August 27, 2007
TO: Travis Martinek, Animate Habitat, LTD., via fax 846.1461
FROM: Jason Schubert, Staff Planner
SUBJECT: ANIMATE HABITAT PH.1 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. If all comments have been
addressed and the following information submitted by Tuesday, September 4, 2007, 10:00 a.m.,
your project will be placed on the next available Planning and Zoning Commission meeting
scheduled for, Thursday, September 20, 2007, 7:00 p.m. in the City Hall Council Chambers,
1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Seventeen (17) 11"x17" copies of the revised final plat;
Easement Dedication Sheet;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov.
Upon receipt of the required documents for the Planning & Zoning meeting, your project will be
considered formally filed with the City of College Station. Please note that if all comments have
not been addressed your project will not be scheduled for a Planning & Zoning Commission
meeting. Your project may be placed on a future agenda once all the revisions have been made
and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the
agenda and staff report can be accessed at the following web site on Monday the week of the
P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: A&M Super Storage, via ehkthr1(a msn.com
Mike McClure, McClure & Browne, Inc., via fax 693.2554
Case file #07-00500197
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 1 of 3
STAFF REVIEW COMMENTS NO. 1
Project: ANIMATE HABITAT PH.1 (FP) - 07-00500197
PLANNING
1. As submitted, a variance request will be necessary to Section 8-M of the Subdivision
Regulations for the sidewalk not being provided along SH 6. Please revise the preliminary
plat application (project 07-196) so that the variance request is not necessary or submit a
variance application with that application.
2. Please note that the proposed development is located within impact fee area 97-02B.
Reviewed by: Jason Schubert Date: August 27, 2007
ENGINEERING COMMENTS NO. 1
(Final Plat)
Please submit development permit and fees. I assume the construction documents
previously submitted on 8/9/07, were intended to support the above mentioned development
permit for the Animate Habitat, Phase 1, Lot 1, Block 1 Final Plat.
..e./ Please revise the overlap conflict with the proposed 30-ft PUE and the Pipeline Easement.
The City requires first right with all proposed PUE dedications.
ir Please revise "30' PDE" as this should be dedicated as a private drainage easement with
private ownership and maintenance.
," Please remove PDE (Public Drainage Easement)from notes.
/�"/" Please provide volume and page of the proposed off-site private drainage easement.
�• Please provide ownership and maintenance responsibilities for the proposed Private Access
Easement.
r. Please submit easement dedication application and all required supporting documentation
for the proposed off-site sanitary sewer extension.
(Construction Documents from 8/9/07 submittal)
1. (Sheet 3) It appears there is a valve missing from Inset A, please revise.
2. (Sheet 3)Water Line WA-1 needs an additional valve.
3. Please revise the proposed 10-ft PUE to a 15-ft PUE as the preliminary plat illustrates and
the design guidelines require due to the depth of the proposed sanitary sewer main.
4. Please submit letter of acknowledgement.
5. Please submit engineers cost estimate.
Reviewed by: Josh Norton Date: August 27, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 2 of 3
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull
boxes and secondary pedestals provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
breadcstx.qov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Brent Read at
979.764.5026.
Reviewed by: Brent Read Date: August 22, 2007
FIRE
1. No comment
Reviewed by: Steve Smith Date: August 22, 2007
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: August 21, 2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 3 of 3
CITY OF COLLEGE STATION
Planning dr Development Services
1101 Texas Avenue, P.O. Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
September 12, 2007
TO: Travis Martinek, Animate Habitat, LTD., via fax 846.1461
FROM: Jason Schubert, Staff Planner
SUBJECT: ANIMATE HABITAT PH.1 (FP) — Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. This item does not need to be
addressed prior approval of the Final Plat at the Planning & Zoning Commission meeting.
Please address the comments and submit the following information for further staff review:
One (1) complete set of revised construction documents
If you have any questions or need additional information, please call me at 979.764.3570.
Attachments: Staff review comments
cc: A&M Super Storage, via ehkthr1@msn.com
Mike McClure, McClure & Browne, Inc., via fax 693.2554
Case file #07-00500197
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 2
Project: ANIMATE HABITAT PH.1 (FP) - 07-00500197
ENGINEERING COMMENTS NO. 2
1. (Sheet 3) It appears the valve spacing on WA-1 exceeds the 800-ft maximum spacing
requirement, please revise.
Reviewed by: Josh Norton Date: September 6, 2007