1. Please submit sanitary sewer report verifying available capacity. There is some concern
regarding the ability to extend this 6-in system further and sewer a greater sewer shed,
please explain. This report was not found in the last (2) submittal.
2. The construction documents (profiles) for the storm sewer crossing Los Portales Drive
near Turbinella Way, the Alley, and Chinkapin Trail South as well as from these
intersections down Los Portales Drive toward the Detention Pond were not submitted.
Please include structural backfill for all portions which cross paved areas
3. Please provide structural backfill for the portion of storm sewer that crossed Chinkapin
Trail South.
4. Please provide detail and a description of how the drainage gets from Oakland
Ridge Phase 1 to the detention pond.
5. Please provide detail in the grading plan for removal of silt from the detention pond, as
the silt may cause the pond to not operate as designed.
6. The construction documents (profiles) for the water main down the second half of
Chinkapin Trail South toward Las Portales Drive and from this intersection back toward
Las Palomas Subdivision were not submitted.
7. The construction document details submitted with this last submittal are not the up to
date versions. Please include the latest version of water, sewer, streets, sidewalks, and
drainage from bcsunited.net.
8. Please provide verification from Brazos County (Gary Arnold) that all issues have been
addressed.
Reviewed by: Josh Norton Date: February 1, 2008
STAFF REVIEW COMMENTS NO. 3
Project: OAKLAND RIDGE PH 1 (FP) - 06-00500225
PLANNING
1. Please add a note specifying that the private landscape easement will be maintained by a
Homeowner's Association.
2. The construction documents and reports are still under review and comments will be
returned to you soon.
Reviewed by: Crissy Hartl and Josh Norton Date: October 23, 2007
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter and "bubbled"on your plans. Any additional changes on these plans
that have not been pointed out to the City,will constitute a completely new review. 2 of 2
STAFF REVIEW COMMENTS
Project: OAKLAND RIDGE PH 1 (FP): 06-00500225
STAFF REVIEW COMMENTS NO. 3 (FINAL PLAT)
1. The final plat and construction documents are currently under review by the County and
comments will be returned as soon as possible.
2. Why has the BTU easement illustrated on the Preliminary Plat been left off the Final
Plat?
3. Please define ownership and maintenance responsibilities of the landscape buffer.
4. Please revise note 10 as the "alleys" are not considered right-of-way.
5. It appears the intent of the Phase 1 development of Oakland Ridge is to connect Los
Portales drive from Oakland Ridge to Las Palomas? This street extension as well as the
adjacent detention pond should be included on the Phase 1 Final Plat.
6. Upon re-submittal please include a response letter addressing each staff review
comment for the final plat.
ENGINEERING COMMENTS NO. 3 (Construction Documents)
1. Please submit an updated engineer's cost estimate for the sanitary sewer infrastructure
improvements.
2. Please submit grading and erosion control plan.
3. Please submit sanitary sewer report verifying available capacity. There is some concern
regarding the ability to extend this 6-in system further and sewer a greater sewer shed,
please explain.
4. How does the drainage get from Oakland Ridge to the detention pond, there appears to
be a disconnect between the two, please explain.
5. Please provide documentation from Citgo allowing for the utilities and easements
throughout these plans to cross the gas line/easement.
6. Please provide documentation for the 20-ft BTU Easement abandonment.
7. The construction documents (plan and profile) for streets, drainage, water, and sanitary
sewer for Chinkapin Trail South were not submitted.
8. Please provide profile detail of the water main extension toward the Kemp Tract adjacent
to Los Portales Drive..
9. Please provide profile detail of the sanitary sewer extension across Los Portales Drive
adjacent to Turbinella Way.
10. The construction documents (plan and profile) for water for Chinkapin Trail South were
not submitted.
11. The construction documents (plan and profile) for water for Jones-Butler were not
submitted.
12. The construction documents (plan and profile) for water Las Portales were not
submitted. This is the portion that connects the water system to Las Palomas.
13. (Sheet SD2) Please provide structural backfill for the portion of storm sewer that crosses
Chinkapin Trail North.
14. (Sheet SD4) Please provide structural backfill for the portion of storm sewer that crossed
Turbinella Way.
15. (Sheet SD4) It appears the valve spacing on the water main exceeds the 800-ft
requirement, please illustrate in profile view.
16. (Sheet SD5) Where is the profile view of the portion of the storm main crossing Los
Portales Drive after JB#2 to IB#5 to IB#7?
17. (Sheet SD5) Please provide structural backfill for the portion of storm sewer that crossed
Los Portales Drive and Turbinella Drive.
18. (Sheet SD5) Please identify the sanitary sewer main and water main in profile view, as
they cross Los Portales Drive.
