Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: SADDLE CREEK PH 1 (FP) - 06-00500267 PLANNING 1. Who will be maintaining the common areas? Please add a note to the plat with this detail. 2. Our GIS Staff has indicated that the metes and bounds of this plat does not close. Please adjust the plat accordingly. 3. Please be advised that according to Section 12-I.1 of the City's Subdivision Regulations requires that every lot in a rural residential subdivision must have access to a public or private street. It appears that the Dougherty tract does not meet this requirement. Please revise to see that this lot meets that standard. Reviewed by: Crissy Hard Date: December 11,2006 ENGINEERING COMMENTS 1. The construction documents for this project are still under review. Please allow more time for engineering to provide comments. We will forward them to you as soon as possible. Reviewed by:Josh Norton Date: December 11, 2006 BRAZOS COUNTY 1. Please allow more time for the County to provide comments. We will forward them to you as soon as possible. Reviewed by: Gary Arnold Date: December 11,2006 BTU COMMENTS 1. Notes 13 and 14 are a little misleading. The electric service for these lots will come from the front of the lots. However,we will use some of the side lot easements for some of our electric distribution lines. Reviewed by: Randy Trimble Date: December 11, 2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. Page 2 of 2 ENGINEERING COMMENTS NO. 1 Saddle Creek Final Plat 1. Please submit full set of construction documents: streets,drainage, etc. 2. Please submit drainage report. 3. The reports and construction document submittals should be the same for the county and College Station. 4. (Sheet 4 and 5) Please verify that a flushing appurtenance is not needed at the low points in these lines. 5. (Fire Flow) Please verify that the fire flow test was done in accordance with the NFPA 291 Chapter 4 standards. 6. (Fire Flow) A fire flow test will need to be performed and submitted upon completion of the line to verify the constructed system meets the BCS minimum design guideline requirements. 7. (Final Plat and Construction Documents) Brazos County will need to review the final plat as well as the full set of construction documents and reports. We will forward these as soon as we receive them from the county. 8. (Final Plat) Please add a note that defines the slope and drainage easement maintenance responsibilities. It is my understanding that the county will not maintain drainage easements; therefore it may be appropriate for the HOA to maintain these. Reviewed by: Josh Norton Date: December 15, 2006