Loading...
HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 3 Project: CALLAWAY VILLAS BUS STOP (PIP) -06-00500239 PLANNING 1. Per Section 7.1. Features Allowed Within the Required Yards (M) Bus stops that offer shelter from the elements. Such shelters may be located within a front or side street setback. Planning is ok with this location. Reviewed by:Jennifer Reeves Date: February 5,2007 ENGINEERING 1. Please provide the indemnity and estimate the cost to remove the bus stop. Once reviewed and agree with the amount you then will need to provide that amount in cash. Reviewed by:Alan Gibbs Date: February 11,2007 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 STAFF REVIEW COMMENTS NO.3 Project: CALLAWAY VILLAS BUS STOP (PIP) -06-00500239 PLANNING 1. Per Section 7.1. Features Allowed Within the Required Yards (M) Bus stops that offer shelter from the elements. Such shelters may be located within a front or side street setback. Planning is ok with this location. Reviewed by:Jennifer Reeves Date: February 5, 2007 ENGINEERING 1. Please provide the indemnity and estimate the cost to remove the bus stop.Once reviewed and agree with the amount you then will need to provide that amount in cash. Reviewed by:Alan Gibbs Date: February 11, 2007 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 STAFF REVIEW COMMENTS NO. 2 Project: CALLAWAY VILLAS BUS STOP (PIP) - 06-00500239 (Staff needs the following information for further staff review.The following comments are repeat comments from the first review) PLANNING 1. Please provide on the site plan all existing utilities and easements clearly identifying size, type and location.We have concerns about the proximity of the structures in reference to an existing water line. 2. Please show on the site plan a scaled drawing of the proposed structures. 3. (FYI) It appears that the proposed bus stops may be more appropriate set back in the parking islands. Reviewed by:Jennifer Reeves Date: December 20, 2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 Z 3o Z •mareas mau Ajalajdwo a alnlgsuoa j[tm`610 agi o1 mo paiuiod uaaq lou aneq lege suejd asap uo sArega jeuotnppr,fug•suejd moA uo„pajggnq„pue sauaj jeiiuusuezi lxau snoA ur paun:jdxa.aq isnu7`uopels a8ajjoj;o A1cj agi Aq paisanbas uaaq 1011 aneq regi`sueid ag1 01 apeui saFuega Au/ :gypjsj • 900Z'LI zaquranoN :a;BQ sanaag zajruua f:Aq pamatnaI •spuefsr 2uppud ata ur 3puq las aluudozddr azou!aq Atuu sdo;s snq pasodozd aqp ruts sztadde (jxq) •£ •saznpnzis pasodozd atp jo S'urmrzp pa'eas u utid a;is atp uo mots aszaid •aulf zalem 2upsrxa ur o;aauazapaz ut saznaanz;s atp jo kruiixozd at;lnoqu suzaauoa anet •uoptaof put adA `azls &u!Aji uapr A'zrap s;uaurasta put sapip n &upsrxa IIu ueid airs atp uo apinozd asta'd DNINI\IV'Id :(marnaz zaipzn3 zoj paa;ruzgns uofruZzoJur 2urmof'oJ at; paau firm am ;! alunitna (D; snq a;tprputa t Si ;i anarfaq lou op am`Arm-jo-1142rz ay u!I!2utar'd ansznd ;uem Tips noA 31 snip alupounuoaat pfnom spur's!pua at; szraddt;I •Arm jo-;t2iz put;uaurasta ate apislno a;rs znoA uo paveDo'aq sdo;s snq atp gulp zajazd pinom am) 6£Z00S00-90- (dId) aOIS Sflg SVTIIA AVA1V'TTVD :;aafozd SINHICAIOD iikaina2I 33V,IS 0 0 STAFF REVIEW COMMENTS NO. 2 Project: CALLAWAY VILLAS BUS STOP (PIP) -06-00500239 (Staff needs the following information for further staff review. The following comments are repeat comments from the first review) PLANNING 1. Please provide on the site plan all existing utilities and easements clearly identifying size, type and location. We have concerns about the proximity of the structures in reference to an existing water line. 2. Please show on the site plan a scaled drawing of the proposed structures. 3. (FYI) It appears that the proposed bus stops may be more appropriate set back in the parking islands. Reviewed by:Jennifer Reeves Date: December 20,2006 � c h . tee 5 , I 2 lCl 522 Q -") � NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2 STAFF REVIEW COMMENTS NO. 2 Project: CALLAWAY VILLAS BUS STOP (PIP) - 06-00500239 (Staff needs the following information for further staff review.The following comments are repeat comments from the first review) PLANNING 1. Please provide on the site plan all existing utilities and easements clearly identifying size, type and location. We have concerns about the proximity of the structures in reference to an existing water line. 2. Please show on the site plan a scaled drawing of the proposed structures. 3. (FYI) It appears that the proposed bus stops may be more appropriate set back in the parking islands. Reviewed by:Jennifer Reeves Date: December 20,2006 NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 2