Loading...
HomeMy WebLinkAboutCost Estimate DEVELOPMENT Ltd. CIWL , CIVIL ENGINEERING&DESIGN-BUILD SERVICES P.O. Box 11929 • College Station, Texas 77842 • Phone: 979-764-7743 • Fax: 979-764-7759 ENGINEER'S ESTIMATE FOR DECATUR DRIVE MEDIAN MODIFICATION COLLEGE STATION,TEXAS October 23,2007 Item Estimated Estimated Description Unit Unit Price No. Quantity Cost Median Modification 1 Lime Treated Subgrade-6" 261 SY 3.00 783 2 8"Jointed Reinforced Portland Cement Concrete Pavement 223 SY 38.00 8,474 3 ,Colored Textured Concrete 14 SY 78.00 1,092 4* Concrete Curb(Type 11) -93 LF 3.20 -297 Total $10,052 * Construction of the median opening results in a reduction in the amount of curb construction at®" JF''t co 14Sm *o JOSEPH P. SC T #1 tA e. V?".658 •� .� I � ,