HomeMy WebLinkAboutCorrespondence & Mr "JURE & BROWNE ENGINEET TG/SURVEYING, INC. 1008 Woodercek Drive,Suite 103•College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net TRANSMITTAL LETTER TO: Ms. Bridgette George DATE: October 13, 2006 Planning & Development Services City of College Station P.O. Box 9960 RE: Southern Trace, College Station, Texas 77842 Phase 2 (FP) Phone: (979) 764-3570 PRJT No.: 1053-0007 Fax: (979) 764-3496 ATTACH. DESCRIPTION 14 each 24"x36" copies of the Final Plat 1 each Final Plat Application, Checklist, Supplemental Development Permit & Check for$1200 2 sets Public Infrastructure Plans 2 each Drainage &Water/Sewer Analysis Reports 1 each MYLAR of the Preliminary Plat THESE ARE BEING SENT: ❑ At your request ❑ For your information ❑ Per our conversation ❑ For your signature ❑ For further action as noted 0 Per contract ❑ For your approval ® For review and comment o For your use o For 0 At request of ❑ Original will follow by mail REMARKS: The Brazos County Tax Office is updating their files as soon as they are available we will submit the Tax Certificates for this property. If you have any questions or need any additional information, please do not hesitate to call. Copy to: Signed: , Jeffery L. Robertson, P.E. F:\1053-Randy French10007-Southern Trace\Correspondence\COCS-George0l-TLetter wpd Mr ",URE & BROWNE ENGINEER). WSURVEYING, INC. 1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net November 7, 2006 Mr. Jason Schubert Planning & Development Services City of College Station Post Office Box 9960 College Station, TX 77842 Re.: Southern Trace, Phase Two (FP) Staff Review Response MBESI#: 1053-0007 Dear Jason: Below is the summary of the revisions made per staff's comments. PLANNING: (Reviewed by: Jason Schubert; Date: November 6, 2006) COMMENT#1: If current tax certificates are not available, they will need to be provided prior to the filing of the final plat. ACTION: Duly noted. COMMENT#2: A TxDOT driveway permit has not been submitted for Jeanne Dr to access SH 40. The project will not be scheduled for P&Z until at least preliminary approval has been obtained from TxDOT for the driveway. ACTION: See attached TxDOT permit applications. In order to keep this project on the November 16, 2006 Planning and Zoning Commision agenda, we have received preliminary approval from TxDOT. COMMENT#3: The diagram that was submitted to show the limits of clearing is not sufficient. An additional requirement was added to the property by City Council when it was rezoned. From an aerial photo, it does not appear that the entire length, particularly that abutting the Dale trace, has vegetation sufficient to meet UDO Article 7.6 Buffers. Submit a tree survey demonstrating existing vegetation along with barricade details for such & provide a landscape plan showing how the remainder of the buffer requirement will be met. ACTION: Locations of existing trees and proposed plantings have been added to the overall plan in the construction drawings. COMMENT#4: Remove BSL from the Abbreviations in General Note#7. ACTION: The revised plat shows this change. COMMENT#5: The turning radius for the cul-de-sac on McLaren Dr is still under review by the Fire Dept. ACTION: Duly noted. COMMENT#6: The construction documents& reports are still under review. ACTION: Duly noted. Southern Trace,Phase Two(FP) Page 1 of 2 City Comment Response Letter Please note that Parklan1edication feesfthe Mylar original will be'submitted before the Plat is filed. If you have any questions or additional comments, please do not hesitate to let me know. Sincerely, l.� Je ery . Ro : rtson, P.E. Southern Trace,Phase Two(FP) Page 2 of 2 City Comment Response Letter CITY OF COJ I.FGE STATION Planning d'Development Services 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 6, 2006 TO: BCS Development, Randy French via fax 979-690-0348 FROM: Jason Schubert, Staff Planner SUBJECT: Southern Trace Phase 2—Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, November 13th, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, December 7th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Sixteen (16) 11"x17" copies of the revised final plat; One (1) tree survey and landscaping el..