Loading...
HomeMy WebLinkAboutCorrespondence v"" " " " Ili. J0 "M rxatIN,. FAX No. 979 774 0427 P. 001 1 0 PryM Prince Irrigation Commercial Irrigation Bld 06/22/2007 ATTN: Jennifer Moore Our bid for your commercial lawn sprinkler system at: Oakwood Homes \i,, Phase II Lease Foffices $2,700! ase bid, irrigation for new construction • The bid includes all labor, materials and permits for: > Commercial job as per site plan sheet 1 dated 01/2007 Installation & certification of backflow preventer per city code A one year labor and materials warranty is included in the bid, excluding darn -age from breakage. �--. . We are specifically excluding the following: G 'r1 51vc 120VAC power, conduit, electrical sleeving, etc. for the irrigation contra: Iter >. Any sleeving or boring that may be necessary 4, ➢ ' Digging deeper than 24" to find sleeves installed by others > Any water meters or water supply appurtenances Additionally, the existing system around the main office and parking needs to .e NA (` rerouted, rewired, repaired, checked and adjusted because it has been j tort C r significantly damaged by the new construction. This work is separate from the bid and can only be done on time and materials. It's difficult to-estimate what Ile ��'s‘G�Z�- cost will be but judging from the site it will cost no less than$500 to repair T••-i P I 1_-e6l cost could be significantly more depending on site factors that are unknown at c ,`(e6; this time. If you have any questions please don't hesitate to call is! vid 'rin =, Texas Licensed Irrigator#8; 07 P.O. )1::. I — Box 5188 • Bryan,Texas 77805 • Phone(979)774-4726 • Fax(979)774-0427 Bill Of Sale CLOSE QUARTERS LANDSCAPING AND DESING The following items for 4058 Highway 6 South will be performed. Trees & Shrubs $1,100.00 (Labor & Materials) Grass $650.00 (Labor & Materials) Total $1,750.00 (. * \?)) bj,(15 ,6 "L'� ,61Arflti2 \\5 (111*ff4111111111 CITY OF COIJ.FGE STATION Planning d•Development Services oA 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM December 18, 2006 TO: Alton Ofczarzak, President, OCC Construction Co., via email dave@oakchb.com FROM: Jennifer Reeves, Project Manager SUBJECT: OAKWOOD CUSTOM HOMES PHASE TWO (SP) -Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site plans One (1) landscaping plan Easement Dedication Sheet and required documents (please allow 4 weeks to process). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Michael G. Hester, P.E., Hester Engineering Company, via email mhester@hester-engr.com Case file#06-00500273 HESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE SUITE 253-B COLLEGE STATION, TEXAS 77840 979-693-1100 — mhester@hester-engr.com December 19, 2006 STAFF REVIEW COMMENTS NO. 1 Project: Oakwood Custom Homes Phase Two (SP)—06-00500273 PLANNING 1. The Title Block information appears to be cut off of the site plan.Please indude this on the next submittal. ❑ PLEASE SEE SITE PLAN. 2. Please include Phase One with Phase two identifying each phase with a phase line around it with a Phase Number.Please provide this on the site and landscape plan. ❑ PLEASE SEE INSET ON SITE PLAN. 3. Please provide setbacks along all property lines on the site plan. ❑ PLEASE SEE SITE PLAN. 4. Please provide a curb and pavement detail. ❑ THE CURB AND PAVEMENT DETAILS ARE IN THE CITIES 2006 B/CS UNIFIED STANDARD CONSTRUCTION DETAILS AND A NOTE ON THE SITE PLAN REFERENCES THE STANDARD. 5. Please proved a parking legend on the site plan showing parking required and parking provided. ❑ PLEASE SEE SITE PLAN. 6. Please identify fire lanes on the site plan. ❑ PLEASE SEE SITE PLAN 7. Please change the zoning classification from R-1 to R-6 on the site plan along Bridlegate Estates Phase 1. ❑ PLEASE SEE SITE PLAN. 8. Please provide a small key map on the site plan. ❑ PLEASE SEE SITE PLAN. ENGINEERING COMMENTS NO. 1 1. Provide volume and page of 10'PUE along rear property line. ❑ PLEASE SEE PLAN. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION ❑ PLEASE SEE PLAN. GENERAL ELECTRICAL COMMENTS ❑ PLEASE SEE PLAN. OAKWOOD CUSTOM HOMES GROUP LID. 4060 HWY.6 SOUTH,COLLEGE STATION,TX.77868 PR 979-693-1504 —FAX:979-693-2504 PLANS@ OAKCHB.COM December 24,2006 PROJECT#OAKWOOD CUSTOM HOMES PHASE TWO(SP) - Site Plan(SP)- 06-00500273 STAFFREWIEWCOMMENTS NO.. 1 Project:Oakwood Custom Homes Phase Two(SP)—06-00500273 LANDSCAPING/STRE E TSCAPING/BUFFE R 9. Provide a general note that 100% coverage of groundcover, decorative paving, decorative rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the parking lot setback,rights-of-way,and adjacent property disturbed during construction. o PLEASE SEE LANDSCAPING PLAN 10. Irrigation system must be protected by a Pressure Vacuum Breaker or a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. o PLEASE SEE LANDSCAPING PLAN 11.. All Back Flow devices must be installed and tested upon installation as per City Ordinance 2394. o PLEASE SEE LANDSCAPING PLAN 12. Please show the phase lines on the landscape plan. It is unclear how the site area is being calculated;therefore the landscaping,buffering and streetscape cannot be verified. o PLEASE SEE LANDSCAPING PLAN 13. Please provide a scale on the landscape plan. o PLEASE SEE LANDSCAPING PLAN 14. Please show details of the required masonry wall on the landscape plan. o PLEASE SEE LANDSCAPING PLAN 15. Required buffer plantings cannot be counted toward the landscape, streetscape point requirement. o PLEASE SEE LANDSCAPING PLAN 16. Please show in the legend how many 1.25 inch caliper or bigger canopy trees are required and provided and how many 5-gallon shrubs are required and provided. The buffer plantings are calculated by the length of the buffer x 15 for canopy trees and x 3 for shrubs. o PLEASE SEE LANDSCAPING PLAN 17. Please show landscape legends and point calculations for each phase. o PLEASE SEE LANDSCAPING PLAN 18. Please provide a note on the landscape plan stating; An irrigation plan must be submitted, reviewed,approved and inspected prior to CO. o PLEASE SEE LANDSCAPING PLAN MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. (111:4kfir41" CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue,P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM January 3,2007 TO: Alton Ofczarzak,President, OCC Construction Co.,via email dave(dxoakchb.com FROM: Jason Schubert, Staff Planner SUBJECT: OAKWOOD CUSTOM HOMES PHASE TWO (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have been addressed, staff will request the additional copies necessary for the site plan to be approved and stamped. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) revised site One (1) revised landscape plan If there are comments that you are not addressing with the revised site plan,please attach a letter explaining the details. If you have any questions or need additional information,please call me at 764-3570. Attachments: Staff review comments cc: Michael G. Hester,P.E.,Hester Engineering Company,via email mhestcr(caester-engr.com Case file #06-00500273 NESTER ENGINEERING COMPANY 7607 EASTMARK DRIVE SUITE 253-B COLLEGE STATION, TEXAS 77840 979-693-1100 — mhester@hester-engr.com January 4, 2007 STAFF REVIEW COMMENTS NO.2 Project Oakwood Custom Homes Phase Two (SP)-06-00500273 PLANNING 1. Provide property ownership of the abutting parcels to the west. u PLEASE SEE SITE PLAN 2. The lines separating Phase I& II on the site plan and landscaping plan are not identical. Please revise so that they are consistent. ci PLEASE SEE SITE PLAN INSET 3. On the plans, the length along the western property line is not the same (229.35'/236.95'). Please revise so that they are consistent. ❑ PLEASE SEE SITE PLAN. Landscape Plan Comments 4. The total site area of 66,550 SF does not equal the combined Phase I (45,133) and II (22,698) areas. Please revise numbers and calculate accordingly. 5. Driveway and visibility triangle areas do not need to be considered for streetscape requirements (398'of frontage,not 438'). 6. On the landscape plan, the buffer yard is limited to a 15' x 229.35' (or 236.95') area. Revise the required landscaping points based on the buffer yard area (total area—buffer yard = landscaped area). 7. To meet buffer yard requirements, all buffer yard plantings must be within the 15' area. Plantings within the buffer yard may not be used to help meet landscaping and streetscape requirements. 8. Evergreens are to comprise 50%of the buffer yard plantings. 9. Calculations for the required number of plantings should be rounded up. For example,based on a length of 229' or 237', there should be 10 canopy trees in the buffer yard and 16 non-canopy trees. 