Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project:SOUTHWOOD SEC 26 (FP-REPLAY) - 06-00500264 PLANNING 1. Revise the title block This should read: Final Plat Of Lot 19A-R and 19B -R,Block 10 Southwood,Section 26 Being a Replat of Lot 19,Block 10 Southwood,Section 26 Volume 310,Page 687 2.10 Acres 2. Amend the Lot names to 19A-R and 19B -R 3. Provide access easement to Lot 19B.This lot does not meet the spacing requirements to obtain its own driveway.Access must be provided from 19A. Reviewed by. Lindsay Boyer,Staff Planner Date: December 11,2006 ENGINEERING 1. Our records indicate an existing 15'PUE (vol381pg 469) in the area of the proposed lot line. Add to plat or submit documents to verify that it has been abandoned. 2. Provide volume and page numbers of existing easements. 3. It appears that the current effective BFE ranges from 261 at the east end of the property to 262.8' at west, (You may want to verify) The effective BFE is determined from the current FEMA FIS study and is the regulated BFE until the channel improvements are completed and the LOMR is approved by FEMA. It is the effective BFE that should appear on the plat. You may want to also show the revised BFE as `BFE based on CLOMR channel improvements". Reviewed by: Carol Cotter Date: December 7,2006 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer,developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per city specs and design. 7. Developer installs pull boxes &secondary pedestals as per city specs and design.(pull boxes &secondary pedestals provided by the city). NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweidoCa.cstx.gov . 9. Developer provides load data for project. 10. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314 or Tony Michalsky at 979.764.3438 . Reviewed by: TonyMichalsky Date: 12-7-06 SANITATION 1. Sanitation is ok with this project. Reviewed by: Wally Urrutia Date: December 6,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3