Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: Shenandoah Phase 11 (FP) -06-00500268 Planning 1. Provide the volume and page number for the 20' PUE located along the eastern boundary of Phase 11. 2. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jason Schubert Date: December 11, 2006 Fire 1. No more than thirty (30) dwelling units on single access road unless you can show future road that will give required access. Reviewed by: Steve Smith Date: December 5, 2006 Electrical Comments Requiring Immediate Attention 1. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 2. Provide street light easement per electric design plan. General Electrical Comments 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes & secondary pedestals provided by the city). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to gmartinez(a,cstx.gov / sweidoacstx.gov / breadacstx.gov / tmichalscstx.gov 9. Developer provides load data for project. 10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314 or Tony Michalsky at 979.764.3438 . Reviewed by:Tony Michalsky Date: December 7,2006 Sanitation Comments 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 6,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 STAFF REVIEW COMMENTS NO. 1 Project: Shenandoah Phase 11 - 06-00500268 PLANNING 1. FYI, the Spring Creek Sanitary Sewer Impact Fee of $349.55/LUE will be required at the time of building permit. 2. The construction documents and reports are still under review and may affect the plat. Reviewed by: Jason Schubert Date: December 18,2006 ENGINEERING COMMENTS NO. 1 1. Please submit engineers cost estimate. 2. Please submit NOI prior to receiving DP. 3. (Sheet 7) Would it be possible to adjust manholes 2.2 and 1.2 to give more clearance between the storm pipe and manhole stack? 4. (Sheet 12) Please update the trench detail as it does not match the design guidelines or explain why this detail is better. Reviewed by: Josh Norton Date: December 15, 2006 Home of Texas A&M University