HomeMy WebLinkAboutLetter of Completion egoi
LETTER OF COMPLETION
CITY ENGINEER DATE: 7 NOVEMBER 2007
CITY OF COLLEGE STATION
COLLEGE STATION,TEXAS
RE: COMPLETION OF
St. Joseph Urgent Care Center
Dear Sir:
The purpose of our letter is to request that the following listed improvements be
approved and accepted as being constructed under City inspection and completed
according to plans and specifications as approved and required by the City of College
Station,Texas, This approval and acceptance by the City is requested in order that we
may finalize any subcontracts and to affirm their warranty on the work. This approval
and acceptance by the City of the improvements listed below does hereby void the letter
of guarantee for the listed improvements on the above referenced project.
The one-year warranty is hereby affirmed and agreed to by Elliott Construction, LTD
and by their subcontractors as indicated by signatures below.
WORK COMPLETED WARRANTY DATE
16" and 8" Water Lines 11/15/2007
12" Sewer Lines 11/15/2007
St. Joseph Regional
Owner: Health Center Contractor: Elliott Construction,LTD
Phone Number: (979) 776-2495 Phone Number: (979) 690-7071
Address: Address:Franciscan Dr. Address: P.O. Box 510
Bryan, TX 77802 Wellborn, TX 77881
Signature& `'�L � Signature:,.0 �D
Scott Elliott, President
ACCEPT•NCE : APPROVAL
City Representative
City Engineer -Hsr k!a t.a:hs
Revised 1/3 1/07