19. (Sheet SD5)Where is the profile detail for the storm main past IB#7.
20. (Sheet SD6) In places where the storm main is under "structural" areas, structural
backfill must be used.
21. (Sheet SD6) Where is the profile detail for the storm main as is comes across Los
Portales Drive, as is comes off Chinkapin Trail South.
22. (Sheet SIA) Please provide detail of water/sanitary sewer conflict and verify that the
conflict meets TCEQ.
23. (Drainage Report) Please clarify how this developments storm drainage is reaching the
existing detention pond?
24. (Drainage Report) Does the existing pond still maintain its original design capacity or has
silt decreased this capacity? This should be addressed in the grading plan if necessary.
25. (Drainage Report) Will the down stream property owners from the detention pond be
receiving more storm water post development?
26. (Drainage Report) Will any down stream property owners be receiving more storm water
post development?
27. (Drainage Report) Please provide a table comparing the pre development flows and the
post development flows leaving the detention pond.
28. (Drainage Report) Please provide a drainage area map and explain how each area is
performing in pre (Q) conditions and post (Q) conditions. The detention pond should be
taken into account in this post condition analysis.
29. Upon re-submittal please include a response letter addressing each staff review
comment for the construction documents.
Reviewed by: Crissy Hartl & Josh Norton Date: August 30, 2007
BTU Comments
A. I see where the lots are too small to accommodate a 20' easement along the interior lot
lines as in my note 1.
A. In my opinion, note 11 does not belong on the final plat. That will be addressed outside
/ of the platting process.
4 The word "and" in Note 12 should be "all" and the word easement should be plural.
., On B10, L16, the 20' PUE arrow points to the 25' BL. It should look more like B9, L14.
5,/Are the alley commons area and the commons area (median) being dedicated as
ROW? We may need to utilize them.
lam' How does the PUE work in the rear of B10, L1 along Jones Butler? It looks disjointed.
Same for the 20' PUE along the fronts of B10, L1-4 and B1, L1-4.
/7. As an FYI, all padmount transformers and switchgear will be placed along an all weather
� roads—typically along the front of the lots. Ideally it will be away from all driveways.
8. As always, Line Design needs at least 150 days notice before power is needed to the
subdivision so materials can be ordered. 979-821-5715.
Reviewed by: Randy Trimble Date: September 2, 2007
STAFF REVIEW COMMENTS
Project: OAKLAND RIDGE PH 1 (FP): 06-00500225
STAFF REVIEW COMMENTS NO. 3 (FINAL PLAT)
1. The final plat and construction documents are currently under review by the County and
BTU and comments will be returned as soon as possible.
2. Why has the BTU easement illustrated on the Preliminary Plat been left off the Final
Plat?
3. Please define ownership and maintenance responsibilities of the landscape buffer.
4. Please revise note 10 as the "alleys" are not considered right-of-way.
5. It appears the intent of the Phase 1 development of Oakland Ridge is to connect Los
Portales drive from Oakland Ridge to Las Palomas? This street extension as well as the
adjacent detention pond should be included on the Phase 1 Final Plat.
6. Upon re-submittal please include a response letter addressing each staff review
comment for the final plat.
ENGINEERING COMMENTS NO. 3 (Construction Documents)
1. Please submit an updated engineer's cost estimate for the sanitary sewer infrastructure
improvements.
2. Please submit grading and erosion control plan.
3. Please submit sanitary sewer report verifying available capacity. There is some concern
regarding the ability to extend this 6-in system further and sewer a greater sewer shed,
please explain.
4. How does the drainage get from Oakland Ridge to the detention pond, there appears to
be a disconnect between the two, please explain.
5. Please provide documentation from Citgo allowing for the utilities and easements
throughout these plans to cross the gas line/easement.
6. Please provide documentation for the 20-ft BTU Easement abandonment.
7. The construction documents (plan and profile) for streets, drainage, water, and sanitary
sewer for Chinkapin Trail South were not submitted.
8. Please provide profile detail of the water main extension toward the Kemp Tract adjacent
to Los Portales Drive..
9. Please provide profile detail of the sanitary sewer extension across Los Portales Drive
adjacent to Turbinella Way.
10. The construction documents (plan and profile) for water for Chinkapin Trail South were
not submitted.
11. The construction documents (plan and profile) for water for Jones-Butler were not
submitted.
12. The construction documents (plan and profile) for water Las Portales were not
submitted. This is the portion that connects the water system to Las Palomas.
13. (Sheet SD2) Please provide structural backfill for the portion of storm sewer that crosses
Chinkapin Trail North.