• Parkland Dedication in the amo t of$31,024 mu • be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov; and Upon receipt of the required documents for the Planning& Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning& Zoning Commission meeting. Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cs tx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Dale Brown,via fax 979-693-2554 Case file #06-00500221 Home of Texas A&M University Mc ,URE & BROWNE ENGINEERI "/SURVEYING, INC. 1008 Woodcreek Drive,Suite 103•College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net October 30, 2006 Lindsay Boyer Planning & Development Services City of College Station Post Office Box 9960 College Station, TX 77842 Re.: Southern Trace, Phase Two (FP) Staff Review Response No. 1 MBESI#: 1053-0007 Dear Lindsay: Below are the summary of the revisions made per staff review comments. PLANNING: (Reviewed by: Lindsay Boyer/Josh Norton; Date: October 23, 2006) COMMENT#1: Please provide current tax certificates. ACTION: We have been informed by the tax office that tax certificates are not available currently. Once the new bills have been sent out and paid, we will provide the city with a copy. 1 COMMENT#2: P -ase submit TxDOT permit for Jeanne Drive access to SH 40. .X 0 ACTION: 0 - we receive the Engineering comments and make the corrections required, we will submit the TxDOT permit applications. COMMENT#3: Remove all setbacks on the plat & the general note portions that relate to the specific setback. It is adequate for it just to reference the UDO setbacks and it being a cluster development. ACTION: The linework for the setback lines has been removed from the plat. The general notes in regards to the setbacks have been updated per a .0\ conversation with Lindsay Boyer. (e COMMENT#4: at happened to the median on McLaren Drive cul-de-sac from the PP? d ACTION: he common area for the median has been added to the plat. r MENT#5: The PUE in the common area at McLister & McFarland is missing. Please add. ACTION: The PUE has been added to the plat. ENT#6: Please label the PUEs at the SW property corner. ACTION: The PUE has been added to the plat. ENT#7: Show ROW dedication for FM 2154. ACTION: The ROW dedication is shown on the revised plat. Southern Trace,Phase Two(FP) Page 1 of 3 City Comment Response Letter COMMENT#8: Please provide info how the buffer requirement is being met — thru existing vegetation (please show how those trees will be protected during construction) or through new plantings. This does not need to be on the FP or construction documents, but we would like documents for our files. ACTION: See attached. COMMENT#9: The construction documents & reports are still under review & may affect the plat. ACTION: Duly noted. TxDOT: (Reviewed by Karl Nelson; Date: October 20, 2006) COMMENT#1: Access driveways to SH 40 must meet TxDOT's current "Regulations for Access Driveways to State Hwy's." Regulations are primarily based on posted speed limits & distances between proposed & adjacent access points. Where posted speed limits are 50 mph or more the required spacing between access points is 425'. Where driveway spacing is insufficient joint access will be required or access to internal/external streets. Appropriate info will be required for any future permits/work at this site, which should include drainage data, etc. ACTION: Once we receive the Engineering comments and make the corrections required, we will submit the TxDOT permit applications. SANITATION: (Reviewed by Wally Urrutia; Date: October 19, 2006) COMMENT#1: Sanitation is ok with this project. ACTION: Duly noted. ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION: COMMENT#1: Developer provides temporary blanket esmt for construction purposes. ACTION: Duly noted. COMMENT#2: Developer provides esmts for electric infrastructure as installed for electric lines (including street lights). ACTION: Duly noted. COMMENT#3: Electric layout will reflect changes discussed at meeting with Randy French on 10/16/2006. Electric will be routed across front of lots. Will require 10' esmt across front of lots for primary as required by new layout. ACTION: Duly noted. GENERAL ELECTRIC COMMENTS: (Reviewed by Gilbert Martinez; Date: Oct. 18, 2006) COMMENT#1: Developer installs conduit per city specs and design. ACTION: Duly noted. COMMENT#2: City will provide drawings for conduit installation. ACTION: Duly noted. COMMENT#3: Developer provides 30' of rigid or IMC conduit for riser poles. City installs riser. ACTION: Duly noted. Southern Trace,Phase Two(FP) Page 2 of 3 City Comment Response Letter • COMMENT#4: Deeioper to intercept existing conduit at'designated transformers & extend as required. ACTION: Duly noted. COMMENT#5: If conduit does not exist at designated transformer, developer to furnish & install conduit as shown on electrical layout. ACTION: Duly noted. COMMENT#6: Developer installs secondary pedestals as per city specs and design (secondary pedestals provided by city). ACTION: Duly noted. COMMENT#7: Developer provides AutoCAD 2000 or later version of plat and/or site plan email to gmartinez@cstx.gov. ACTION: Duly noted. COMMENT#8: Developer provides load data for project. ACTION: Duly noted. COMMENT#9: To discuss electrical comments contact Gilbert Martinez (764-6255). ACTION: Duly noted. If you have any questions or additional comments, please do not hesitate to let me know. Sincerely, o ertson, P.E. Southern Trace,Phase Two(FP) Page 3 of 3 City Comment Response Letter CITY OF COLLEGE STATION Planning d►Development Service 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 30,2006 TO: BCS Development,Randy French via fax 979-690-0348 FROM: Josh Norton SUBJECT: SOUTHERN TRACE PH.2 (FP) - Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, November 6th, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, November 16th , 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) revised set of construction documents Upon receipt of the required documents for the Planning& Zoning meeting,your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressed your project will not be scheduled for a Planning& Zoning Commission meeting.Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Dale Brown,via fax 979-693-2554 Case file#06-00500221 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 2 CITY OF COT r FGE STATION Planning d Development Service 1101 Texas Avenue,P.O. Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM October 23,2006 TO: BCS Development,Randy French via fax 979-690-0348 FROM: Lindsay Boyer, Staff Planner SUBJECT: SOUTHERN TRACE PH.2(FP) -Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, October 30th , 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, November 16th , 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copies of the revised final plat; Sixteen (16) 11"x17" copies of the revised final plat; Parkland Dedication in the amount of$31,024 must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh@cstx.gov. Upon receipt of the required documents for the Planning& Zoning meeting, your project will be considered formally filed with the City of College Station. Please note that if all comments have not been addressedyour project will not be scheduled for a Planning&Zoning Commission meeting.Your project may be placed on a future agenda once all the revisions have been made and the appropriate fees paid. Once your item has been scheduled for the P&Z meeting, the agenda and staff report can be accessed at the following web site on Monday the week of the P&Z meeting. http://www.cstx.gov/home/index.asp?page=2481. If you have any questions or need additional information,please call me at 979.764.3570. Attachments: Staff review comments cc: Dale Brown,via fax 979-693-2554 Case file#06-00500221 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and"bubbled"on your plans.Any additional changes on these plans that have not been pointed out to the City,will constitute a completely new review. 