Loading...
HomeMy WebLinkAboutCorrespondence r l , KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4101 a as Avenue, Suite A P.O. Box 4234 Bryan, Texas 77802 Tel. 979/846-6212 Bryan, Texas 77805 Fax 979/846-8252 TO: City of College Station - Development Services DATE: October 16, 2006 PROJECT NO.: PROJECT NAME: Gateway Phase 4 Final Plat ATTENTION: Bridgette George REFERENCE: WE TRANSMIT: THE FOLLOWING: FOR: ❑ Under Separate Cover ❑ Prints ❑ Your Review&Approval ✓ Enclosed 0 Copies ✓ Your Review & Comment 0 Originals ✓Your Review& Distribution VIA: ✓ Plat ❑ Your Review, Revision & Return ❑ Mail 0 Field Notes 0 Your Signature & Return ✓ Messenger 0 Plans 0 Your File and/or Use O Federal Express 0 Report 0 For Filing at the Courthouse O Lone Star Overnight ❑ Estimate ❑ UPS ❑ Cut Sheets 0 As Requested By: ❑ Special Courier ❑ Computer Printout ❑ Please Acknowledge Receipt of O Picked Up By Your Office ❑ File Enclosures 0 Contract ❑ Please Return Enclosures To ❑ Other- Invoice ❑ Copies Of This Letter Of Transmittal Sent To: NO. DESCRIPTION 14 Final Plat 1 Application + Check List 1 $1055.00 check ($400.00 Plat Application Fee, If Enclosures Are Not As Noted $600.00 Infrastructure Insp. Fee* Please Notify Us At Once. *Please Note: Infrastructure to the lot is currently under Construction This Fee is for the Site Infrastructure which will be submitted as part of the Signed: Fred Pai' - .E. site plans. $55.00 County Filing Fee 1 Tax Certificate / �! 1 rw • 'J KLING ENGINEERING & SURVEYING Consulting Engineers• Land Surveyors 4101 Texas Avenue, Suite A P.O. Box 4234 Bryan, Texas 77802 Tel. 979/846-6212 Bryan, Texas 77805 Fax 979/846-8252 TO: City of College Station- Development Services DATE: November 20, 2006 PROJECT NO.: PROJECT NAME: Gateway Phase 4 Site Plans + Public Infrastructure Plans ATTENTION: Bridgette George REFERENCE: WE TRANSMIT: THE FOLLOWING: FOR: ❑ Under Separate Cover 0 Prints 0 Your Review&Approval ✓ Enclosed 0 Copies ✓Your Review& Comment ❑ Originals ✓Your Review& Distribution VIA: 0 Plat 0 Your Review, Revision & Return ❑ Mail ❑ Field Notes 0 Your Signature & Return ✓ Messenger ✓Plans 0 Your File and/or Use O Federal Express ✓ Report 0 For Filing at the Courthouse ❑ Lone Star Overnight ✓ Estimate ❑ UPS 0 Cut Sheets 0 As Requested By: O Special Courier 0 Computer Printout 0 Please Acknowledge Receipt of ❑ Picked Up By Your Office 0 File Enclosures ❑ Contract 0 Please Return Enclosures To ❑ Other-Invoice 0 Copies Of This Letter Of Transmittal Sent To: NO. DESCRIPTION 1 Site Plan Application 1 $200.00 Site Plan Application Fee 1 $200.00 Development Permit Application Fee, If Enclosures Are Not As Noted ($600.00 Infrastructure Fee Previously Submitted) Please Notify Us At Once. 12 Copies of Site Plans including Public Infrastructure 1 Landscape & Irrigation Plan 2 Engineer's Estimate for Public Infrastructure 2 Waterline Design Report 2 Sanitary Sewer Design Report Signed: FredZnin ' E. Grrifi CITY OF COLLEGE STATION January 19,2007 David Scarmardo,President Brazos Gateway Place Development,Ltd. 1289 North Harvey Mitchell Parkway College Station,Texas 77803 Re: Gateway Phases 2 and 4 Subdivision–Fire Access Mr. Scarmardo, This letter follows our meeting regarding the subject fire access road requirement where we are proposing an alternative to help facilitate the continued progress of your development and cover the related health and safety concerns. Currently,there are approximately 124un-sprinkled,multi-family dwelling units in -{Deleted:o Gateway Villas located in Gateway Phase 2 Subdivision with only a single point for emergency vehicular traffic. Exceeding 100 un-sprinkled,multi-family dwelling units requires a second,remote fire access road. The units were constructed pursuant to •permits issued by the City. c\foW Srk pP 4)(4 oh� 1-16 With specific regard to the secondary fire access road,a Development Permit can be issued to allow full Site Plan construction to begin as well as Building Permit to be issued on Phase 4,provided that you: GoL,4wS1111 1 1. Construct a 26 ft wide fire access road with adequate turning radii for ladder fire ----Deleted:Provide complete engineered truck. The pavement section should consist of a minimum of Semi–Permanent construction plans acceptable to the City for the construction of All-Weather Surface consisting of six inches(6")of limestone base Jt is common_ Deleted:with one-course seal coat as to create these temporary fire roads using rock only. If the semi-permanent specified in the Texas Department of surface is used,the six-inch(6")curb is not required,and these areas must be Transportation Standard Specifications for Construction of Highways,Streets gated or protected from public usage and signed for emergency access only. and Bridges,1993 Edition,Item 316. aS �f 2. Provide an engineer'srcertification that the fire access road and underlying berm is structurally adequate to maintain a 75,000 lb fire truck. It is suggested to have a geotechnical analysis of the soils and the existing or required compaction effort', ,�.t� necessary to achieve this. ` � 4 FiK '�-,.�'�I Lr` kheose kat 4-0 �e wv '�G Pp� �� !F 1 g4-s .e "' Liv vp) 0 I L,'10 �1' ,Unnecessary if we build it s. a co . ' 'on to�receiving certificates of occupancy. --- Deleted:Provide and Engineer's f Estimate for all associated construction !r costs of the fire access road. a^_Unnecessary r rsuant to comment above. Formatted J Deleted:<#>Provide an Unconditional This wil equire us topr:sare a siteplan that will be c', ged as soon as we w irk on Letter of Credit acceptable to the City for the newest s,ase recent approved as a comp plan amendm- • This is an 9-- sense and the amount provided on the Engineer's 0 Estimate: ¶ an approval p .-•• at adds nothing to the health and safety oft e ci izenst ¶ � '„ <#>in accordance with the standard Note that full Building Permits�always require the associated waterlines/hydrants be Letter of Credit form(attached),¶ `/ 9 constructed,accepted and active and that there is adequate drive surface for fire trucks. ', ',0, <#>from a local bank,¶ Slab only permits may be considered by the Building Official prior to full Building ', with an expiration date,not beyond July , ,,' 1,2007 Permit to also aid in project scheduling. r Formatted:Bullets and Numbering „' When the additional phase of Gateway Villas (adjacent to the detention pond) is \\l Formatted constructed,this Semi-Permanent All-Weather Surface fire access drive must be removed Deleted:Provide the associated Site Plan modifications acceptable to the City or reworked to meet the Permanent All-Weather Pavement standards including curbing , to the existing Gateway Villas Site Plan and either asphalt or concrete. , (i.e.number of parking spaces,required i end islands,relocated dumpsters,revised landscaping,etc.) • ally, due to the a socia -d health and safety oncern .ssociated wit fire acc- s, theDeleted;¶ C ificates of Occ saucy fo the future buil.' gs in Gate ay Phase 4 'ill not be i ed unt the subject fir access roa,' construction.s complete an. , ceptab - to the City. -- Deleted:If the fire access is not • constructed within the timeframe allotted Pleas let us kno how you wou e t. = oceed. on the associated Letter of Credit and the City has to draw on the surety,any Best Regards, related Certificates of Occupancy will be held until the City is able to complete construction of the fire access.¶ XXXXX XXXXX Attachments Cc: xxxxx jlaxiL r,1 . 4 -,aZ& sS oe wtw ✓ �� u-n n DP )55062 -- 51,W DefI /QJ - 51,kgo .tet, (SS vpv \/ No Comics-rcg LS Arzfrivo 14 - — c hs — NIA- r3Utbonito P64/� tib,- et# V1,U6 6a4:4 5LW v3S CITY OF COLLEGE STATION January 19, 2007 David Scarmardo, President Brazos Gateway Place Developm nt, Ltd. �- 1289 North Harvey Mitchell Park ay College Station, Texas 77803 Re: Gateway Phases 2 and 4 S bdivisio Fire Access Mr. Scarmardo, This letter follows our meeting regarding the subject fire access road requirement where we are proposing an alternative to help facilitate the continued progress of your development and cover the related health and safety concerns. Currently, there are approximately 120 un-sprinkled, multi-family dwelling units in Gateway Villas located in Gateway Phase 2 Subdivision with only a single point for emergency vehicular traffic. Exceeding 100 un-sprinkled, multi-family dwelling units requires a second, remote fire access road. With specific regard to the secondary fire access road, a Development Permit can be issued to allow full Site Plan construction to begin as well as Building Permit to be issued,provided that you: . Provide complete engineered construction plans acceptable to the City for the con - tion of a 26 ft wide fire access road with adequate turning radii for ladder fire truck. •.vement section should consist of a minimum of Semi— Permanent All-Weat - - face consisting of six inches (6") of limestone base with one-course seal coat as spe • -• in the Texas Department of Transportation Standard Specifications for Construction • - '.hways, Streets and Bridges, 1993 Edition, Item 316. If the semi-permanent surface is • -• the six-inch(6") curb is not required, and these areas must be gated or protected from •. • 'c usage and signed for emergency access only. 604,4 Iou* 2. Provide an engineer's(certification that the fire access road and underlying berm is structurally adequate to maintain a 75,000 lb fire truck. It is suggested to have a geotechnical analysis of the soils and the existing or requireyk compaction effort necessary to achieve this. cl\rt NuM'Swkll o a,tL ' . . ' ovide and Engineer's _ ' a e for all associated construction .