HomeMy WebLinkAboutStaff Comments *-
CITY OF COLLEGE STATION
Planning&Development Services
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 24, 2007
TO: Wallace Phillips, Greens Prairie Investors, Ltd. via fax 690.1041
FROM: Jeffrey Missal, P&DS
SUBJECT: Castle Rock Ph. 1B & 1C Final Plat— Staff Review Comments #1
Staff reviewed the above-mentioned final plat as requested. The following page is a list
of staff review comments detailing items that need to be addressed. If all comments
have been addressed and the following information submitted by Monday, July 30,
10:00 a.m., your project will be placed on the next available Planning and Zoning
Commission meeting scheduled for August 16, 7:00 p.m. in the City Hall Council
Chambers, 1101 Texas Avenue.
Two (2) copies of the revised final plat;
Parkland Dedication in the amount of $3580 must be submitted prior to the
filing of the final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart@cstx.gov
Upon receipt of the required documents for the Planning & Zoning meeting, your project
will be considered formally filed with the City of College Station. Please note that if all
comments have not been addressed your project will not be scheduled for a Planning &
Zoning Commission meeting. Your project may be placed on a future agenda once all
the revisions have been made and the appropriate fees paid. If you have any questions
or need additional information, please call Molly Hitchcock or myself at 979.764.3570.
Attachments: Staff review comments
cc: Joe Shultz, PE, Civil Development, Ltd. via fax 764.7759
Case file #05-00500009
PLANNING
1. The Planning and Zoning Commission approved the Preliminary Plat with the following
condition:
Please add the following plat note: The 30' access easement through Phase 1B
that connects to Rocky Creek Court in Phase 1C is for secondary access from
William D. Fitch Parkway to the Castle Rock Subdivision for emergency vehicles.
The access easement between Phases 1B and 1C will be for pedestrian, bicycle,
and emergency access only. The easement will be gated at the property line
between Lot 7 Block 11 and Greenbelt No. 5 to prevent non-emergency vehicular
access. A knox box padlock will be the only mechanism for opening the gate.
The mylar needs to be updated to reflect this and please add the note to the final plat.
2. The bounds of the property do not close.
Reviewed by: Jeffrey Missal Date: 7/19/07
ENGINEERING
1. No comments on plat, construction comments to be provided at a later time.
Reviewed by: Carol Cotter Date: 07/23/2007
FIRE
2. No comments
Reviewed by: Steve Smith Date: 07/23/2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
3. As per a conversation with Joe Schultz of Civil Development Ltd. an additional 10' PUE may
be necessary on Block 6, lots 18 and 19.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to
bread@cstx.gov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Brent Read at
979.764.5026.
Reviewed by: Brent Read Date: July 20, 2007
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: July 18, 2007
TXDOT COMMENTS
1. Access driveways to SH 40 must meet TxDOT's current "Regulations for Access Driveways to
State Highways". Regulations are primarily based on posted speed limits and distances
between proposed & adjacent access points. Where the posted speed limit is 50 MPH or more
the required spacing between access points is 425'. Where access spacing is insufficient joint
access will be required or access to internal/external streets. Appropriate data will be required
for any future work/permits in the ROW @ this development site, which should include
drainage data, etc.
Reviewed by: Karl Nelson Date: July 16, 2007
0
(*ffil"
CITY OF COI I.FOE STATION
Planning d Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
August 6,2007
TO: Wallace Phillips, Greens Prairie Investors,Ltd. via fax 690.1041
FROM: Jeffrey Missal,P&DS
SUBJECT: CASTLEROCK PH 1B & 1C (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. Your project has been placed on the
next available Planning and Zoning Commission meeting scheduled for August 16, 7:00 p.m. in the
City Hall Council Chambers, 1101 Texas Avenue. Please submit the following by 10 a.m. this
Wednesday morning,August 8:
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov;and
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if documents have not
been received, your project will be removed from the Planning & Zoning Commission meeting
agenda. Your project may be placed on a future agenda once all the documents have been received.
The P&Z agenda and staff report can be accessed at the following web site on Monday the week of
the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information,please call me at 979.764.3570.
cc: Joe Shultz,PE, Civil Development,Ltd. via fax 764.7759
Case file #07-00500175
Home of Texas A&M University
•
Response to Staff Review Comments No. 1
Castle Rock Subdivision, Phases 1B & 1C Final Plat
(dated 7/24/2007)
PLANNING
1. Note has been added to the Preliminary Plat and the Final Plat.
2. The boundary has been checked. It does not close by 0.01', which is due to rounding
as the boundary is created. It does not affect any of the distances on the plat calls.
All other comments (Engineering, Fire, Electrical, General Electrical, Sanitation& TxDOT)
have been noted.