14. (Sheet SD4) Please provide structural backfill for the portion of storm sewer that crossed
Turbinella Way.
15. (Sheet SD4) It appears the valve spacing on the water main exceeds the 800-ft
requirement, please illustrate in profile view.
16. (Sheet SD5) Where is the profile view of the portion of the storm main crossing Los
Portales Drive after JB#2 to IB#5 to IB#7?
17. (Sheet SD5) Please provide structural backfill for the portion of storm sewer that crossed
Los Portales Drive and Turbinella Drive.
18. (Sheet SD5) Please identify the sanitary sewer main and water main in profile view, as
they cross Los Portales Drive.
19. (Sheet SD5)Where is the profile detail for the storm main past IB#7.
20. (Sheet SD6) In places where the storm main is under "structural" areas, structural
backfill must be used.
21. (Sheet SD6) Where is the profile detail for the storm main as is comes across Los
Portales Drive, as is comes off Chinkapin Trail South.
22. (Sheet S1A) Please provide detail of water/sanitary sewer conflict and verify that the
conflict meets TCEQ.
23. (Drainage Report) Please clarify how this developments storm drainage is reaching the
existing detention pond?
24. (Drainage Report) Does the existing pond still maintain its original design capacity or has
silt decreased this capacity? This should be addressed in the grading plan if necessary.
25. (Drainage Report) Will the down stream property owners from the detention pond be
receiving more storm water post development?
26. (Drainage Report) Will any down stream property owners be receiving more storm water
post development?
27. (Drainage Report) Please provide a table comparing the pre development flows and the
post development flows leaving the detention pond.
28. (Drainage Report) Please provide a drainage area map and explain how each area is
performing in pre (Q) conditions and post (Q) conditions. The detention pond should be
taken into account in this post condition analysis.
29. Upon re-submittal please include a response letter addressing each staff review
comment for the construction documents.
Reviewed by: Crissy Hartl & Josh Norton Date: August 30, 2007
STAFF REVIEW COMMENTS NO. 2
Project: OAKLAND RIDGE PH 1 (FP) - 06-00500225
PLANNING
1. Please submit 13 copies of the revised final plat that addressed both the first and second sets of
comments so that we may distribute them among the appropriate departments and entities for
their review.
Reviewed by: Crissy Hard Date: June 13, 2007
ENGINEERING COMMENTS NO. 1(Construction Documents)
1. Included is the first set of Oakland Ridge Phase 1 final plat comments, please revise the Phase 1 Final
Plat and submit with the revised construction documents and reports. Upon receiving the re-submittal of
the final plat and construction documents/report the final plat will be preliminarily scheduled for a P&Z
meeting.
2. Upon making the below correction please submit (4) complete sets of construction documents and
reports to be distributed to Brazos County, BTU, City of College Station Utilities, and City of College
Station P&DS.
3. Approval of the streets and drainage portion of this subdivision is the purview of Brazos County.
4. It appears you still need a variance from Brazos County to be able to locate sidewalks within the right-of-
way.
5. It appears you still need a variance from Brazos County to be able to locate the drainage/storm
infrastructure within the right-of-way.
6. Although Brazos County is allowing the 20-ft alley to be built, they are not accepting the 24-ft right-of-
way dedication. The pavement and "right-of-way" needs to be dedicated and maintained to and by the
HOA,and should not be called a right-of-way but a HOA or common area. Please revise on the plat and
construction documents.
7. Brazos County requires that all utility service lines under pavement must be sleeved.
8. The following notes explaining maintenance responsibilities should be placed on the final plat and
construction documents:
a. If Brazos County does allow for the drainage/storm infrastructure to be placed in their right-of-way,
they should be maintained by the HOA.
b. The water infrastructure should be maintained by Wellborn water. Wellborn water is responsible for
all domestic and fire flows to this subdivision.
c. The alleys should be maintained by HOA.
d. The sanitary sewer infrastructure should be maintained by the City of College Station pending
acceptance and appropriate warranty periods.
e. Common areas including medians should be maintained by HOA.
f. The sidewalks should be maintain by the HOA
9. Please submit Letter of Acknowledgement found on bcsunited.net.
10. Please submit grading and erosion control plan.
11. Please submit sanitary sewer report verifying available capacity. There is some concern regarding the
ability to extend this 6-in system further and sewer a greater sewer shed,please explain.
Home of Texas A&M University
12. Please be aware that the BCS Design Guidelines require that fire flow tests be performed once the
infrastructure has been completed to verify that the hydrant/system meets minimum requirements.
13. How does the drainage get from Oakland Ridge to the detention pond, there appears to be a disconnect
between the two.
