Loading...
HomeMy WebLinkAboutCorrespondence O-moi 44WQ 4.911)01 IPS Group 7m.. Planning Solutions June 26, 2007 Bridgette George,Development Coordinator City of College Station,Development Services 1101 Texas Avenue South College Station,Texas 77842 Re: Final Plat submittal for The Lofts,Wolf Pen Creek. Dear Bridgette, Attached please find the final plat submittal for The Lofts that is located at Dartmouth and Holleman in the Wolf Pen Creek zoning district. Along with the application and 14 copies of the plat,you will find the following supporting information: • Construction documents for Manuel Drive(2 copies); • Engineer's estimates for Manuel Drive; • Copy of the approved preliminary plat;and, • Engineer's certification re:the B/CS Design Guidelines. You will notice that the tax certificates are missing from the submittal. The computers at the Tax Office are down. We will provide the certificates as soon as possible. You will also notice that we only provided a copy of the approved preliminary plat. The reason is we need to make a correction to the one that was approved by the Planning&Zoning Commission. The preliminary plat was based on a survey prepared by David Mayo several years ago. Since that time, Kerr Surveying was hired to do the remaining survey work. When he verified the boundary,he found a slight discrepancy. That error is corrected on the preliminary plat. Once staff has reviewed the preliminary plat, we will provide the mylar original for your files. Please do not hesitate to call me at(979)846-9259 if you have any questions. Sincerely ata ie 1z, P Principal 511 University Drive East, Suite 211 College Station, TX 77840 979-846-9259 www.IPSGroup.us 07- 0 ( 4 irj° etiv,9401 V IPS Group vA kgrA Planning Solutions August 22, 2007 Bridgette George, Development Coordinator City of College Station, Development Services P. 0. Box 9960 College Station, TX 77841 RE: Submittal of a Right-of-Way Dedication for Dartmouth Drive as part of the mixed- use development of The Lofts,Wolf Pen Creek, Dear Bridgette, We are officially submitting the following information for your review and approval: • Right-of-Way Dedication for Dartmouth — As negotiated with City staff, we are submitting the 5' right-of-way dedication information along Dartmouth. Please let me know if you have any questions or need additional information. Thank you! Sincerely a ie Thomas Ruiz, AICP Principal Attachments: Easement Dedication Sheet for a 5'ROW dedication for Dartmouth 511 University Drive East, Suite 211 College Station, TX 77840 979-846-9259 www.IPSGroup.us i7-col 01-611-001 WIN ISO PS GroupIVA' /92. .A.7:1. Planning Solutions September 4, 2007 Jason Schubert, Staff Planner City of College Station, Development Services 1101 Texas Avenue College Station, TX 77840 Re: The Lofts, Wolf Pen Creek Final Plat scheduled for 1382 on September 20, 2007. As requested, we are submitting the following for consideration by the Planning & Zoning Commission on September 20, 2007: One (1) 24" xx 36" copy of the revised Final Plat; and Seventeen (14) 11" x 17" copies of the revised Final Plat. If you have any questions please feel free to call me. Sincerely Natali Ruiz, AICP Principal, IPS Group Attachments: Revised Final Plat Response to Staff Comments cc: Mark Lindley, Asset Plus Companies, via mlindley(cr�assetpluscorp.com Barrett Kirk, Asset Plus Companies, via bkirk(a�assetpluscorp.com Veronica Morgan, Mitchell & Morgan, LLP, via v(a�mitchellandmorgan.com Case file#07-00500153 511 University Drive East, Suite 211 College Station, TX 77840 979-846-9259 www.IPSGroup.us E-mail Correspondence From: Jason Schubert To: Natalie@ipsgroup.us CC: bkirk@assetpluscorp.com; mlindley@assetpluscorp.com; v@mitchellandmorgan.com Date: 9/20/2007 4:26 PM Subject: REVISED Staff Review Comments for The Lofts at Wolf Pen Creek Attachments: The Lofts @ WPC review comment2.DOC Natalie, As I have mentioned to you earlier today, our Legal Department has asked that the plat show a 50' ROW dedication for Manuel Drive with an additional 5'shown as proposed on each side. This is in connection with your pending Oversize Participation request. I have added this and another minor item to the Staff Review Comments going to tonight's Planning&Zoning Commission meeting. Again,these items can be addressed when the mylar is submitted. Let me know if you have any questions. Jason Jason Schubert Staff Planner Planning& Development Services City of College Station Phone: 979.764.3570 Fax: 979.764.3496 From: "Natalie"<natalie@ipsgroup.us> To: "'Jason Schubert"'<Jschubert@cstx.gov> Date: 9/21/2007 10:28 AM Subject: RE: REVISED Staff Review Comments for The Lofts at Wolf Pen Creek Hey Jason, Once the O.P. is approved,we'll be able to remove the 5'shown on each side of Manuel and simply leave it as we had it, right? Natalie Thomas Ruiz,AICP IPS Group, Planning Solutions 511 University Drive, Suite 211 College Station,TX 77840 Office (979) 846-9259 Mobile (979)229-6797 www.ipsgroup.us