HomeMy WebLinkAboutStaff Report STAFF REPORT
Project Manager: Crissy Hartl, Staff Planner Report Date: October 10, 2007
Email: chartl@cstx.gov Meeting Date: November 1, 2007
Project Number: 07-00500237
Item: Presentation, possible action, and discussion on a Final Plat for Pebble Creek Phase 9G
consisting of 20 lots on 9.086 acres located at St. Andrews Drive and Quaker Ridge Court.
Applicant: Davis Young, Pebble Creek Development
Staff Recommendations: Staff recommends approval of the Final Plat.
Item Summary: This Final Plat consists of 20 single-family residential lots on 9.086 acres in the
Pebble Creek Subdivision. This phase is located at St. Andrews Drive and Quaker Ridge Drive,
just southwest of the future Pebble Creek Parkway. Until Pebble Creek Parkway is constructed,
the only access to this phase will be from Quaker Ridge Drive through Phase 9F, which
received final plat approval in April 2007.
Comprehensive Plan Considerations: The Land Use Plan identifies this area as Single
Family Medium Density. The Thoroughfare Plan shows the extension of a minor collector, St.
Andrews Drive, from Congressional Drive to the future extension of Pebble Creek Parkway,
which is shown as a major collector. However, St. Andrews will not connect to Pebble Creek
Parkway until Pebble Creek Parkway is extended. This portion of St. Andrews Drive will also
include bikelanes as shown on the Bikeway Master Plan. Access to Congressional Drive will be
provided as future phases are constructed.
This Final Plat generally complies with the approved Preliminary Plat for Phases 9D-9H, where
the number of lots in this phase increased from 19 to 20 lots. The plat also complies with the
City's Subdivision Regulations and the Comprehensive Plan.
Item Background: The subject property was annexed in 1994 and subsequently zoned A-O
Agricultural-Open. It was rezoned in 2004 to R-1 Single-Family Residential and has remained
unplatted. A preliminary plat was approved for Phases 9D-9H in March 2005 by the Planning &
Zoning Commission.
Budgetary & Financial Summary: None requested.
Related Advisory Board Recommendations: The Parks Board has previously accepted a
land dedication with previous phases. Parkland development fees for the 20 lots in this phase
will be required.
Commission Action Options: The Commission has final authority over the Final Plat. The
options regarding the Final Plat are:
• Approval
• Denial
Supporting Materials:
1. Small Area Map (SAM) and Aerial Map
2. Application
3. Copy of Final Plat (provided in packet)
47