1 of 3 062 S 'OLC -ft) "? FP MEMORANDUM TO: FILE FROM: Jay Page TxDOT- BAO DATE: November 7, 2006 SUBJECT: SH 40(South ROW) @ FM 2154 Southern Trace Subdivision—Phase 2 College Station, Texas As of this date, the referenced subdivision's Final Plat has been reviewed & complies with TxDOT's Regulations for Access Spacing within the SH 40 ROW as per Site Development Comments of August 21, 2006. (See Attached) Supplemental data may be required when permit(s) are submitted for work in the SH 40/ FM 2154 ROW's. I. 0e OLD 8 Mc URE & BROWNE ENGINEER G/SURVEYING, INC. 9 ; 4(p 1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845 (979)693-3838•Fax:(979)693-2554•Email:McClureBrowne@Verizon.net .. V tib TRANSMITTAL LETTER TO: Mr. Jason Schubert DATE: November 7, 2006 Planning & Development Services City of College Station P.O. Box 9960 RE: Southern Trace, Phase 2 College Station, Texas 77842 (FP) RE-SUBMITTAL Phone: (979) 764-3570 PRJT No.: 1053-0007 Fax: (979) 764-3496 ATTACH. DESCRIPTION 1 24"x36" copy of the revised Final Plat eit_, 40 p4-2_, 16 11"x17" copies of the revised Final Plat (9/L )).. 4 TxDOT Permit to Construct Access Driveway Facilities 4 TxDOT Utility Line on Controlled Access Highway Permit 1 Response Letter to Staff Comments THESE ARE BEING SENT: ❑ At your request ❑ For your information ❑ Per our conversation o For your signature ❑ For further action as noted ❑ Per contract ❑ For your approval ® For review and comment ❑ For your use o For ❑At request of ❑ Original will follow by mail REMARKS: If you have any questions or need any additional information, please do not hesitate to call. Copy to: Signed: Der Jeffery L. Robertson, P.E. F:11053-Randy French\0007-Southern Trace\Correspondence1COCS-George0l-TLetter.wpd TRANSMISSION VERIFICATION REPORT TIME : 11/06/2006 17:06 NAME : FAX . TEL . SER.# : 000L5J596800 DATE,TIME 11/06 17:06 FAX NO./NAME 96900348 DURATION 00: 00:23 PAGE(S) 02 RESULT OK MODE STANDARD ECM ..... CITY OF COLLEGE STATION Planning&DevelopmentServrut s ..-�'• �? :` 1101 Texas Avenue,P.O.Box 9960 College Station,Texas 77842 Phone 979.764.3570 / Fax 979.764.3496 MEMORANDUM November 6,2006 TO: BCS Development, Randy French via fax 979-690-0348 FROM: Jason Schubert,Staff Planner SUBJECT: Southern Trace Phase 2—Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, November 13th, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, December 7th, 7:00 p.m. in. the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36" copy of the revised final plat; Sixteen (16) 11"x17" copies of the revised final plat; One (1) tree survey and landscaping plan; Parkland Dedication in the amount of$31,024 must be submitted prior to the filing of the final plat; One (1) Millar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgi£fin(cstx.gov and awelsh(7a cstx.gov;and TRANSMISSION VERIFICATION REPORT TIME : 11/06/2006 17: 08 NAME : FAX TEL SER.# : 000L5J596800 DATE,TIME 11/06 17: 07 FAX NO./NAME 96932554 DURATION 00:00:26 PAGE(S) 02 RESULT OK MODE STANDARD ECM • F5 . CITY OF COLLEGE STATION !-,n,;7420 ,Planning d'Dewlopmnsxt Services 1101 Texas Avenue, P-O.Box 9960 College Station,Texas 77842 Phone 979.764-3570 / Fax 979,764.3496 MEMORANDUM November 6,2006 TO: BCS Development,]randy French via fax 979-690-0348 FROM: Jason Schubert,Staff Planner 5'5 SUBJECT: Southern Trace Phase 2—Final Plat Staff reviewed the above-mentioned final plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. If all comments have been addressed and the following information submitted by Monday, November 13th, 10:00 a.m., your project will be placed on the next available Planning and Zoning Commission meeting scheduled for, December 7th, 7:00 p.m. in the City Hall Council Chambers, 1101 Texas Avenue. One (1) 24"x36"copy of the revised final plat; Sixteen (16) 11"x17" copies of the revised final plat; One (1) tree survey and landscaping plan; Parkland Dedication in the amount of$31,024 must be submitted prior to the filing of the final plat; One (1) Mylar original of the revised final plat;and One (1) copy of the digital file of the final plat on diskette or e-mail to sgriffin@cstx.gov and awelsh a[�cstx.gov;and McCi TIRE & BROWNE ENGINEER"'G/SURVEYING, INC. 1008 Woodcreek Drive,Suite 103 •College Station,Texas 77845 C'S (979)693-3838 •Fax:(979)693-2554• Email:McClureBrowne rzVerizon.net O o • I i4 TRANSMITTAL LETTER TO: City of College Station DATE: October, 30, 2006 Development Services Department RE: SOUTHERN TRACE, PH. 2 FINAL PLAT Phone: PRJT No.: 1053:0007 Fax: ATTACH. DESCRIPTION 2 24" X 36" