TRANSMITTAL LETTER
TO: Ms. Bridgette George DATE: October 13, 2006
Planning & Development Services
City of College Station
P.O. Box 9960 RE: Southern Trace,
College Station, Texas 77842 Phase 2 (FP)
Phone: (979) 764-3570 PRJT No.: 1053-0007
Fax: (979) 764-3496
ATTACH. DESCRIPTION
14 each 24"x36" copies of the Final Plat
1 each Final Plat Application, Checklist, Supplemental Development Permit &
Check for$1200
2 sets Public Infrastructure Plans
2 each Drainage &Water/Sewer Analysis Reports
1 each MYLAR of the Preliminary Plat
THESE ARE BEING SENT:
❑ At your request ❑ For your information ❑ Per our conversation
❑ For your signature ❑ For further action as noted 0 Per contract
❑ For your approval ® For review and comment o For your use
o For 0 At request of ❑ Original will follow by mail
REMARKS:
The Brazos County Tax Office is updating their files as soon as they are available we will
submit the Tax Certificates for this property.
If you have any questions or need any additional information, please do not hesitate to call.
Copy to: Signed: ,
Jeffery L. Robertson, P.E.
F:\1053-Randy French10007-Southern Trace\Correspondence\COCS-George0l-TLetter wpd
Mr ",URE & BROWNE ENGINEER). WSURVEYING, INC.
1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net
November 7, 2006
Mr. Jason Schubert
Planning & Development Services
City of College Station
Post Office Box 9960
College Station, TX 77842
Re.: Southern Trace, Phase Two (FP)
Staff Review Response
MBESI#: 1053-0007
Dear Jason:
Below is the summary of the revisions made per staff's comments.
PLANNING: (Reviewed by: Jason Schubert; Date: November 6, 2006)
COMMENT#1: If current tax certificates are not available, they will need to be provided prior
to the filing of the final plat.
ACTION: Duly noted.
COMMENT#2: A TxDOT driveway permit has not been submitted for Jeanne Dr to access SH
40. The project will not be scheduled for P&Z until at least preliminary
approval has been obtained from TxDOT for the driveway.
ACTION: See attached TxDOT permit applications. In order to keep this project on the
November 16, 2006 Planning and Zoning Commision agenda, we have
received preliminary approval from TxDOT.
COMMENT#3: The diagram that was submitted to show the limits of clearing is not sufficient.
An additional requirement was added to the property by City Council when it
was rezoned. From an aerial photo, it does not appear that the entire length,
particularly that abutting the Dale trace, has vegetation sufficient to meet UDO
Article 7.6 Buffers. Submit a tree survey demonstrating existing vegetation
along with barricade details for such & provide a landscape plan showing how
the remainder of the buffer requirement will be met.
ACTION: Locations of existing trees and proposed plantings have been added to the
overall plan in the construction drawings.
COMMENT#4: Remove BSL from the Abbreviations in General Note#7.
ACTION: The revised plat shows this change.
COMMENT#5: The turning radius for the cul-de-sac on McLaren Dr is still under review by the
Fire Dept.
ACTION: Duly noted.
COMMENT#6: The construction documents& reports are still under review.
ACTION: Duly noted.
Southern Trace,Phase Two(FP) Page 1 of 2
City Comment Response Letter
Please note that Parklan1edication feesfthe Mylar original will be'submitted before the Plat is
filed.
If you have any questions or additional comments, please do not hesitate to let me know.
Sincerely,
l.�
Je ery . Ro : rtson, P.E.
Southern Trace,Phase Two(FP) Page 2 of 2
City Comment Response Letter
CITY OF COJ I.FGE STATION
Planning d'Development Services
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 6, 2006
TO: BCS Development, Randy French via fax 979-690-0348
FROM: Jason Schubert, Staff Planner
SUBJECT: Southern Trace Phase 2—Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Monday, November 13th, 10:00 a.m., your project will be placed on the next
available Planning and Zoning Commission meeting scheduled for, December 7th, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) tree survey and landscaping el..•
Parkland Dedication in the amo t of$31,024 mu • be submitted prior to the filing of the
final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov
and awelsh@cstx.gov; and
Upon receipt of the required documents for the Planning& Zoning meeting, your project will be considered
formally filed with the City of College Station. Please note that if all comments have not been addressed your
project will not be scheduled for a Planning& Zoning Commission meeting. Your project may be placed on
a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has
been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site
on Monday the week of the P&Z meeting.
http://www.cs tx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Dale Brown,via fax 979-693-2554
Case file #06-00500221
Home of Texas A&M University
Mc ,URE & BROWNE ENGINEERI "/SURVEYING, INC.
