MEMORANDUM
August 27, 2007
TO: Veronica Morgan, Mitchell & Morgan, LLP, vmitchellandmorqan.com
FROM: Jason Schubert, Staff Planner
SUBJECT: GATEWAY LOT 13 & 14 BLK 1 (FP-AMEND) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff
review comments detailing items that need to be addressed. Please address the comments and
submit the following information for further staff review and approval:
One (1) 24"x36" copy of the revised final plat;
Seventeen (17) 11"x17" copies of the revised final plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
sgriffin@cstx.gov.
If you have any questions or need additional information, please call Carol Cotter at
979.764.3570.
Attachments: Staff review comments
cc: Frank Mihalopolous, Gateway Six Partners, LTD, via frank(a corinthprop.com �f
Case file #07-00500199
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 1 of 2
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY LOT 13 & 14 BLK 1 (FP-AMEND) - 07-00500199
PLANNING
1. Please re-label lots 13 and 14 as 13A and 14A.
2. Please add a note that states Lots 13A and 14A are considered a single building plot.
Reviewed by: Jason Schubert Date: August 27, 2007
ENGINEERING COMMENTS NO. 1
1. The proposed 12" water line needs to be extended from the existing 12" line at this time, not
when Lot 13R develops.
2. There is a water line and fire hydrant at the eastern corner of property. Show conflict with
the proposed sewer line (Sheet 01).
3. Match soffits at MH 2 (Sheet 01).
4. Since the proposed 6" sewer line will not be extended, a cleanout can be installed instead of
a manhole.
5. Indicate sewer conflict with proposed 12" water line and any crossing requirements.
6. Clearly indicate the public and private portions of the water and sewer lines.
7. Fire suppression line needs to indicate isolation valve with lockable lid as indicated on the
Site Plan for NTB.
Reviewed by: Carol Cotter Date: August 29, 2007
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per City specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per City specs and design.
7. Developer installs pull boxes as per City specs and design (pull boxes provided by the City).
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to:
sweido@cstx.gov.
9. Developer provides load data for project.
10. To discuss any of the above electrical comments please contact Sam Weido at
979.764.6314.
Reviewed by: Sam Weido Date: 8-22-07
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: August 21, 2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 2 of 2
0
ENGINEERING COMMENTS NO. 2
1. The proposed construction will leave Home Depot without water for a period of time.
You will need to make arrangements during construction.
2. Indicate TCEQ crossing requirements (center joint of pipe).
Reviewed by: Carol Cotter Date: September 12, 2007