Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 1 Project: AUTUMN CHASE FOURPLEX PH 3 (SP) —06-00500250 PLANNING 1. Are patio's being proposed into the setbacks? If they are just slabs that is ok? Please clarify. Reviewed by: Jennifer Reeves Date: November 17, 2006 MISCELLANEOUS 1. Irrigation system must be protected by either a Pressure Vacuum Breaker, a Reduced Pressure Principle Back Flow Device, or a Double-Check Back Flow Device, and installed as per City Ordinance 2394. 2. All BackFlow devices must be installed and tested upon installation as per City Ordinance 2394. ENGINEERING COMMENTS NO. 1 1. A detail is provided for inlet protection, but the symbol is not shown on the plan. Please indicate utilization of inlet protection. Reviewed by: Carol Cotter Date: November 17, 2006 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per city specs and design. 2. City will provide drawings for conduit installation. 3. Developer to intercept existing conduit at designated transformers and extend as required. 4. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 5. Developer installs secondary pedestals as per city specs and design. (secondary pedestals provided by the city). 6. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to sweido(c icstx.gov 7. To discuss any of the above electrical comments,please contact Sam Weido at 979.764.6314. Reviewed by: Sam Weido Date: November 22,2006 Sanitation Comments 1. Sanitation is ok with this project.. Reviewed by: Wally Urrutia Date: November 28,2006 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. P