1008 Woodcreek Drive,Suite 103•College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net
October 30, 2006
Lindsay Boyer
Planning & Development Services
City of College Station
Post Office Box 9960
College Station, TX 77842
Re.: Southern Trace, Phase Two (FP)
Staff Review Response No. 1
MBESI#: 1053-0007
Dear Lindsay:
Below are the summary of the revisions made per staff review comments.
PLANNING: (Reviewed by: Lindsay Boyer/Josh Norton; Date: October 23, 2006)
COMMENT#1: Please provide current tax certificates.
ACTION: We have been informed by the tax office that tax certificates are not
available currently. Once the new bills have been sent out and paid, we
will provide the city with a copy.
1 COMMENT#2: P -ase submit TxDOT permit for Jeanne Drive access to SH 40.
.X 0 ACTION: 0 - we receive the Engineering comments and make the corrections
required, we will submit the TxDOT permit applications.
COMMENT#3: Remove all setbacks on the plat & the general note portions that relate to
the specific setback. It is adequate for it just to reference the UDO
setbacks and it being a cluster development.
ACTION: The linework for the setback lines has been removed from the plat. The
general notes in regards to the setbacks have been updated per a
.0\ conversation with Lindsay Boyer.
(e COMMENT#4: at happened to the median on McLaren Drive cul-de-sac from the PP?
d ACTION: he common area for the median has been added to the plat.
r MENT#5: The PUE in the common area at McLister & McFarland is missing.
Please add.
ACTION: The PUE has been added to the plat.
ENT#6: Please label the PUEs at the SW property corner.
ACTION: The PUE has been added to the plat.
ENT#7: Show ROW dedication for FM 2154.
ACTION: The ROW dedication is shown on the revised plat.
Southern Trace,Phase Two(FP) Page 1 of 3
City Comment Response Letter
COMMENT#8: Please provide info how the buffer requirement is being met — thru
existing vegetation (please show how those trees will be protected during
construction) or through new plantings. This does not need to be on the
FP or construction documents, but we would like documents for our files.
ACTION: See attached.
COMMENT#9: The construction documents & reports are still under review & may affect
the plat.
ACTION: Duly noted.
TxDOT: (Reviewed by Karl Nelson; Date: October 20, 2006)
COMMENT#1: Access driveways to SH 40 must meet TxDOT's current "Regulations for
Access Driveways to State Hwy's." Regulations are primarily based on
posted speed limits & distances between proposed & adjacent access
points. Where posted speed limits are 50 mph or more the required
spacing between access points is 425'.
Where driveway spacing is insufficient joint access will be required or
access to internal/external streets.
Appropriate info will be required for any future permits/work at this site,
which should include drainage data, etc.
ACTION: Once we receive the Engineering comments and make the corrections
required, we will submit the TxDOT permit applications.
SANITATION: (Reviewed by Wally Urrutia; Date: October 19, 2006)
COMMENT#1: Sanitation is ok with this project.
ACTION: Duly noted.
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION:
COMMENT#1: Developer provides temporary blanket esmt for construction purposes.
ACTION: Duly noted.
COMMENT#2: Developer provides esmts for electric infrastructure as installed for
electric lines (including street lights).
ACTION: Duly noted.
COMMENT#3: Electric layout will reflect changes discussed at meeting with Randy
French on 10/16/2006. Electric will be routed across front of lots. Will
require 10' esmt across front of lots for primary as required by new layout.
ACTION: Duly noted.
GENERAL ELECTRIC COMMENTS: (Reviewed by Gilbert Martinez; Date: Oct. 18, 2006)
COMMENT#1: Developer installs conduit per city specs and design.
ACTION: Duly noted.
COMMENT#2: City will provide drawings for conduit installation.
ACTION: Duly noted.
COMMENT#3: Developer provides 30' of rigid or IMC conduit for riser poles. City installs
riser.
ACTION: Duly noted.
Southern Trace,Phase Two(FP) Page 2 of 3
City Comment Response Letter
•
COMMENT#4: Deeioper to intercept existing conduit at'designated transformers &
extend as required.