10. The Buffer Zone table states that additional non-canopy trees are needed in the buffer yard. Provide the additional trees on the landscape plan. 11. The trees along the western property line have drip lines that intersect the proposed masonry wall. As such,these trees cannot be considered as protected. Remove the protected designation for these trees. Reviewed by: Jason Schubert Date: January 3,2007 ENGINEERING COMMENTS 1. Repeat Comment Provide volume and page of 10'PUE along rear property line. ❑ AT PRESENT THERE IS NO EASEMENT ALONG THE BACK LOT LINE, A LOCAL SURVEYOR HAS BEEN CONTACTED TO PREPARE A 10-FOOT PUBLIC UTILITY EASEMENT DESCRIPTION. "ewed by: Carol Cotter Date:December 29,2006 _ (CLT;-"turN. C-° ° .7 4.k. Ck**7 (Tv) .., ti �� ( rirD-1)a --j5u)L,p1)-t--C "kN.\._s ( CY...1C \- 6t1' Nr-{, P 0•--12- --A`O'1 DU- \o'Ll\ NIC—'-' "'CA o ��" (44,11411111141 CITY OF COLLEGE STATION PlaassindDersigsmesst Services 1101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.7643570/ Fax 979.7643496 MEMORANDUM January 3,2007 TO: Alton Ofczarzak,President,OCC Construction Co.,via email dave Cwakchb.com FROM: Jason Schubert,Staff Planner SUBJECT: OAKWOOD CUSTOM HOMES PHASE TWO(SP)-Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. The next submittal will be the third and final review by staff for this round of reviews. If all items have been addressed,staff will request the additional copies necessary for the site plan to be approved and stamped. If all items have not been addressed on the next submittal, another $200 processing fee will need to be submitted for the subsequent set of three (3) reviews. Please address the comments and submit the following information for further staff review: One (1) revised site One (1) revised landscape plan If there are comments that you are not addressing with the revised site plan,please attach a letter explaining the details. If you have any questions or need additional information,please call me at 764-3570. Attachments: Staff review comments cc: Michael G.Hester,P.E.,Hester Engineering Company,via email mhester(dhester-engr.com Case file#06-00500273 STAFF REVIEWCOMMENTSNO.2 Project:Oakwood Custom Homes Phase Two(SP) - 06-00500273 Landscape Plan Comments 1. The total site area of 66,550 SF does not equal the combined Phase I (45,133) and II (22,698) areas. Please revise numbers and calculate accordingly.SEE PLAN 2. Driveway and visibility triangle areas do not need to be considered for streetscape requirements (398'of frontage,not 438').SEE PLAN 3. On the landscape plan, the buffer yard is limited to a 15'x 229.35' (or 236.95') area. Revise the required landscaping points based on the buffer yard area(total area—buffer yard =landscaped area).SEE PLAN 4. To meet buffer yard requirements, all buffer yard plantings must be within the 15' area. Plantings within the buffer yard may not be used to help meet landscaping and streetscape requirements. (REVISED PLAN TO REFLECT ACCURATE LOCATION OF EXISTING TREES) 5. Evergreens are to comprise 50% of the buffer yard plantings.NOTE ADDED 6. Calculations for the required number of plantings should be rounded up. For example,based on a length of 229' or 237', there should be 10 canopy trees in the buffer yard and 16 non-canopy trees.SEE PLAN 7. The Buffer Zone table states that additional non-canopy trees are needed in the buffer yard. Provide the additional trees on the landscape plan.SEE PLAN\ 8. The trees along the western property line have drip lines that intersect the proposed masonry wall. As such,these trees cannot be considered as protected. Remove the protected designation for these trees. (REVISED PLAN TO REFLECT ACCURATE LOCATION OF EXISTING TREES) Date January 8,2007 CITY OF COLLEGE STATION Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM January 16,2007 TO: Alton Ofczarzak,President,OCC Construction CO.,via email daveoakchb.com FROM: Jason Schubert, Staff Planner SUBJECT: OAKWOOD CUSTOM HOMES PH 2 (SP) - Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: Seven (7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) Two (2) revised site One (1) landscaping plan One (1) 11x17 grading and erosion control plan Easement Dedication Sheet and required documents. If there are comments that you are not addressing with the revised site plan,please attach a letter explaining the details. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Michael G. Hester,P.E.,Hester Engineering Company,via email mhester a,hester-engr.com Case file #06-00500273 Home of Texas A&M University (01,4111111114 CITY OF COLLEGE STATION services 1101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.764.3570/Fax 979.764.3496 MEMORANDUM January 16,2007 TO: Alton Ofczanak,President,OCC Construction CO.,via email daveCa?oakchb.com FROM: Jason Schubert,Staff Planner SUBJECT: OAKWOOD CUSTOM HOMES PH 2(SP) - Site Plan Staff reviewed the above-mentioned site plan as requested The following page is a list of staff review comments detailing items that need to be addressed.Please address the comments and submit the following information for further staff review: V Seven(7) complete sets of construction documents for the proposed development with the revised site and landscaping plans attached (one set will be returned to you, please submit additional copies if you want more than one approved set) VTwo(2)revised site t.V;One(1)landscaping plan V e(1) 11x17 grading and erosion control plan . ..-me i :-.; _. - - .d required documents. If there are comments that you are not addressing with the revised site plan,please attach a letter explaining the details. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Michael G.Hester,P.E.,Hester Engineering Company,via email mhester@hester-engr.com_ Case file#06-00500273 '-7(-9! Lxk. ph &n 4- Dion`.1 S. axt_. C o ..l. Q--3‘../ flo-11:1/5 Home of Texas A&M University sQ� E-mail Correspondence From: "Dave" <dave@oakchb.com> To: "'Jason Schubert' <Jschubert@cstx.gov> Date: 6/7/2007 5:34 PM Subject: RE: Lease office elevations Jason, Here is a pdf of the elevation facing Bridelgate drive. On this elevation they had already built it up before I noticed they didn't put the pilasters in. (I am not supervising the job but I am here most of the time) Now I am wondering if the quoins will satisfy the architectural element requirements. The Quoins are raised. We are putting the pilasters in on the other elevations. I think this elevation is the only questionable one. Give me a call in the morning so I can make sure we have this ironed out. Thanks, David C. Park Senior Designer Oakwood Custom Homes Group Ltd. 4060 Hwy. 6 South College Station, Texas, 77845 Tel. 979.690.1504 Fax. 979.690.2504 www.oakchb.com From: "Dave" <dave@oakchb.com> To: "'Jason Schubert"' <Jschubert@cstx.gov> Date: 6/7/2007 3:14 PM Subject: RE: Lease office elevations Jason, We are putting the pilasters in now so that issue has been resolved. The brick band and accent color has been dropped. Will that cause any trouble with the final inspection? David C. Park Senior Designer Oakwood Custom Homes Group Ltd. 4060 Hwy. 6 South College Station, Texas, 77845 Tel. 979.690.1504 Fax. 979.690.2504 www.oakchb.corn From: Jason Schubert To: dave@oakchb.com CC: McCarty, Benjamin Date: 6/7/2007 3:05 PM Subject: Re: Lease office elevations Dave, The building elevations for the new building were approved with the site plan on 2/7/07. When it comes time to inspect the site to see if a C.O. can be issued, we will check the approved plans to what was built. If they do not match, a C.O. will not be issued. I would either adhere to the approved elevations or submit revised elevations that conform to the Non-residential Architecture Standards. You mention that the brick pilasters (which are one of the required architecture relief elements) are being removed. Please be sure to resolve this issue. I suggest that it is much easier to change something like color or materials percentages after the fact than to be required to go back in and add architectural relief elements. Let me know if you have any questions. Jason Jason Schubert Staff Planner Planning & Development Services City of College Station Phone: 979.764.3570 Fax: 979.764.3496 From: Benjamin McCarty To: Schubert, Jason Date: 6/6/2007 5:02 PM Subject: Fwd: Lease office elevations Jason, Dave Park with Oakwood has questions about the elevations of their project. Thank you, Benjamin McCarty '00 Commercial Plans Examiner City of College Station 1101 Texas Avenue College Station, TX 77842 979.764.3570 >>> "Dave" <daveoakchb.com> 6/6/2007 10:54 AM >>> Hi Ben, I have a question regarding the elevation detail for the Oakwood lease office. I am wondering how much flexibility there was in the required elements for the elevations. I had detailed brick pilasters spaced down the length of the building as one element. Well it seems Alton told the bricklayers to make it look just like our office and I don't think they even looked at the approved elevations. I don't think Alton did either for that matter. So I am wondering how this is going to effect the final approval of this project and if there was something we could do at this stage to correct the problem. David C. Park Senior Designer Oakwood Custom Homes Group Ltd. 4060 Hwy. 6 South College Station, Texas, 77845 Tel. 979.690.1504 Fax. 979.690.2504 www.oakchb.com