CITY OF COLLEGE STATION
MEMORANDUM
August 13, 2007
TO: Don Lys, Britt Rice Construction, via dlysbriceco.net
FROM: Jason Schubert, Staff Planner
SUBJECT: AUDIO VIDEO ADDITION (SP)- Site Plan
Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments
and submit the following information for further staff review:
Seven (7) complete sets of construction documents for the proposed
development with the revised site plan attached (one set will be returned to you,
please submit additional copies if you want more than one approved set)
Two (2) revised site plans
One (1) 11x17 grading and erosion control plan
One (1) complete Development Permit Application
Other engineering documents as described in the comments.
Please note that the Easement Dedication Sheet and necessary documents are required prior
to the issuance of a building permit. If there are comments that you are not addressing with the
revised site plan, please attach a letter explaining the details. If you have any questions or need
additional information, please call me at 979.764.3570.
Attachments: Staff review comments
pc: ''/Gene Joyce, GJ Partners, Ltd, via fax 696.5775
Williamson Group Architects, via wilgrpRtxcyber.com
CSC Engineering, via rconlintxcyber.com
Case file #07-00500187
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 1 of 2
4
STAFF REVIEW COMMENTS NO. 1
Project: AUDIO VIDEO ADDITION (SP)— 07-00500187
PLANNING
1. Revise the owner information and zoning for the property to the northeast of the proposed
addition.
2. It appears that the area of the new addition is labeled as Concrete Drive. Please revise.
3. Provide a general note that 100% coverage of groundcover, decorative paving, decorative
rock, or a perennial grass is required in parking lot islands, swales and drainage areas, the
parking lot setback, rights-of-way, and adjacent property disturbed during construction.
4. As per conversation, please illustrate proposed sidewalk along the rear of the building.
5. Please note that prior to obtaining a Certificate of Occupancy for the proposed addition, the
buffer yard area along the northern property will be inspected for compliance with the
previously approved Landscape Plan.
6. With the existing buffer yard, the proposed building elevations are acceptable.
Reviewed by: Jason Schubert Date: August 13, 2007
ENGINEERING COMMENTS NO. 1
1. Please submit Development Permit and Fees.
2. Please submit erosion control plan.
3. Please submit fire flow report, specifically addressing the Fire Code Tables B105.1 and
C105.1.
4. Please submit drainage letter addressing the added flows from the addition and available
capacity in the existing system.
5. FYI — In response to Don Lys's off-site concerns from our July 26, 2007 meeting, I have put
River Ridge Townhomes on notice that they will need to place a retaining wall near their
southwest property corner abutting the Audio Video site with the construction of the final
phase of River Ridge Townhomes. The final phase of River Ridge Townhomes has
currently requested a development permit to begin construction activities. I would
recommend that the 2 parties coordinate construction activities to expedite the conflict
resolution.
Reviewed by: Josh Norton Date: August 10, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. No comments.
GENERAL ELECTRICAL COMMENTS
1. No Comments.
2. To discuss the above electrical comments please contact Gilbert Martinez at 979.764.6255.
Reviewed by: Gilbert Martinez Date: August 9, 2007
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: August 8, 2007
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal
letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a
completely new review. Page 2 of 2