ACTION: Duly noted.
COMMENT#5: If conduit does not exist at designated transformer, developer to furnish &
install conduit as shown on electrical layout.
ACTION: Duly noted.
COMMENT#6: Developer installs secondary pedestals as per city specs and design
(secondary pedestals provided by city).
ACTION: Duly noted.
COMMENT#7: Developer provides AutoCAD 2000 or later version of plat and/or site plan
email to gmartinez@cstx.gov.
ACTION: Duly noted.
COMMENT#8: Developer provides load data for project.
ACTION: Duly noted.
COMMENT#9: To discuss electrical comments contact Gilbert Martinez (764-6255).
ACTION: Duly noted.
If you have any questions or additional comments, please do not hesitate to let me know.
Sincerely,
o ertson, P.E.
Southern Trace,Phase Two(FP) Page 3 of 3
City Comment Response Letter
CITY OF COLLEGE STATION
Planning d►Development Service
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 30,2006
TO: BCS Development,Randy French via fax 979-690-0348
FROM: Josh Norton
SUBJECT: SOUTHERN TRACE PH.2 (FP) - Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Monday, November 6th, 10:00 a.m., your project will be placed on the next
available Planning and Zoning Commission meeting scheduled for, November 16th , 7:00 p.m. in the City
Hall Council Chambers, 1101 Texas Avenue.
One (1) revised set of construction documents
Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered
formally filed with the City of College Station. Please note that if all comments have not been addressed your
project will not be scheduled for a Planning& Zoning Commission meeting.Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been
scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on
Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Dale Brown,via fax 979-693-2554
Case file#06-00500221
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 1 of 2
CITY OF COT r FGE STATION
Planning d Development Service
1101 Texas Avenue,P.O. Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
October 23,2006
TO: BCS Development,Randy French via fax 979-690-0348
FROM: Lindsay Boyer, Staff Planner
SUBJECT: SOUTHERN TRACE PH.2(FP) -Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Monday, October 30th , 10:00 a.m., your project will be placed on the next
available Planning and Zoning Commission meeting scheduled for, November 16th , 7:00 p.m. in the City
Hall Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copies of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
Parkland Dedication in the amount of$31,024 must be submitted prior to the filing of the
final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and
awelsh@cstx.gov.
Upon receipt of the required documents for the Planning& Zoning meeting, your project will be considered
formally filed with the City of College Station. Please note that if all comments have not been addressedyour
project will not be scheduled for a Planning&Zoning Commission meeting.Your project may be placed on a
future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been
scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on
Monday the week of the P&Z meeting.
http://www.cstx.gov/home/index.asp?page=2481.
If you have any questions or need additional information,please call me at 979.764.3570.
Attachments: Staff review comments
cc: Dale Brown,via fax 979-693-2554
Case file#06-00500221
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out
to the City,will constitute a completely new review. 1 of 3
062
S 'OLC -ft) "? FP
MEMORANDUM
TO: FILE
FROM: Jay Page
TxDOT- BAO
DATE: November 7, 2006
SUBJECT: SH 40(South ROW) @ FM 2154
Southern Trace Subdivision—Phase 2
College Station, Texas
As of this date, the referenced subdivision's Final Plat has been reviewed &
complies with TxDOT's Regulations for Access Spacing within the SH 40 ROW as
per Site Development Comments of August 21, 2006. (See Attached)
Supplemental data may be required when permit(s) are submitted for work in the
SH 40/ FM 2154 ROW's.
I. 0e OLD
8 Mc URE & BROWNE ENGINEER G/SURVEYING, INC. 9 ; 4(p
1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845
(979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net .. V
tib
TRANSMITTAL LETTER
TO: Mr. Jason Schubert DATE: November 7, 2006
Planning & Development Services
City of College Station
P.O. Box 9960 RE: Southern Trace, Phase 2
College Station, Texas 77842 (FP) RE-SUBMITTAL
Phone: (979) 764-3570 PRJT No.: 1053-0007
Fax: (979) 764-3496
ATTACH. DESCRIPTION
1 24"x36" copy of the revised Final Plat eit_, 40 p4-2_,
16 11"x17" copies of the revised Final Plat (9/L ))..
