Loading...
HomeMy WebLinkAboutLetter of Completion egoi LETTER OF COMPLETION CITY ENGINEER DATE: 7 NOVEMBER 2007 CITY OF COLLEGE STATION COLLEGE STATION,TEXAS RE: COMPLETION OF St. Joseph Urgent Care Center Dear Sir: The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station,Texas, This approval and acceptance by the City is requested in order that we may finalize any subcontracts and to affirm their warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one-year warranty is hereby affirmed and agreed to by Elliott Construction, LTD and by their subcontractors as indicated by signatures below. WORK COMPLETED WARRANTY DATE 16" and 8" Water Lines 11/15/2007 12" Sewer Lines 11/15/2007 St. Joseph Regional Owner: Health Center Contractor: Elliott Construction,LTD Phone Number: (979) 776-2495 Phone Number: (979) 690-7071 Address: Address:Franciscan Dr. Address: P.O. Box 510 Bryan, TX 77802 Wellborn, TX 77881 Signature& `'�L � Signature:,.0 �D Scott Elliott, President ACCEPT•NCE : APPROVAL City Representative City Engineer -Hsr k!a t.a:hs Revised 1/3 1/07