HomeMy WebLinkAboutStaff Review STAFF REVIEW COMMENTS NO. 2
Project: NORTH FOREST ESTATES (PP & FP) —06-00500079, 06-00500222
PLANNING & ENGINEERING COMMENTS
1. Please update the date of submittal to June 2007 and all dates on the certificates to 2007.
2. Please relabel the 20' Sanitary Sewer Easement as a 20' Public Utility Easement.
Reviewed by: Crissy Hard and Josh Norton Date: June 28, 2007
NOTE: ;Any changes made to the plans,that have not been requested by the City of College Station,must be explained in your next
transmittal letter and"bubbled"on your plans. Any additional changes on these plans that have not been pointed out to the
City',will constitute a completely new review. 2 of 2
STAFF REVIEW COMMENTS NO. 1
Project: NORTH FOREST ESTATES (FP) - 06-00500222
PLANNING/ENGINEERING
ease remove building setbacks from the plat.
1.0 ease submit water, sanitary sewer and drainage report, as not to hold up the review of the
traction documents.
ease remove "no easement of record" on the 20-foot sanitary sewer easement. Please identify it
as a Public Utility Easement.
ease dedicate a 10-foot PUE along the portion of the southern property line of Common Area
" ,which is not already encumbered by an easement.
. Please dedicate a PUE between the existing easement and property line along the southern
/•/property line of lots 13, 14& Common Area "A".
1� The construction documents and reports are still under review and may affect the plat.
Reviewed by:Jennifer Reeves &Josh Norton Date: October 23,2006
FIRE
1. No comments
Reviewed by: Steve Smith Date: 10/17/06
Sanitation Comments
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: October 19,2006
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. Developer provides temporary blanket easement for construction purposes.
2. Developer provides easements for electric infrastructure as installed for electric lines
(including street lights).
3. The following easements will be required:
__,..? 10'P.U.E. along the back of Block 2,Lot 12
:...13.:*---5'P.U.E. in Common Area"A" of Block 1,next to Lot 13 for streetlighting.
'P.U.E. in Block 1,Lot 8 lining up against Block 1,Lot 9 for streelighting.
P.U.E.in Block 1,Lot 4 lining up against Block 1,Lot 5 for streelighting.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per city specs and design.
2. City will provide drawings for conduit installation.
3. Developer provides 30'of rigid or IMC conduit for riser poles. City installs riser.
4. Developer to intercept existing conduit at designated transformers and extend as required.
5. If conduit does not exist at designated transformer, developer to furnish and install conduit
as shown on electrical layout.
6. Developer pours transformer pad(s) per city specs and design.
7. Developer installs pull boxes & secondary pedestals as per city specs and design.(pull boxes
& secondary pedestals provided by the city).
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 2
8. Developer provides digital AutoCAD 2000 or later version of plat and/or site plan email to
bread(a,cstx.gov .
9. Developer provides load data for project.
10. To discuss any of the above electrical comments,please contact Brent Read at 979-764-5026
Reviewed by: Brent Read Date: October 18, 2006
NOTE: Any changes made to the plans,that have not been requested by the City of College Station,must be explained
in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not
been pointed out to the City,will constitute a completely new review. 3