HomeMy WebLinkAboutStaff Comments Response to Staff Review Comments (dated 10/9/2007& 10/12/2007) Castle Rock Subdivision, Phase 2A Final Plat PLANNING: 1. Noted. 2. The Easement Dedication application for the temporary access easement for the temporary turnaround is included with this resubmission. 3. Noted. ENGINEERING COMMENTS NO. 1: 1. The temporary access easement application is included with this resubmission. 2. Noted. 3. Noted. All Electrical comments have been noted. ENGINEERING COMMENTS NO. 2: 1. A detail for HDPE pipe trench backfill has been added to the drawings. 2. Yes, the blanket easement is still in effect. 3. Noted. CITY OF COLLEGE STATION Planning er Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 12, 2007 TO: Greens Prairie Investors, LLC, via fax 690.1041 FROM: Bridgette George, Development Coordinator SUBJECT: Engineering Document Comments for Castle Rock Ph. 2A Staff reviewed the above-mentioned engineering documents as requested. The following is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information for further staff review and approval of the plans: Three (3) sets of revised construction documents plus any additional sets you would like stamped and returned. If you have any questions or need additional information, please call Carol Cotter or myself at 979.764.3570. Attachments: Staff review comments pc: Joe Schultz, P.E., Civil Development, Ltd., via fax 764.7759 Case File No. 07-500230 ENGINEERING COMMENTS NO. 2 1. Our detail D3-02 may be a little confusing when applying to HDPE pipe. Cement stabilized backfill is required. 2. Verify that a blanket easement still covers the property. 3. Subdivision is located in Sewer Impact Fee Area 97-01 (Spring Creek). Current impact fees in this area are $349.55/LUE and are due at time of building permit. Reviewed by: Carol Cotter Date: October 10, 2007 (cirffisq44 Planning & Development Services 1101 Texas Avenue, P.O. Box 9960 College Station, Texas 77842 CITY OF COLLEGE STATION Phone 979.764.3570/ Fax 979.764.3496 MEMORANDUM October 9, 2007 TO: Greens Prairie Investors, LLC via fax 690.1041 FROM: Molly Hitchcock, Planning Administrator SUBJECT: CASTLEROCK PH 2A - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, 22 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for November 1, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Nineteen (19) 11"x17" copies of the revised final plat; Easement Dedication Sheet for Temporary Turnaround; One (1) Mylar original of the revised final plat (required after P&Z approval); and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov. Upon receipt of the required documents for the Planning & Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning & Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481 Please note that a Mylar original of the revised final plat will be required after P&Z approval and prior to the filing of the plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Joe Shultz, PE via fax 764.7759 Case file #07-00500230 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 1 Project: CASTLEROCK PH 2A - 07-00500230 PLANNING 1. Please note that any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that the City has not been made aware of will constitute a completely new review. 2. A temporary turnaround is required at (specific location) for Fire and Sanitation services: • An Easement Dedication Sheet and all necessary attachments must be submitted for review prior to the final plat being scheduled for a P&Z meeting; • The Temporary Turnaround Easement must be filed at the courthouse and the recording information included on the Final Plat prior to the plat being filed at the courthouse. 3. The construction documents and reports are still under review and may affect the plat. Reviewed by: Molly Hitchcock and Jeffrey Missal Date: October 9, 2007 ENGINEERING COMMENTS NO. 1 1. As shown, the temporary access easement is not dedicated with this plat. It is preferable that it be dedicated by separate instrument so that it is easier to abandon/remove when no longer needed. 2. Please make sure that you are not negatively impacting the Conservation Easement with this increase in discharge. 3. Construction plans and reports are still under review. Reviewed by: Carol Cotter Date: October 8, 2007 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. Developer provides temporary blanket easement for construction purposes. 2. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per City specs and design. 2. City will provide drawings for conduit installation. 3. Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. 4. Developer to intercept existing conduit at designated transformers and extend as required. 5. If conduit does not exist at designated transformer, developer to furnish and install conduit as shown on electrical layout. 6. Developer pours transformer pad(s) per City specs and design. 7. Developer installs pull boxes and secondary pedestals as per City specs and design (pull boxes and secondary pedestals provided by the City). 8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan. Email to bread@cstx.gov. 9. Developer provides load data for project. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 2 of 3 10. To discuss any of the above electrical comments please contact Brent Read at 979.764.5026. Reviewed by: Brent Read Date: October 3, 2007 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 3 of 3