- . •f the fire acces . 4. ' •vide an Unconditional Letter of Credit acceptable to the City for the amount provi•e• : • he Engineer's Estimate: a. in accordance wit .ndard Letter of Credit form (attached), b. from a local bank, c. with an expiration date, not beyond July 1, 201 . 5. ' ovide the associated Site Plan modifications ace- • - : - - ' to the exists . - - - .a Villas Site Plan ' - - . .er of parking spaces, requ -• end islands, relocated dumpsters, revised landscaping, etc.) q,k, 4 wgAA �S \AA\ Ft Note that full Building Permitsftuver require the'associated waterlines/hydrants be constructed, accepted and active and that there is adequate drive surface for fire trucks. Slab only permits may be considered by the Building Official prior to full Building Permit to also aid in project scheduling. . When the additional phase of Gateway Villas (adjacent to the detention pond) is constructed, this Semi-Permanent All-Weather Surface fire access drive must be removed or reworked to meet the Permanent All-Weather Pavement standards including curbing and either asphalt or concrete. inally, due to t - asso '• ed health and safet once sociated with fire acce _, e C. ificates of ccupancy fo he future bui .ings in Gatewa 'hase 4 will no se issued unti •e s . ect fire access roa. .• • •• . on is complete and a :- . ab - • . If .•e fire access is not construct-e ithin the ti -frame allotted on the a ciated Letter Cr- 't and the City has to t aw on the surety, an elated Certifica of Occupancy will be hel. ntil the City i . .le to complete construction . •- fir ccess. Please let us know how you would like to proceed. Best Regards, xxxxx Xxxxx Attachments Cc: xxxxx From: Alan Gibbs To: Childers, Terry; Hurt, Eric Date: 1/19/2007 5:23:38 PM Subject: Gateway Fire Access Terry/Eric, Attached is my draft letter and our LOC form. I was not certain how to have them sign or confirm they agree to all terms? Alan Gibbs, P.E. City of College Station Sr. Asst. City Engineer, Public Works Additional Site Plan Revisions 1 . Majority of units are going to be constructed as 3 bedroom units. For each building with 5 & 6 units, 2 of them will be 4 bedroom units. Totals as follows: 24 - 4 Bedroom Units; 54 - 3 Bedroom Units - Utility Demands & Parking Analysis were adjusted accordingly. The owner/developer has been working with Fire Services to obtain an acceptable secondary fire access to Gateway Phase 2. I have faxed the agreements between Phase 1 & Phase 2 property owners/managers regarding the secondary fire access to Phase 2 to Alan (12/01/06). Parkland Dedication Fee prior to building permit - Acknowledged Easement Dedication Sheet(s) & required documents were previously submitted with the Final Plat. Upon this final review of the site plan, I would like to be issued a development permit for earthwork & utility construction by December 11, 2006. Thanks. CITY OF COLLEGE STATION ... max..., Plasms 6 Der elopment Services 1101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 27,2006 TO: David Scarmardo,Brazos Gateway Place Development,Ltd.via fax# 979.822.1763 FROM: Crissy Hartl,Staff Planner SUBJECT: GATEWAY PH 4 (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1) revised site and landscaping plan. $Parkland Dedication fees prior to issuance of a building permit. Easement Dedication Sheet and required documents (as required). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Kling Engineering&Surveying via fax# 979.846.8252 Case file#06-00500254 Home of Texas A&M University TRANSMISSION VERIFICATION REPORT TIME : 11/27/2006 17:09 NAME . FAX . TEL . SER. # : 000L5J596800 DATE,TIME 11/27 17: 08 FAX NO./NAME 98221763 DURATION 00: 00: 23 PAGE(S) 02 RESULT OK MODE STANDARD ECM 1P11;11500r111111 4 1# ! f0!1111Ipp�ip.�k, CITY OF COLLEGE STATION Aoggai�t{1414. PZ 1��?� i 1rr& li1$!