and brick). 44. A "retaining wall"is shown in section A-A on sheet C-3. What is the material of the retaining wall? 45. Raised parking islands (min. 180 s.f.) are required at the end of every parking row for circulation and safety. Islands are provided in most cases; however I believe that they are striped and not raised concrete. 46. The minimum parking space dimensions are 9'x20'. Parking space lengths can be reduced to a minimum of 18'if there is sufficient clear space for the vehicle overhang(ie: 18'with a 2' overhang). 47. Curb cuts for parking garage entrance and compactor? 48. Provide a general note on the site plan that states the following: "all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 49. An irrigation plan is required. 50. An additional streetscape tree is required on College Main. 51. Two additional streetscape trees are required on Tauber. 52. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required on adjacent property disturbed during construction. 53. Please provide a detail showing how trees will be planted within tree wells. 54. Provide detail or specs for tree wells. 55. Please provide information about street tree soil. **Please contact me if you need the standard City details or specs for these items, including streetscape items. Reviewed by:Jennifer Prochazka Date: 12-20-06 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. (Please note on plan). 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. (Please note on plan). NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 6 irrr Gear - r1,46 11576owivs 4 172.7 /t-or- /3 M411.6"D ENGINEERING COMMENTS NO. 1 V 1. The ROW dedication along Tauber needs executed and submitted to City. The depicted bounds of the site do not appear to match previously agreed ROW dedication as well. Please confirm on both accounts. 706 2. Confirm that all ADA requirement are satisfied (ie encroachments into the sidewalk leave passable width,adequate landings dimensions, etc.) eProvide access_ easement for areas where sidewalks leave the ROW. 4. The proposed storm sewer inside and parallel within the ROW must be constructed to public standards (ie plan and profile, 18"RCP or HDPE,junction box at deflections, etc.). Provide a detail depicting the proposed connection to the storm inlet-a modification of the connection depicted in the Standard Detail SI-03 utilizing pilot holes and Synko-Flex would be appropriate. 5. Provide additional detail on the RCBC structural end treatment as well as the means for maintenance access in the detention facility. 6. Provide additional drainage calculations including the oifice equation for the metering outfall device for the detention feature demonstrating each storm event is not exceeded, as well as velocities in the proposed public lines and connections. 7. It is advisable to increase the grade on the detention RCBC greater than the proposed 0.06 ft in 144 ft. 8. Provide all associated standard details for public water details, public storm sewer, public sidewalks, and drivewa . Misc Construction Note No. 5 on Sheet C-3 should be consistent and covered by 2 ; the standard details - simply state the limit of the locations of structural trenches. Provide (�,��lP d4 construction details for retaining walls. $t `"�,�/�`�5 9. Define what the 2 6 in PVC tori Stubs near the p.921are intended to drain. o/ ✓10. Clarify if irrigation is proposed for the planters within the ROW. This will require a PIP. 5 c ,�6;e2 1 4-11. The associated PUE for the proposed sanitary needs to acquired and submitted, the public sanitary plans need to be approved for this Site Plan. 12. The construction canrun together with the site construction,but Certificate of Occupancy„.tui' r v) 13. The ment should be updated to the proposed alignment. 5'l etAAj-�#4r V(191 14. Clarify why portions of the necessary public sanitary line is noted as "by others". citah 15. Additional detail is required for the public water improvements including a Fire Flow report i eeting local Fire Code requirements, depicting all hydrants/ DCs/etc, clarification as tote (4";:z) hydrant and meter at Cherry and College Main (in relation to the sidewalk s r t etc.) as well as the r/V following applicable guidelines: •u_bli ' Fire Line • 4 nt: • From main to and including isolation gate valve ❑ Typically ends at street ROW or edge of existing easement but in no case closer than 15 feet to building edge • Design (on Site-Plan-and Construction Plans*): ❑ To public standards: BCS United Design Guidelines ❑ Coordinate sizing with Licensed Fire Sprinkler Engineer: 3", 4", and 6"are standard sizes ❑ *Less than a joint, does not require Plan and Profile, or PE- Provide details on Site Plan ❑ *More than a joint, does require Plan and Profile, and PE ❑ Isolation gate valve with a AmPro USE, LL562 lockable lid or equivalent approved by City ❑ Fire Hydrants, domestic, and irrigation services may be Tapped off Public Fire Lines (Hydrant and service taps not acceptable if after an external back flow prevention vault) • Inspection: ❑ Accepted with Letter of Completion NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 4 of 6 •rivat: 'Fire Suppression Line E -nt: ❑ From back side of isolation gate valve to the building • Design (on Building Plans): ❑ To NFPA 24 Standards ❑ Sized and Certified by Licensed Fire Sprinkler Engineer ❑ Provide detailed engineered Sprinkler Plans covering Private Fire Suppression Line ❑ Does not require Plan and Profile ❑ No taps are permitted off Private Fire Suppression Lines • Construction: ❑ By either a Licensed Plumber or Licensed Fire Sprinkler Company • Inspection: ❑ Acknowledged with Certificate of Occupancy AO`,•"e"Fire S•rink!-r Line •��.t it: ❑ From i - nal back flow device up '• o sprinkler system • Design (with : sing Plans): ❑ Sized and Certifies : Li - sed Fire Sprinkler Engineer ❑ Provide detailed ens'•-e -• Sprinkler Plans with Building Permit • Construction: ❑ By License. 'ire Sprinkler Company • • Certification of Installation • Inspecti••. ❑ Ac. -•wledged with Certificate of Occupancy Reviewed by: Alan Gibbs Date: 12-21-06 / ( FIRE 1. Building will be required a Knox Box 2. Door to the riser for the sprinkler system on the outside of the building 3. The riser does not appear to be accessible nor is the FDC shown on the building or the parking garage 4. There is no hydrant shown to reference the distance to a FDC Reviewed by: Eric Dotson Date: 12/21/06 SANITATION COMMENTS 1. Roll-Off compactor location looks fine,but not enough detail on screening. Reviewed by:Wally Urrutia Date: December 20,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 5 of 6 STAFF REVIEW COMMENTS NO. 1 Project:THE FACTORY(SP) -06-00500274 PLANNING 1. Please add the title "Site Plan and Landscape Plan" to the title block of the site plan. 2. The title block on the site plan must include the following additional information: • Legal description ■ Name, address and telephone number of applicant, developer/owner, architect, engineer • Date of submittal • Total site area 3. All drawings needed for site review, including the site/landscape plan must be submitted in a standard engineering scale. 4. Please include the current zoning of the parcel and all abutting parcels on the site plan. 5. Please include the ownership of the abutting parcels on the site plan. 6. Please include the density on the site plan (du/ac). 7. Please better delineate the property line on the site plan. I cannot tell where the property ends to the south. 8. The application states that there are 107 parking spaces provided and the site plan states that 214 parking spaces are provided. Please reconcile. The minimum parking requirement for this project is 121 spaces (using the unit information provided in the site plan application). 9. Please provide the square footage and over all height of the parking garage on the site plan. 10. Please provide the number of stories and overall height of the main structure on the site plan. 11. Please provide locations of structures on adjacent properties. If within 15 feet, please provide information regarding fire rating/ fire protection. 12. Please show required setbacks on the plan or provide a note stating the requirements. 13. Please provide note stating that the property is not located within the floodplain (please cite FEMA/FIRM map number). 14. Please provide right-of-way widths for all adjacent streets. 15. Please provide curb and pavement detail with the site plan. 16. Please label any easements on this or adjacent property on the site plan. 17. Please label the Fire Department Connections (FDC) on the site plan. 18. Please show all meter locations on the site plan. 19. Please provide a water and sanitary sewer legend to include max/min water and sewer demands on the site plan. 20. Please show fire hydrants on site plan. 21. The layout of the project and relation to property lines, etc. is different on some of the plans. Please reconcile. 22. Balconies, canopies and awnings that are over public right-of-way require a Private Improvement in Public Right-of-way (PIP) permit. 23. A dedicated public access easement is needed for all required sidewalk areas that are on private property. 24. Please provide detail and material for all sidewalks (including interior). 25. Please provide curb detail. 26. What does "DS"refer to on the site plan? 27. Please indicate what is proposed in the space between the sidewalk and the building. It is required to be landscaped, streetscaped, or treated with brick pavers to extend the sidewalk. 28. Please better label the sidewalk benches. In some cases I cannot tell if a bench is there or not. (A legend may also be helpful). 29. I believe that an additional sidewalk bench is required on Tauber. 30. Please provide a legend on the site plan. There are several symbols on the plan that have no explanation. 31. Is any street or exterior building lighting proposed? Please provide detail. 32. Are any trash receptacles proposed? If so,please show placement on site plan and provide specs. Home of Texas A&M University 33. Are any newspaper racks proposed? If so,please show placement on site plan and provide specs. 34. Please label dumpster and screening and provide a detail of the dumpster screening. 35. Please note any mechanical areas on site and provide a detail of the screening. 36. Please provide manufacturer information for bike rack. 37. Brick pavers are required to be placed on top of full depth concrete pavement, as specified in the BCS Unified Design Guidelines Manual. 38. Please indicate the pattern of the brick sidewalk. 39. Elevations 6-9 relate to the 'Atrium.' Please lable the location of the atrium on the site plan. I see where it is shown in the building plans,but am having difficulty relating the elevations provided to that location. 40. Per section 5.6.B.4.c, Architectural Relief, all facades facing a right-of-way must incorporate at least two design elements from the list per 25' section for facades facing a right-of-way and two different design elements per 60' section on the first two stories for all other facades. I do not believe that Elevation 3, the East End Elevation facing Tauber Street, is meeting this requirement. I also do not believe that any of the parking garage elevations are meeting this requirement. 41. Glazed curtain walls are prohibited. 42. What material / color is used for the awnings? 43. Please provide information about the brick/tubular steel fence (ie: color of steel and brick). 44. A "retaining wall" is shown in section A-A on sheet C-3. What is the material of the retaining wall? 45. Raised parking islands (min. 180 s.f.) are required at the end of every parking row for circulation and safety. Islands are provided in most cases; however I believe that they are striped and not raised concrete. 46. The minimum parking space dimensions are 9'x20'. Parking space lengths can be reduced to a minimum of 18'if there is sufficient clear space for the vehicle overhang(ie: 18'with a 2' overhang). 47. Curb cuts for parking garage entrance and compactor? 48. Provide a general note on the site plan that states the following: "all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 49. An irrigation plan is required. 50. An additional streetscape tree is required on College Main. 51. Two additional streetscape trees are required on Tauber. 52. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required on adjacent property disturbed during construction. 53. Please provide a detail showing how trees will be planted within tree wells. 54. Provide detail or specs for tree wells. 55. Please provide information about street tree soil. **Please contact me if you need the standard City details or specs for these items, including streetscape items. Reviewed by:Jennifer Prochazka Date: 12-20-06 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. (Please note on plan). 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. (Please note on plan). NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 3 of 5 a s' yvc - romm el• utwt ENGINEERING COMMENTS NO. 1 /1. The ROW dedication along Tauber needs executed and submitted to City. The depicted bounds of the site do not appear to match previously agreed ROW dedication as well. Please confirm on both accounts. (2.) Confirm that all ADA requirement are satisfied (ie encroachments into the sidewalk leave passable width, adequate landings dimensions, etc.) ,Vt ti 3e 3 Provide access easement for areas where sidewalks leave tlf?ROW. The proposed storm sewer inside and parallel within the ROW must be constructed to public 0(VIA7 standards (ie plan and profile, 18"RCP or HDPE,junction box at deflections, etc.). Provide a detail 1 5, depicting the proposed connection to the storm inlet-a modification of the connection depicted in Vthe Standard Detail SI-03 utilizing pilot holes and Synko-Flex would be appropriate. © Provide additional detail on the RCBC structural end treatment as well as the means for maintenance access in the detention facility. 0 Provide additional drainage calculations including the orifice equation for the metering outfall device for the detention feature demonstrating each storm event is not exceeded, as well as velocities in the proposed public lines and connections. OIt is advisable to increase the grade on the detention RCBC greater than the proposed 0.06 ft in 144 ft. cProvide all associated standard details for public water details, public storm sewer, public sidewalks, and driveways. Misc Construction Note No. 5 on Sheet C-3 should be consistent and covered by the standard details - simply state the limit of the locations of structural trenches. Provide construction details for retaining walls. dd I K +2. V 9. Define what the 2 - 6 in PVC Storm Stubs near the pool are intended to drain. ra - rSS 80 Clarify if irrigation is proposed for the planters within the ROW. This will require a PIP/.# frM✓6 The associated PUE for the proposed sanitary needs to acquired and submitted, the public sanitary plans need to be approved for this Site Plan. Te • 131 4A•4/112-4-t Swb S • F(I 12. The construction can run together with the site construction,but Certificate of Occupancy,.. ✓13. The sanitary alignment should be updated to the proposed alignment. 6Clarify why portions of the necessary public sanitary line is noted as "by others". Additional detail is required for the public water improvements including a Fire Flow report meeting local Fire Code requirements, clarification as to the locations of hydrants and meters (in relation to the sidewalk, street, etc.) as well as the following applicable guidelines: "Public" Firn 1 :-- - t CALU t/ alve sting easement but in no case closer 1 l. 42 LAC-4Alelines ,,kt,"''' - Engineer: 3", 4", and 6"are standard i , ; Profile, or PE - Provide details on Site b PYt '2 file, and PE L c-,,, C\A',,'��' " lockable lid or equivalent approved ❑ t may be Tapped off Public Fire Lines Hr an external back flow prevention • ❑ _.. -..«c1 or completion NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 4 of 5 "Private"Fire Suppression Line • Extent: ❑ From back side of isolation gate valve to the building • Design (on Building Plans): ❑ To NFPA 24 Standards ❑ Sized and Certified by Licensed Fire Sprinkler Engineer ❑ Provide detailed engineered Sprinkler Plans covering Private Fire Suppression Line ❑ Does not require Plan and Profile ❑ No taps are permitted off Private Fire Suppression Lines • Construction: ❑ By either a Licensed Plumber or Licensed Fire Sprinkler Company • Inspection: ❑ Acknowledged with Certificate of Occupancy "Private" Fire Sprinkler Line • Extent: ❑ From internal back flow device up into sprinkler system • Design (with Building Plans): ❑ Sized and Certified by Licensed Fire Sprinkler Engineer ❑ Provide detailed engineered Sprinkler Plans with Building Permit • Construction: ❑ By Licensed Fire Sprinkler Company with Certification of Installation • Inspection: ❑ Acknowledged with Certificate of Occupancy Reviewed by: Alan Gibbs Date: 12-21-06 SANITATION COMMENTS 1. Roll-Off compactor location looks fine, but not enough detail on screening. Reviewed by:Wally Urrutia Date: December 20, 2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 5 of 5 STAFF REVIEW COMMENTS NO. 1 Project: THE FACTORY(SP)-06-00500274 PLANNING 1. Please add the title "Site Plan and Landscape Plan" to the title block of the site plan. 2. The title block on the site plan must include the following additional information: • Legal description • Name, address and telephone number of applicant, developer/owner, architect, engineer • Date of submittal • Total site area 3. All drawings needed for site review, including the site/landscape plan must be submitted in a standard engineering scale. 4. Please include the current zoning of the parcel and all abutting parcels on the site plan. 5. Please include the ownership of the abutting parcels on the site plan. 6. Please include the density on the site plan (du/ac). 7. Please better delineate the property line on the site plan. I cannot tell where the property ends to the south. 8. The application states that there are 107 parking spaces provided and the site plan states that 214 parking spaces are provided. Please reconcile. The minimum parking requirement for this project is 121 spaces (using the unit information provided in the site plan application). 9. Please provide the square footage and over all height of the parking garage on the site plan. 10. Please provide the number of stories and overall height of the main structure on the site plan. 11. Please provide locations of structures on adjacent properties. If within 15 feet, please provide information regarding fire rating/fire protection. 12. Please show required setbacks on the plan or provide a note stating the requirements. 13. Please provide note stating that the property is not located within the floodplain (please cite FEMA/FIRM map number). 14. Please provide right-of-way widths for all adjacent streets. 15. Please provide curb and pavement detail with the site plan. 16. Please label any easements on this or adjacent property on the site plan. 17. Please label the Fire Department Connections (FDC) on the site plan. 18. Please show all meter locations on the site plan. 19. Please provide a water and sanitary sewer legend to include max/min water and sewer demands on the site plan. 20. Please show fire hydrants on site plan. 21. The layout of the project and relation to property lines, etc. is different on some of the plans. Please reconcile. 22. Balconies, canopies and awnings that are over public right-of-way require a Private Improvement in Public Right-of-way (PIP) permit. 23. A dedicated public access easement is needed for all required sidewalk areas that are on private property. 24. Please provide detail and material for all sidewalks (including interior). 25. Please provide curb detail. 26. What does "DS" refer to on the site plan? 27. Please indicate what is proposed in the space between the sidewalk and the building. It is required to be landscaped, streetscaped, or treated with brick pavers to extend the sidewalk. 28. Please better label the sidewalk benches. In some cases I cannot tell if a bench is there or not. (A legend may also be helpful). 29. I believe that an additional sidewalk bench is required on Tauber. 30. Please provide a legend on the site plan. There are several symbols on the plan that have no explanation. 31. Is any street or exterior building lighting proposed? Please provide detail. 32. Are any trash receptacles proposed? If so, please show placement on site plan and provide specs. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P. 33. Are any newspaper racks proposed? If so, please show placement on site plan and provide specs. 34. Please label dumpster and screening and provide a detail of the dumpster screening. 35. Please note any mechanical areas on site and provide a detail of the screening. 36. Please provide manufacturer information for bike rack. 37. Brick pavers are required to be placed on top of full depth concrete pavement, as specified in the BCS Unified Design Guidelines Manual. 38. Please indicate the pattern of the brick sidewalk. 39. Elevations 6-9 relate to the 'Atrium.' Please lable the location of the atrium on the site plan. I see where it is shown in the building plans, but am having difficulty relating the elevations provided to that location. 40. Per section 5.6.6.4.c, Architectural Relief, all facades facing a right-of-way must incorporate at least two design elements from the list per 25' section for facades facing a right-of-way and two different design elements per 60' section on the first two stories for all other facades. I do not believe that Elevation 3, the East End Elevation facing Tauber Street, is meeting this requirement. I also do not believe that any of the parking garage elevations are meeting this requirement. 41. Glazed curtain walls are prohibited. 42. What material/color is used for the awnings? 43. Please provide information about the brick/tubular steel fence (ie: color of steel and brick). 44. A"retaining wall" is shown in section A-A on sheet C-3. What is the material of the retaining wall? 45. Provide a general note on the site plan that states the following: "all roof and ground-mounted mechanical equipment shall be screened from view or isolated so as not to be visible from any public right-of-way or residential district within 150' of the subject lot, measured from a point five feet above grade. Such screening shall be coordinated with the building architecture and scale to maintain a unified appearance. 46. An irrigation plan is required. 47. An additional streetscape tree is required on College Main. 48. Two additional streetscape trees are required on Tauber. 49. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required on adjacent property disturbed during construction. 50. Please provide a detail showing how trees will be planted within tree wells. 51. Provide detail or specs for tree wells. 52. Please provide information about street tree soil. 53. Can the two curb cuts be consolidated? **Please contact me if you need the standard City details or specs for these items, including streetscape items. Reviewed by: Jennifer Prochazka Date: 12-20-06 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. (Please note on plan). 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. (Please note on plan). ENGINEERING COMMENTS NO. 1 NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P. 1. The ROW dedication along Tauber needs executed and submitted to City. The depicted bounds of the site do not appear to match previously agreed ROW dedication as well. Please confirm on both accounts. 2. Confirm that all ADA requirement are satisfied (ie encroachments into the sidewalk leave passable width, adequate landings dimensions, etc.) 3. Provide access easement for areas where sidewalks leave the ROW. 4. The proposed storm sewer inside and parallel within the ROW must be constructed to public standards (ie plan and profile, 18" RCP or HDPE, junction box at deflections, etc.). Provide a detail depicting the proposed connection to the storm inlet — a modification of the connection depicted in the Standard Detail 51-03 utilizing pilot holes and Synko-Flex would be appropriate. 5. Provide additional detail on the RCBC structural end treatment as well as the means for maintenance access in the detention facility. 6. Provide additional drainage calculations including the orifice equation for the metering outfall device for the detention feature demonstrating each storm event is not exceeded, as well as velocities in the proposed public lines and connections. 7. It is advisable to increase the grade on the detention RCBC greater than the proposed 0.06 ft in 144 ft. 8. Provide all associated standard details for public water details, public storm sewer, public sidewalks, and driveways. Misc Construction Note No. 5 on Sheet C-3 should be consistent and covered by the standard details — simply state the limit of the locations of structural trenches. Provide construction details for retaining walls. 9. Define what the 2 — 6 in PVC Storm Stubs near the pool are intended to drain. 10. Clarify if irrigation is proposed for the planters within the ROW. This will require a PIP. 11. The associated PUE for the proposed sanitary needs to acquired and submitted, the public sanitary plans need to be approved for this Site Plan. 12. The construction can run together with the site construction, but Certificate of Occupancy 13. The sanitary alignment should be updated to the proposed alignment. 14. Clarify why portions of the necessary public sanitary line is noted as "by others". 15. Additional detail is required for the public water improvements including a Fire Flow report meeting local Fire Code requirements, clarification as to the locations of hydrants and meters (in relation to the sidewalk, street, etc.) as well as the following applicable guidelines: "Public" Fire Line • Extent: ❑ From main to and including isolation gate valve ❑ Typically ends at street ROW or edge of existing easement but in no case closer than 15 feet to building edge • Design (on Site Plan and Construction Plans*): ❑ To public standards: BCS United Design Guidelines ❑ Coordinate sizing with Licensed Fire Sprinkler Engineer: 3", 4", and 6"are standard sizes ❑ *Less than a joint, does not require Plan and Profile, or PE— Provide details on Site Plan ❑ *More than a joint, does require Plan and Profile, and PE NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P. ❑ Isolation gate valve with a AmPro USE, LL562 lockable lid or equivalent approved by City ❑ Fire Hydrants, domestic, and irrigation services may be Tapped off Public Fire Lines (Hydrant and service taps not acceptable if after an external back flow prevention vault) • Inspection: ❑ Accepted with Letter of Completion "Private" Fire Suppression Line • Extent: ❑ From back side of isolation gate valve to the building • Design (on Building Plans): ❑ To NFPA 24 Standards ❑ Sized and Certified by Licensed Fire Sprinkler Engineer ❑ Provide detailed engineered Sprinkler Plans covering Private Fire Suppression Line ❑ Does not require Plan and Profile ❑ No taps are permitted off Private Fire Suppression Lines • Construction: ❑ By either a Licensed Plumber or Licensed Fire Sprinkler Company • Inspection: ❑ Acknowledged with Certificate of Occupancy "Private" Fire Sprinkler Line • Extent: ❑ From internal back flow device up into sprinkler system • Design (with Building Plans): ❑ Sized and Certified by Licensed Fire Sprinkler Engineer ❑ Provide detailed engineered Sprinkler Plans with Building Permit • Construction: ❑ By Licensed Fire Sprinkler Company with Certification of Installation • Inspection: ❑ Acknowledged with Certificate of Occupancy Reviewed by: Alan Gibbs Date: 12-21-06 FIRE 1. Building will be required a Knox Box 2. Door to the riser for the sprinkler system on the outside of the building 3. The riser does not appear to be accessible nor is the N'DC shown on the building or the parking garage 4. There is no hydrant shown to reference the distance to a FDC Reviewed by: Eric Dotson Date: 12/21/06 NOTE: Any changes made to the plans, that have not been requested by the City of College Station,must be explained in your next transmittal letter and`bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P. Sanitation Comments 1. Roll-Off compactor location looks fine,but not enough detail on screening. Reviewed by:Wally Urrutia Date: December 20, 2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. Before work is to begin a blanket easement must be signed as well as the easement from The Warehouse Apartments project. 4. The cost of the overhead line relocation is at the developers' expense. All proper paperwork must be completed and signed before work begins. 5. Proposed Utilities Plan,Sheet C-6 does not include the proper electric layout. For approved electrical removal and installation plans contact Brent Read at 979.764.5026 6. Transformers are on a delivery time of up to 60 weeks. Therefore any changes, corrections, or questions need to be addressed with CSU as soon as possible. GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes& secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to breadacstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments,please contact Brent Read at 979-764-5026. Reviewed by: Brent Read Date: December 22,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P.