HomeMy WebLinkAboutEngineer's Cost Estimate 4 SHENANDOAH,PHASE 11 MBESI PROJ#:1060-0005 Engineer's Estimate of Construction Costs December 4,2006 Item# Description I Unit Quantity I Unit Price I Total Paving Construction 1 Excavation(Roadway and Lots) C.Y. 3,244 6.00 19,464 2 6"Lime Stabilized Subgrade(6%by weight) S.Y. 6,923 3.25 22,500 3 6"Crushed Limestone Base S.Y. 3,036 8.25 25,047 4 8"Crushed Limestone Base S.Y. 2,346 10.25 24,047 5 2"HMAC Surface Course(including prime coat) S.Y. 5,383 9.40 50,597 6 Concrete Curb and Gutter(all types) L.F. 2,877 9.50 27,332 7 6"Reinforced Concrete Pavement S.Y. 164 36.00 5,904 8 4"Reinforced Concrete Sidewalk S.F. 6,969 3.00 20,907 9 Colored Sidewalk Ramps EACH 4 500.00 2,000 10 End/Road Markers EACH 3 250.00 750 Paving Subtotal $198,547 Drainage System Construction 11 15"HDPE Pipe,(ADS,N-12 or approved equal w/water- L.F. 30 25.00 750 tight joints)Str.Backfill 12 24"RCP Pipe,ASTM C76 Cl III(Non-Str.Backfill) L.F. 67 50.00 3,350 13 24"HDPE Pipe,(ADS,N-12 or approved equal w/water- L.F. 472 33.00 15,576 tight joints)Sir.Backfill 14 24"HDPE Pipe,(ADS,N-12 or approved equal w/water- L.F. 41 28.00 1,148 tight joints)Non-Str.Backfill 15 30"HDPE Pipe,(ADS,N-12 or approved equal w/water- L.F. 475 45.00 21,375 tight joints)Str.Backfill 16 36"HDPE Pipe,(ADS,N-12 or approved equal w/water- L.F. 125 70.00 8,750 tight joints)Str.Backfill 17 Standard 10'Recessed Inlet EACH 6 2,500.00 15,000 18 Standard 5'Recessed Inlet EACH 1 2,000.00 2,000 19 Standard Junction Box EACH 1 1,500.00 1,500 20 Storm Drain Plug EACH 1 300.00 300 Drainage System Subtotal $69,749 Water System Construction 21 8"PVC,C909 Cl 200,Water Line,Str.Backfill L.F. 620 20.00 12,400 22 6"PVC,C909 Cl 200,Water Line,Str.Backfill L.F. 20 17.00 340 23 6"PVC,C909 Cl 200 Water Line,Non-Str.Backfill L.F. 26 13.25 345 24 3"PVC,C909 CI 200 Water Line,Str.Backfill L.F. 70 14.00 980 25 3"PVC,C909 Cl 200 Water Line,Non-Str.Backfill L.F. 748 12.00 8,976 26 Fire Hydrant Assembly EACH 2 2,650.00 5,300 27 8"x6"M.J.Tee EACH 2 365.00 730 28 6"x3"Tapped Plug EACH 2 300.00 600 29 8"M.J.Gate Valve EACH 2 850.00 1,700 30 6"M.J.Gate Valve EACH 2 675.00 1,350 31 8"x13"M.J.Anchor Coupling EACH 2 195.00 390 32 6"x13"M.J.Anchor Coupling EACH 6 130.00 780 33 6"x45 deg.Bend EACH 4 240.00 960 34 8"x22.5 deg.Bend EACH 2 300.00 600 35 3"x22.5 deg.Bend EACH 2 150.00 300 36 2"Blow Off Valve Assembly EACH 3 850.00 2,550 37 Water Service, 1.5"type K Copper,short side(<20') EACH 6 625.00 3,750 38 Water Service, 1"type K Copper,short side(<20') EACH 2 450.00 900 39 Water Service, 1.5"type K Copper,long side(>20') EACH 8 1,690.00 13,520 40 Water Service,1"type K Copper,long side(>20') EACH 2 1,250.00 2,500 Water System Subtotal $58,971 1 of 2 r SHENANDOAH,PHASE 11 MBESI PROJ#:1060-0005 Engineer's Estimate of Construction Costs December 4,2006 Item#I Description I Unit I Quantity I Unit Price 1 Total Sewer System Construction 41 6"PVC,D-3034 SDR 26 L.F. 1,198 6.18 7,404 42 6"PVC,D-2241 SDR 26 L.F. 40 6.43 257 43 Sir.Backfill(5'-8'Depth) L.F. 520 24.42 12,698 44 Str.Backfill(8'-10'Depth) L.F. 165 33.20 5,478 45 Non-Str.Backfill(5'-8'Depth) L.F. 244 11.25 2,745 46 Non-Str.Backfill(8'-10'Depth) L.F. 309 14.07 4,348 47 Standard Manhole,0-6 ft.deep EACH 7 1,750.00 12,250 48 Extra Depth for Manhole V.F. 8.0 200.00 1,600 49 Short Side 4"Sewer Service(<20') EACH 12 350.00 4,200 50 Long Side 4"Sewer Service(>20') EACH 8 1,200.00 9,600 51 Trench Safety(sewer) L.F. 1,238 1.00 1,238 Sewer System Subtotal $61,818 Erosion Control Construction Erosion Control Plan&Sedimentation Control(per Item 52 106)(includes silt fencing,construction exits,straw bale S Y 1 16,000.00 16,000 bathers,inlet protection,grass seeding,and any other sedimentation control devices) Erosion Control Subtotal $16,000 Total Construction Cost $405,085 The above construction estimate is based on the engineer's preliminary opinion of probable construction costs. This estimate constitutes our best judgment at this time. Please note that the engineer does not have any control over contractor or supplier workloads and the degree to which inflation may affect project costs between now and the bid date. During construction,additional features may become apparent as the work progresses,which will result in an increase in cost. LI(Ar MA/06 Je L. o•!,.47•PP.E. Date * /'\ •▪• *I/1 JEFFERY L.ROBERTSON ................ "0 94745.........:..... JO-t`S:/PENSEv.:C���• = ,1bu 7©NAL E-= mss.+. 2 of 2