14. Please provides a summary of the contract with Wellborn and explain the significance to this project.
Please use the exhibit provided on the last page of the fire flow report as to describe what portions of
water line are being built by who (ie. 12-in main, 8-in main,etc.)
15. Please provide documentation from Citgo allowing for the utilities and easements throughout these plans
to cross the gas line/easement.
16. Please provide documentation for the 20-ft BTU Easement abandonment.
17. Please number the storm main junction and inlet boxes in plan and profile.
18. I assume the water main profiles are supposed to be on sheets SD1 thru SD6 tided "Street & Drainage
Improvements".
19. Please provide all of the BCS Unified Design Details,including water and sewer details.
20. (Street and Drainage) It appears in the construction documents that the following were not submitted:
a. Street and Drainage for Chinkapin Trail South-plan and profile missing.
21. (Water Line) It appears in the construction documents that the following were not submitted:
b. Water line for Chinkapin Trail South-plan and profile missing.
c. Water line for Jones-Butler—plan and profile missing.
d. Water line for Turbinella Way—profile missing.
e. Water line for Las Portales—profile missing.
22. (Sheet SD1) Please provide detail of valve placement in profile view as done in plan view.
23. (Sheet SD1) Please provide detail of water/sanitary sewer conflict and verify that the conflict meets
TCEQ.
24. (Sheet SD1) Minimum bury should be 4-ft for all portions of the water main.
25. (Sheet SDI) Please illustrate the fire hydrant in profile view.
26. (Sheet SD2) In places where the water and storm main are under "structural" areas, structural backfill
must be used.
27. (Sheet SD2)Minimum bury should be 4-ft for all portions of the water main.
28. (Sheet SD3) Please provide detail of water/sanitary sewer conflict and verify that the conflict meets
TCEQ.
29. (Sheet SD3) In places where the water main is under"structural" areas, structural backfill must be used.
30. (Sheet SD4) In places where the water and storm main are under "structural" areas, structural backfill
must be used.
31. (Sheet SD4)Where is the profile view of the portion of the storm main crossing Los Portales Drive after
JB#2 to IB#5?
32. (Sheet SD4) It appears the valve spacing on the water main exceeds the 800-ft requirement.
33. (Sheet SD5) In places where the storm main is under"structural"areas, structural backfill must be used.
34. (Sheet SD5) Please identify the water and sanitary sewer main in profile view, as they cross Los Portales
Drive.
35. (Sheet SD5)Where is the profile detail for the storm main past IB#7.
36. (Sheet SD6) In places where the storm main is under"structural" areas, structural backfill must be used.
37. (Sheet SD6) Please identify the water and sanitary sewer main in profile view, as they cross Los Portales
Drive.
Home of Texas A&M University
38. (Sheet SD6) Where is the profile detail for the storm main as is comes across Los Portales Drive, as is
comes off Chinkapin Trail South.
39. (Sheet SD6)Where is the profile detail for the storm main past IB#7.
40. (Sheet S1A thru S4B) Please verify that none of the sanitary sewer service lead terminations exceed the
3.5-ft maximum depth requirement per the BCS Design Guidelines.
41. (Sheet S1A thru S4B)The minimum slope for a 6-in sanitary sewer main is .80%.
42. (Sheet SIA) Please provide detail of water/sanitary sewer conflict and verify that the conflict meets
TCEQ.
43. (Sheet SIA) In places where the sanitary sewer main is under "structural" areas, structural backfill must
be used.
44. (Sheet SIB) In places where the sanitary sewer main is under "structural" areas, structural backfill must
be used.
45. (Sheet S1B) Please provide profile detail for the sanitary sewer main extension across Los Portales Drive.
Dead ends require the extension of at least one section of pipe with a cleanout or manhole.
46. (Sheet SIC) In places where the sanitary sewer main is under "structural" areas, structural backfill must
be used.
47. (Sheet SIC) Please move manhole#6 outside of the pavement of the private alley.
48. (Sheet S1C) Please revise manhole#6 in profile.
49. (Sheet SID) Please provide detail of water/sanitary sewer conflict and verify that the conflict meets
TCEQ.
50. (Sheet S1D) In places where the sanitary sewer main is under "structural" areas, structural backfill must
be used.
51. (Sheet S1D) Please revise manhole #9.
52. (Sheet S2) In places where the sanitary sewer main is under "structural" areas, structural backfill must be
used.
53. (Sheet S3) Please provide detail of water/sanitary sewer conflict and verify that the conflict meets TCEQ.
54. (Sheet S3) In places where the sanitary sewer main is under "structural" areas, structural backfill must be
used.
55. (Sheet S3)What is the slope on line"S-5"?
56. (Sheet S4A) Please provide detail of water/sanitary sewer conflict and verify that the conflict meets
TCEQ.