{$18 g1a '®;Bt:hrFxt nni sg d'Development Services aan' nz le»1aam;inv+C>zsmkAl• tang&gym' _ ,.r. mM,rostrii'Ia'" 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM • November 27,2006 TO: David Scarmardo,Brazos Gateway Place Development,Ltd.via fax #979.822.1763 FROM: Crissy Hard, Staff Planner SUBJECT: GATEWAY PH 4 (SP)- Site Plan Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review: One (1)revised site and landscaping plan. $ Parkland Dedication fees prior to issuance of a building permit. Easement Dedication Sheet and required documents (as required). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. TRANSMISSION VERIFICATION REPORT TIME : 11/27/2066 17: 10 NAME . FAX . TEL . SER. # : 868L5J596868 DATE,TIME 11/27 17: 69 FAX NO./NAME 98468252 DURATION 88:88: 22 PAGE(S) 02 RESULT OK MODE STANDARD ECM i#ItslbPE�311;I„ D' 11; CITY OF CoLI,EGr STATION �;.� rats! i�S'�IFiI erns n ,r� ,p,.>� Planning d'Devele prneret Services ,a ,.,.; , ,{�:dti�s.•n�t0. 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 27,2006 TO: David Scarmardo,Brazos Gateway Place Development,Ltd.via fax#979.822.1763 FROM: Crissy Hard,Staff Planner SUBJECT: GATEWAY PH 4 (SP)- Site Plan _ .. -- Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review. One (1)revised site and landscaping plan. $Parkland Dedication fees prior to issuance of a building permit. Easement Dedication Sheet and required documents (as required). Please note that the Easement Dedication Sheet and necessary documents are required prior to the issuance of a building permit. If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details. If you have any questions or need additional information, please call me at 979.764.3570. zq (11:*1,1144 CITY OF COLLEGE STATION February 1, 2007 David Scarmardo, President Brazos Gateway Place Development, Ltd. 1289 North Harvey Mitchell Parkway College Station, Texas 77803 Re: Gateway Phases 2 and 4 Subdivision—Fire Access Mr. Scarmardo, This letter follows our meeting regarding the subject fire access road requirement where we are proposing an alternative to help facilitate the continued progress of your development and cover the related health and safety concerns. Currently, there are 124 un-sprinkled, multi-family dwelling units in Gateway Villas located in Gateway Phase 2 Subdivision with only a single point of pedestrian and emergency vehicular traffic. Exceeding 100 un-sprinkled, multi-family dwelling units requires a second remote fire access road. Based on our discussions, the City will now issue Development Permits for full Site Plan on Phase 4 and to construct the secondary fire access to Phase 2. Additionally, the City will issue slab only permits for Phase 4. The secondary fire access will also serve a future phase of Villas north of the detention pond referred to as Phase 5. Full Building Permits for Phase 4 may be issued, provided that you: 1. Construct a 26 ft wide fire access road with adequate turning radii for ladder fire truck. In general, this pavement should be constructed to a semi-permanent standard. The Fire Marshall must acknowledge the construction is adequate, and he will allow a temporary limestone rock surface understanding that the road will have asphalt placed with Phase 5. If the semi-permanent surface is used, the six- inch curb is not required, and these areas must be gated or protected from public usage and signed for emergency access only. 2. Provide an engineer's as-built certification that the fire access road and underlying berm is structurally adequate to maintain a 75,000 lb fire truck. It is suggested to have a geotechnical analysis of the soils and the existing or required compaction effort necessary to achieve this. 3. Acknowledge that future Site Plan modifications to Phase 2 will be necessary to the existing Gateway Villas (Phase 2) Site Plan (i.e. number of parking spaces, required end islands, relocated dumpsters, revised landscaping, etc.). The modified Site Plan for Phase 2 will be required with the Phase 5 Site Plan and the associated Phase 2 site improvements will be required for Phase 5 Certificate of Occupancy. Additionally, when Phase 5 is constructed, this Semi-Permanent All- Weather Surface fire access drive must be removed or reworked to meet the Permanent All-Weather Pavement standards including curbing and either asphalt or concrete. Note that full Building Permits always require the associated waterlines/hydrants be constructed, accepted and active and that there is adequate drive surface for fire trucks. Slab only permits may be considered by the Building Official prior to full Building Permit to also aid in project scheduling. Please let us know how you would like to proceed. Best Regards, • Alan Gibbs, P.E. Sr. Asst. City Engineer Cc: Chuck Ellison Terry Childers Eric Hurt Lance Simms Chris Haver