Loading...
HomeMy WebLinkAboutStaff Report STAFF REPORT Project Manager: Jason Schubert, Staff Planner Report Date: December 21, 2006 Email: jschubert@cstx.gov Meeting Date: January 4, 2007 Project Number: 06-00500268 Item: Presentation, possible action, and discussion of a Final Plat for Shenandoah Phase 11 consisting of 32 lots on 9.296 acres located at 2051 Barron Road in the general vicinity of Southern Plantation Drive and Newport Lane. Applicant: Ed Froehling, property owner Staff Recommendations: Staff recommends approval of the final plat. Item Summary: This item is for consideration of a final plat of a residential subdivision for 32 single family lots on 9.296 acres within the corporate limits of the City of College Station. Comprehensive Plan Considerations: The Land Use Plan designates this area as Single Family Medium Density (3-6 dwelling units/acre). The proposed density of 3.44 dwelling units/acre is in compliance with the Comprehensive Plan. The plat is also in compliance with the Subdivision Regulations and Unified Development Ordinance. Phases 11 will include the partial extension of Newport Lane, a minor collector on the City's Thoroughfare Plan, from Southern Plantation Drive, also a minor collector. Once the future Phase 10 is final platted and constructed, Newport Lane will be extended through to Barron Road, a minor arterial. That extension will also including a stub into a phase of the Reatta Meadows subdivision to the west. This plat is located within the Spring Creek Sanitary Sewer Impact Fee Area. Impact Fees of$349.55/Living Unit Equivalent will be due at the time of building permit. Item Background: The property was annexed in 1995. It is zoned R-1 Single Family Residential and is a continuation of the Shenandoah Master Development Plan. The Preliminary Plat for Phases 10 & 11 was approved on November 2, 2006. Phases 12, 13, and 14 were final platted in June 2004, July 2004, and January 2005, respectively. Budgetary & Financial Summary: NA Related Advisory Board Recommendations: The Parks Board accepted parkland dedication with the master development plan. Parkland development fees in the amount of$11,456 (32 dwelling units X $358/unit)will be required prior to filing the final plat. Commission Action Options: The Commission has final authority over the final plat. The options regarding the final plat are: • Approval • Denial Supporting Materials: 1. Small Area Map (SAM) and Aerial Map 2. Application 3. Copy of Final Plat (provided in packet)