Loading...
HomeMy WebLinkAboutStaff Comments 1 Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 CITY OF COLLEGE STATION Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM July 26, 2007 TO: Joe Schultz, P.E., Civil Development, Ltd., via joecdlbcs.com FROM: Jason Schubert, Staff Planner SUBJECT: GREENS PRAIRIE CENTER PH 5 (FP) — Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Wednesday, August 1, 2007, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, Thursday, August 16, 2007, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Seventeen (17) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat; and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Parviz Vessali, Texas Hotel Management, L.P, via parvizvessali(�yahoo.com Case file #07-00500173 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: GREENS PRAIRIE CENTER PH 5 (FP) - 07-00500173 PLANNING 1. Please revise the symbol used for the 40' Access Easement. It appears that it currently reflects as a property line, not an easement. 2. Since it is under separate ownership, provide a separate Lot for the Wellborn Special Utility District tract. 3. In the title block include the number of lots provided in Phase 5. 4. The Wellborn Special Utility District certification has been provided on the plat but written permission was not provided with the application. Please note that the applicant bears the burden of obtaining the certification signature from Wellborn for the plat to be filed. 5. Arrington Road will be realigned with the final plat of Greens Prairie Center Phase 2A. "Old Arrington Road" will be cul-de-sac'd from the south and the remaining City right-of-way along the boundary of this plat will likely be abandoned. Please place a note on the plat to this effect. 6. Revise Note 2 to state that the zoning is C-1 and Corridor Overlay (OV). 7. Place a note on the plat that Phase 5 has been determined to be a building plot. 8. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jason Schubert Date: July 26, 2007 ENGINEERING COMMENTS NO. 1 1. Off-site PUEs required for sanitary sewer extension. 2. FYI-CIP water line project has not yet been awarded. It is tentatively thought to be awarded in September. 3. Proposed private drive (access easement) on SH6 must be a minimum of 500 feet from intersection with SH40 and accommodate a deceleration lane. 4. Once "Old Arrington Road" is re-aligned, future access to the current Arrington Road from SH 40 will be limited to right-in—right—out only and will require a deceleration lane. TxDOT driveway permit will also be required. 5. Is the 20' PUE for the 12" water line existing or proposed? Provide volume and page numbers if existing. 6. It appears that the driveway alignment on the Site Plan submitted for Lot 2, Block 7 is different from the access easement shown on the Final Plat. Please reconcile. 7. Please add structural fill in areas of future private streets/driveways that have been shown on previous plans. 8. Drop connection required on Manhole No. 4. 9. Is the drop connection required to serve additional property? If so please add outlet stub and plug to Manhole No. 4 so it will not have to be cut later. Reviewed by: Carol Cotter Date: July 23, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 3. As the site plan develops, the additional Utility Easements may be required. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 3 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to bread@cstx.gov. 9. Developer provides load data for project. 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: July 20, 2007 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: July 18, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3 Response to Staff Review Comments No. 1 Greens Prairie Center, Phase 5 Final Plat Planning comments dated 7/26/2007;Engineering comments dated 7/23/2007 Planning 1. Please revise the symbol used for the 40'Access Easement. It appears that it currently reflects as a property line,not an easement. Response: The property line type has been added to the legend, and the access easement line type has been modified for clarity. 2. Since it is under separate ownership,provide a separate Lot for the Wellborn Special Utility District tract. Response: Lot2, Block 8 has been added. 3. In the title block include the number of lots provided in Phase 5. Response: The number of lots has been added to the title block. 4. The Wellborn Special Utility District certification has been provided on the plat but written permission was not provided with the application. Please note that the applicant bears the burden of obtaining the certification signature from Wellborn for the plat to be filed. Response: Noted. 5. Arrington Road will be realigned with the final plat of Greens Prairie Center Phase 2A. "Old Arrington Road"will be cul-de-sac'd from the south and the remaining City right-of-way along the boundary of this plat will likely be abandoned. Please place a note on the plat to this effect. Response: Note #11 from the Preliminary Plat has been added to this Final Plat as Note #9. 6. Revise Note 2 to state that the zoning is C-1 and Corridor Overlay(OV). Response: Note #2 has been revised as requested. 7. Place a note on the plat that Phase 5 has been determined to be a building plot. Response: Note #10 has been added. 8. The construction documents and reports are still under review and may affect this plat. Response: Noted. The comments on the construction plans that are included below have been addressed as noted. These plans will be resubmitted once comments on the site plan and reports are prepared and addressed. Engineering 1. Off-site PUEs required for sanitary sewer extension. Response: The easements will be provided prior to filing of the final plat. These easements can be written now that comments have been received and the alignment is not likely to change. 2. FYI-CIP water line project has not yet been awarded. It is tentatively thought to be awarded in September. Response: Noted. 3. Proposed private drive (access easement)on SH6 must be a minimum of 500 feet from intersection with SH40 and accommodate a deceleration lane. Response: A deceleration lane is shown on the plans. We have been in contact with TxDOT regarding the required distance. They have verbally agreed that the distance shown on the plans is sufficient. A permit was submitted to the City of College Station to be forwarded to TxDOT for 0 formal approval. There will be some slight adjustments to the location of the driveway on the final submittal that will lengthen this distance a few feet. 4. Once"Old Arrington Road"is re-aligned, future access to the current Arrington Road from SH 40 will be limited to right-in-right-out only and will require a deceleration lane. TxDOT driveway permit will also be required. Response: So noted. 5. Is the 20'PUE for the 12"water line existing or proposed? Provide volume and page numbers if existing. Response: The easement is proposed so there are no volume and page numbers at this time. 6. It appears that the driveway alignment on the Site Plan submitted for Lot 2,Block 7 is different from the access easement shown on the Final Plat. Please reconcile. Response: The easement lines have been adjusted on the plat to match those on the site plan. 7. Please add structural fill in areas of future private streets/driveways that have been shown on previous plans. Response: The only location where a future driveway is somewhat certain is adjacent to the First National Bank Property,from about Station 6+50 to Manhole #2. Structural backfill has been added in that segment. All other previous plans are conceptual only and we do not know where the crossings will be located. 8. Drop connection required on Manhole No. 4. Response: A drop has been added. 9. Is the drop connection required to serve additional property? If so please add outlet stub and plug to Manhole No.4 so it will not have to be cut later. Response: A 5'stub-out has been added. (*ffill11111 CITY OF COT.T.FGE STATION r ..,. Planning d Development Services 1101 Texas Avenue, P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM August 6,2007 TO: Joe Schultz,P.E., Civil Development,Ltd.,via joe(a,cdlbcs.com FROM: Jason Schubert,Staff Planner SUBJECT: GREENS PRAIRIE CENTER PH 5 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is the staff review comment for the item that needs to be addressed. Please address the comment and have the following information submitted by Tuesday,August 7, 2007, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, Thursday, August 16, 2007, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Seventeen (17) 11"x17" copies of the revised final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov The agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Parviz Vessali,Texas Hotel Management,L.P,via parvizvessaWyahoo.com Case file#07-00500173 Home of Texas A&M University STAFF REVIEW COMMENTS NO.2 Project: GREENS PRAIRIE CEN 1'ER PH 5 (FP) -07-00500173 PLANNING 1. Revise Note 9 to state Greens Prairie Center Phase 2A instead of 2B. Reviewed by: Jason Schubert Date: August 6,2007 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2