57. (Sheet S4A) In places where the sanitary sewer main is under "structural" areas, structural backfill must
be used.
58. In addition to the following standard comments, if more than 5 acres will be disturbed during
construction of this project a NOI must be filed with the state and a copy provided to the CoCS. Storm
water management requirements are as follows, any questions may be directed to Donnie Willis, CoCS
Drainage Inspector, at 979-764-6375:
Storm \\ater lDischarges from Small ( onsnruction \ctiv iiics
The Texas Commission on Environmental Quality has issued a general permit for construction activities
under the Texas Pollution Discharge Elimination System.The general permit (TXR150000) is for
construction activities disturbing at least 1 but less than 5 acres or is part of a common plan of development
disturbing at least 1 but less than 5 acres.
You will need to follow these steps to discharge storm water from your construction site to the City of
College Station's Municipal Separate Storm Water Sewer System (MS4):
Home of Texas A&M University
1. Read the general permit(TXR150000) to make sure it applies to your situation.
2. Adhere to the requirements of the general permit(TXR150000).
3. Prepare and implement a Storm Water Pollution Prevention Plan in accordance with Part III of the
general permit(1'XR150000).
4. Sign and post a construction site notice.
5. At least 2 days before beginning construction,provide a copy of the site notice to the operator of any
Municipal Separate Storm Water Sewer System (MS4) into which storm water will be discharged.
A MS4s include streets, channels,gutters, ditches or anything else that is publicly owned,designed or used to
collect or transport storm water.
As long as you meet the conditions of this general permit,you are authorized to discharge storm water.
No notice of intent(NOI),notice of termination (NOT), or fee is required under this option—as long as the
requirements of this general permit are followed.
This particular general permit will expire at midnight on March 5,2008.
A copy of General Permit TXR150000 can be obtained from TCEQ at:
http/www.tceq.s tate.tx.us/assets/public/permitting/waterquality/attachments/s tormwater/txr 150000.p df
A copy of the construction site notice can be obtained from TCEQ at:
http/www.tceq.state.tx.us/as sets/public/permitting/waterquality/attachments/stormwater/txr152d2.pdf
Reviewed by: Josh Norton Date: June 12,2007
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: OAKLAND RIDGE PH 1 (FP) - 06-00500225
**The County has not provided comments for this project yet. County comments may result
in additional City comments.**
PLANNING
1. Please provide documentation of County approval for this project and any variances associated
with this project.
2. The owner information for the property to the north has been duplicated and it looks like there
are two properties. Please remove one of the labels and the dashed line.
3. It is not necessary to provide the lot areas for all of the lots. Please remove all tables.
4. Please be sure not to include the"Seal"label on the mylar.
Reviewed by: Crissy Hartl Date: October 23, 2006
BTU COMMENTS
1. Need to show a note granting a 20' electric easement or PUE centered on all interior lot lines.
2. Need to show a note granting a 20'PUE along outer perimeter of development. A 16'PUE
along all public ROW is sufficient.
0Need to show a note using the following language granting a "5'wide easement for anchors and
guy wires necessary to help support overhead utility lines. Easement will extend 20'beyond any
utility easement.
4. All existing electrical lines need to be shown on each plat.Also show the volume and page
number of any electric line easements.
5. Please call BTU Line Design at 821-5770 at least 150 days before power is needed to begin the
process for providing power to the area.
6. Note 3 should read"Electrical service for this subdivision shall be by Bryan Texas Utilities."
Reviewed by: Randy Trimble Date: October 18,2003
ENGINEERING COMMENTS NO. 1
1. Please allow more time for the County to make comments; however, the following issues
need to be addressed and may require variances:
a. Lot size less than 1 acre
b. Lot width less than 70-ft
c. ROW width less then 70-ft
d. Provide 10-ft PUE for side lot lines
e. Alley width and ROW
2. It appears that the metes and bounds of this plat do not close,please revise.
3. Please submit drainage report.
4. Please submit fire flow report and analysis. The fire flow report and analysis must meet the
minimum standards as stated in the BCS Design Guidelines. The fire flow test must be
done in accordance with NFPA 291, Chapter 4. Please see the BCS Design Guidelines,
Domestic Water,Page 6, "Fire Flow Testing" for more information.
5. Please submit sanitary sewer report and analysis.
6. Please submit a full set of construction documents for the proposed development,including
streets, drainage, storm sewer, sanitary sewer, water, grading, erosion control, construction
details, etc.
7. Please submit all construction documents and reports to Brazos County as well.
8. Please provide a letter or agreement from Wellborn Water, explaining their intent to provide
this development with water for domestic flow and to satisfy the fire flow requirements.
The letter should express the intent to extend the same size line which is expressed in the
fire flow report.
9. Please submit engineer's cost estimate for the proposed City of College Station, sanitary
sewer main extension.
10. Please provide easements for any off-site utility extensions.
11. Why has the BTU easement illustrated on the Preliminary Plat been left off the Final Plat?
12. Is the intent to place a HOA maintained median at the intersection of Jones-Butler and
Chinkapin, as reflected on the Preliminary Plat,if so please illustrate.
Reviewed by: Josh Norton Date: October 23, 2006
1
ENGINEERING COMMENTS NO. 1 (Construction Documents)
1. Included is the first set of Oakland Ridge Phase 1 final plat comments, please revise the
Phase 1 Final Plat and submit with the revised construction documents and reports. Upon
receiving the re-submittal of the final plat and construction documents/report the final plat
• be preliminarily scheduled for a P&Z meeting.
pon making the below correction please submit (4) complete sets of construction
documents and reports to be distributed to Brazos County, BTU, City of College Station
Utilities, and City of College Station P&DS.
01 3. Approval of the streets and drainage portion of this subdivision is the purview of Brazos
6•41County.
tit appears you still need a variance from Brazos County to be able to locate sidewalks within
e right-of-way.
ifil
. It appears you still need a variance from Brazos County to be able to locate the
drainage/storm infrastructure within the right-of-way.
spllthough Brazos County is allowing the 20-ft alley to be built, they are not accepting the 24-
ft right-of-way dedication. The pavement and "right-of-way" needs to be dedicated and
maintained to and by the HOA, and should not be called a right-of-way but a HOA or
common area. Please revise on the plat and construction documents.
Brazos County requires that all utility service lines under pavement must be sleeved.
tolieThe following notes explaining maintenance responsibilities should be placed on the final
plat and construction documents:
self Brazos County does allow for the drainage/storm infrastructure to be placed in their
right-of-way, they should be maintained by the HOA.
40-The water infrastructure should be maintained by Wellborn water. Wellborn water is
responsible for all domestic and fire flows to this subdivision.
he alleys should be maintained by HOA.
The sanitary sewer infrastructure should be maintained by the City of College Station
pending acceptance and appropriate warranty periods.
je:ocommon areas including medians should be maintained by HOA.
he sidewalks should be maintain by the HOA
idile Please submit Letter of Acknowledgement found on bcsunited.net.
CZP3lease submit grading and erosion control plan.
®Please submit sanitary sewer report verifying available capacity. There is some concern
regarding the ability to extend this 6-in system further and sewer a greater sewer shed,
ease explain.
Please be aware that the BCS Design Guidelines require that fire flow tests be performed
once the infrastructure has been completed to verify that the hydrant/system meets
minimum requirements.
13. How does the drainage get from Oakland Ridge to the detention pond, there appears to be
a disconnect between the two.
&lease provides a summary of the contract with Wellborn and explain the significance to
this project. Please use the exhibit provided on the last page of the fire flow report as to
describe what portions of water line are being built by who (ie. 12-in main, 8-in main, etc.)
e9lease provide documentation from Citgo allowing for the utilities and easements
throughout these plans to cross the gas line/easement.
lease provide documentation for the 20-ft BTU Easement abandonment.
Please number the storm main junction and inlet boxes in plan and profile.
c5DI assume the water main profiles are supposed to be on sheets SD1 thru SD6 titled "Street
& Drainage Improvements".
Please provide all of the BCS Unified Design Details, including water and sewer details.
4610 eet and Drainage) It appears in the construction documents that the following were not
ubmitted: `
a. Street and Drainage for Chinkapin Trail South - plan and profile missing.? SCwe"
21. (Water Line) It appears in the construction documents that the following were not submitted:
ter line for Chinkapin Trail South - plan and profile missing.
c;p3
ater line for Jones-Butler- plan and profile missing.
/°°"1". >it Water line for Turbinella Way- profile missing.
%c' cob Water line for Las Portales - profile missing. .
VI . Sheet SD1) Please provide detail of valve placement in profile view as done in plan view.
�N eet SD1) Please provide detail of water/sanitary sewer conflict and verify that the conflict
ter- meets TCEQ.
4,1A1!r heet SD1) Minimum bury should be 4-ft for all portions of the water main.
.ioretSheet SD1) Please illustrate the fire hydrant in profile view.
cnheet SD2) In places where the water and storm main are under "structural" areas,
structural backfill must be used.
Sheet SD2) Minimum bury should be 4-ft for all portions of the water main.
CgD6heet SD3) Please provide detail of water/sanitary sewer conflict and verify that the conflict
meets TCEQ.
toleilgheet SD3) In places where the water main is under "structural" areas, structural backfill
must be used.
0. p eet SD4) In places where the water and storm main are under "structural" areas,
structural backfill must be used.
4;104..... SD4) Where is the profile view of the portion of the storm main crossing Los Portales
Drive after JB#2 to IB#5?
COSheet SD4) It app ars the valve spacing Rn/the water main exceeds the 800-ft
requirement. • (kis is% (INT,kt
a, heet SD5) In places where the storm main is under "structural" areas, structural backfill
ust be used.
Cf,heet SD5) Please identify the water amilgaaaiiikerprierewer main in profile view, as they cross
filrLos Portales Drive.
6 )E 40,.heet SD5) Where is the profile detail for the storm main past IB#7.
Sheet SD6) In places where the storm main is under "structural' areas, structural backfill
must be used.
(Sheet SD6) Please identify the water and sanitary sewer main in profile view, as they cross
Los Portales Drive.
0. (Sheet SD6) Where is the profile detail for the storm main as is comes across Los Portales
• Drive, as is comes off Chinkapin Trail South. 144
'cri',.heet SD6) Where is the profile detail for the storm main past IB#7.
(Sheet SIA thru S4B) Please verify that none of the sanitary sewer service lead
terminations exceed the 3.5-ft maximum depth requirement per the BCS Design Guidelines.
spe(Sheet S1A thru S4B) The minimum slope for a 6-in sanitary sewer main is .80%.
heet SIA) Please provide detail of water/san' ary sewer conflict and verify that the conflict
meets TCEQ. i +,NA% •" hF!4..
Sheet S1A) In places where the sanitary sewer main is under "structural" areas, structural
backfill must be used.
Sheet S1 B) In places where the sanitary sewer main is under "structural" areas, structural
kfill must be used.
. (Sheet SIB) Please provide profile detail for the sanitary sewer main extension across Los
Portales Drive. Dead ends require the extension of at least one section of pipe with a
cleanout or manhole.
tglieSheet SIC) In places where the sanitary sewer main is under "structural" areas, structural
backfill must be used.
y7? eet SIC) Please move manhole#6 outside of the pavement of the private alley.
,QNB Sheet SIC) Please revise manhole #6 in profile.
Sheet S1 D) Please provide detail of water/sanitary sewer conflict and verify that the conflict
meets TCEQ.
44heet S1 D) In places where the sanitary sewer main is under "structural" areas, structural
backfill must be used.
gelbSheet SI D) Please revise manhole #9.
1Fheet S2) In places where the sanitary sewer main is under "structural" areas, structural
backfill must be used.
410.heet S3) Please provide detail of water/sanitary sewer conflict and verify that the conflict
meets TCEQ.
OSheet S3) In places where the sanitary sewer main is under "structural" areas, structural
backfill must be used.
. (Sheet S3) What is the slope on line "S-5"?
. (Sheet S4A) Please provide detail of water/sanitary sewer conflict and verify that the conflict
meets TCEQ.
0(Sheet S4A) In places where the sanitary sewer main is under "structural" areas, structural
backfill must be used.
fern addition to the following standard comments, if more than 5 acres will be disturbed during
construction of this project a NOI must be filed with the state and a copy provided to the
CoCS. Storm water management requirements are as follows, any questions may be
directed to Donnie Willis, CoCS Drainage Inspector, at 979-764-6375:
Y ,
STAFF REVIEW COMMENTS NO. 1
Project: OAKLAND RIDGE PH 1 (FP) -06-00500225
**The County has not provided comments for this project yet. County comments may result
in additional City comments.**
PLANNING
Please provide documentation of County approval for this project and any variances associated
th this project.
The owner information for the property to the north has been duplicated and it looks like there
re two properties. Please remove one of the labels and the dashed line.
is not necessary to provide the lot areas for all of the lots. Please remove all tables.
. Please be sure not to include the"Seal"label on the mylar.
I
Reviewed by: Crissy Hard Date: October 23,2006
BTU COMMENTS
410100 eed to show a note granting a 20'electric easement or PUE centered on all interior lot lines.
Need to show a note granting a 20'PUE along outer perimeter of development. A 16'PUE l
long all public ROW is sufficient.
Need to show a note using the following language granting a"5'wide easement for anchors and
guy wires necessary to help support overhead utility lines. Easement will extend 20'beyond any
coutility easement.
All existing electrical lines need to be shown on each plat.Also show the volume and page
number of any electric line easements.
'"Please call BTU Line Design at 821-5770 at least 150 days before power is needed to begin the
process for providing power to the area.
Note 3 should read"Electrical service for this subdivision shall be by Bryan Texas Utilities."
Reviewed by: Randy Trimble Date: •ctober 18,200
ENGINEERI2NG COMMENTS NO. 1 r 1 ri 14. @ 1S ' 74 0<ritikElice.- S
allow more time for the County to make comments; however, the following issues
4))‘
need to be addressed and may require variances:
Lot size less than 1 acre
b. Lot width less than 70-ft
c. ROW width less then 70-ft
d. Provide 10-ft PUE for side lot lines
e. Alley width and ROW
so
. It appears that the metes and bounds of this plat do not close,please revise.
.oie Please submit drainage report.
wies*Please submit fire flow report and analysis. The fire flow report and analysis must meet the
minimum standards as stated in the BCS Design Guidelines. The fire flow test must be
done in accordance with NFPA 291, Chapter 4. Please see the BCS Design Guidelines,
doomestic Water,Page 6, "Fire Flow Testing"for more information.
_lease submit sanitary sewer report and analysis.
• '
Please submit a full set of construction documents for the proposed development,including
6. g
streets, drainage, storm sewer, sanitary sewer, water, grading, erosion control, construction
details,etc.
lease submit all construction documents and reports to Brazos County as well.
1004.0,
Please provide a letter or agreement from Wellborn Water, explaining their intent to provide
this development with water for domestic flow and to satisfy the fire flow requirements.
The letter should express the intent to extend the same size line which is expressed in the
fire flow report.
lease submit engineer's cost estimate for the proposed City of College Station, sanitary
sewer main extension.
Please provide easements for any off-site utility extensions.
( Why has the BTU easement illustrated on the Preliminary Plat been left off the Final Plat?
.Is the intent to place a HOA maintained median at the intersection of Jones-Butler and
Chinkapin,as reflected on the Preliminary Plat,if so please illustrate.
Reviewed by: Josh Norton Date: October 23,2006
CIL( Gtr G..k r,w47
16. (Sheet SD5) Where is the profile view of the portion of the storm main crossing Los
Portales Drive after JB#2 to IB#5 to IB#7?
17. (Sheet SD5) Please provide structural backfill for the portion of storm sewer that crossed
Los Portales Drive and Turbinella Drive.
18. (Sheet SD5) Please identify the sanitary sewer main and water main in profile view, as
they cross Los Portales Drive.
19. (Sheet SD5)Where is the profile detail for the storm main past IB#7.
20. (Sheet SD6) In places where the storm main is under "structural" areas, structural
backfill must be used.
21. (Sheet SD6) Where is the profile detail for the storm main as is comes across Los
Portales Drive, as is comes off Chinkapin Trail South.
22. (Sheet S1A) Please provide detail of water/sanitary sewer conflict and verify that the
conflict meets TCEQ.
23. (Drainage Report) Please clarify how this developments storm drainage is reaching the
existing detention pond?
24. (Drainage Report) Does the existing pond still maintain its original design capacity or has
silt decreased this capacity? This should be addressed in the grading plan if necessary.
25. (Drainage Report) Will the down stream property owners from the detention pond be
receiving more storm water post development?
26. (Drainage Report) Will any down stream property owners be receiving more storm water
post development?
27. (Drainage Report) Please provide a table comparing the pre development flows and the
post development flows leaving the detention pond.
28. (Drainage Report) Please provide a drainage area map and explain how each area is
performing in pre (Q) conditions and post (Q) conditions. The detention pond should be
taken into account in this post condition analysis.
29. Upon re-submittal please include a response letter addressing each staff review
comment for the construction documents.
Reviewed by: Crissy Hartl & Josh Norton Date: August 30, 2007
BTU Comments
I. I see where the lots are too small to accommodate a 20' easement along the interior lot
/ lines as in my note 1.
/2. In my opinion, note 11 does not belong on the final plat. That will be addressed outside
/ of the platting process.
✓3 The word "and" in Note 12 should be "all" and the word easement should be plural.
On B10, L16, the 20' PUE arrow points to the 25' BL. It should look more like B9, L14.
1 5 Are the alley commons area and the commons area (median) being dedicated as
ROW? We may need to utilize them.
How does the PUE work in the rear of B10, L1 along Jones Butler? It looks disjointed.
Same for the 20' PUE along the fronts of B10, L1-4 and B1, L1-4.
/7. As an FYI, all padmount transformers and switchgear will be placed along an all weather
Vroads —typically along the front of the lots. Ideally it will be away from all driveways.
8. As always, Line Design needs at least 150 days notice before power is needed to the
subdivision so materials can be ordered. 979-821-5715.
Reviewed by: Randy Trimble Date: September 2, 2007