4 TxDOT Permit to Construct Access Driveway Facilities
4 TxDOT Utility Line on Controlled Access Highway Permit
1 Response Letter to Staff Comments
THESE ARE BEING SENT:
❑ At your request ❑ For your information ❑ Per our conversation
o For your signature ❑ For further action as noted ❑ Per contract
❑ For your approval ® For review and comment ❑ For your use
o For ❑At request of ❑ Original will follow by mail
REMARKS:
If you have any questions or need any additional information, please do not hesitate to call.
Copy to: Signed: Der
Jeffery L. Robertson, P.E.
F:11053-Randy French\0007-Southern Trace\Correspondence1COCS-George0l-TLetter.wpd
TRANSMISSION VERIFICATION REPORT
TIME : 11/06/2006 17:06
NAME :
FAX .
TEL .
SER.# : 000L5J596800
DATE,TIME 11/06 17:06
FAX NO./NAME 96900348
DURATION 00: 00:23
PAGE(S) 02
RESULT OK
MODE STANDARD
ECM
.....
CITY OF COLLEGE STATION
Planning&DevelopmentServrut s ..-�'• �? :`
1101 Texas Avenue,P.O.Box 9960
College Station,Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
November 6,2006
TO: BCS Development, Randy French via fax 979-690-0348
FROM: Jason Schubert,Staff Planner
SUBJECT: Southern Trace Phase 2—Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Monday, November 13th, 10:00 a.m., your project will be placed on the next
available Planning and Zoning Commission meeting scheduled for, December 7th, 7:00 p.m. in. the City Hall
Council Chambers, 1101 Texas Avenue.
One (1) 24"x36" copy of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) tree survey and landscaping plan;
Parkland Dedication in the amount of$31,024 must be submitted prior to the filing of the
final plat;
One (1) Millar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to sgi£fin(cstx.gov
and awelsh(7a cstx.gov;and
TRANSMISSION VERIFICATION REPORT
TIME : 11/06/2006 17: 08
NAME :
FAX
TEL
SER.# : 000L5J596800
DATE,TIME 11/06 17: 07
FAX NO./NAME 96932554
DURATION 00:00:26
PAGE(S) 02
RESULT OK
MODE STANDARD
ECM
• F5
. CITY OF COLLEGE STATION !-,n,;7420
,Planning d'Dewlopmnsxt Services
1101 Texas Avenue, P-O.Box 9960
College Station,Texas 77842
Phone 979.764-3570 / Fax 979,764.3496
MEMORANDUM
November 6,2006
TO: BCS Development,]randy French via fax 979-690-0348
FROM: Jason Schubert,Staff Planner 5'5
SUBJECT: Southern Trace Phase 2—Final Plat
Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review
comments detailing items that need to be addressed. If all comments have been addressed and the following
information submitted by Monday, November 13th, 10:00 a.m., your project will be placed on the next
available Planning and Zoning Commission meeting scheduled for, December 7th, 7:00 p.m. in the City Hall
Council Chambers, 1101 Texas Avenue.
One (1) 24"x36"copy of the revised final plat;
Sixteen (16) 11"x17" copies of the revised final plat;
One (1) tree survey and landscaping plan;
Parkland Dedication in the amount of$31,024 must be submitted prior to the filing of the
final plat;
One (1) Mylar original of the revised final plat;and
One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov
and awelsh a[�cstx.gov;and
McCi TIRE & BROWNE ENGINEER"'G/SURVEYING, INC.
1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845 C'S
(979)693-3838 •Fax:(979)693-2554• Email:McClureBrowne rzVerizon.net O o • I i4
TRANSMITTAL LETTER
TO: City of College Station DATE: October, 30, 2006
Development Services Department
RE: SOUTHERN TRACE, PH. 2
FINAL PLAT
Phone: PRJT No.: 1053:0007
Fax:
ATTACH. DESCRIPTION
2 24" X 36" Revised Final Plat 3p4.2. t '
16 11" X 17" Copies of Final Plat
1 Set of Revised Construction Plans
1 Letter of Response to Staff Review Comments
THESE ARE BEING SENT:
® At your request 0 For your information 0 Per our conversation
o For your signature ❑ For further action as noted 0 Per contract
o For your approval ® For review and comment ❑ For your use
❑ For 0 At request of 0 Original will follow by mail
REMARKS:
If you have any questions or need any additional information, plea, e do et hesitate to call.
/
Copy to: Signed: _ Ga. I,' ad
Jett-ry . '7•bertson, P.E.
GAMES!Templates\Transmittal LettersMBESI Transmittal.JEFF.wpd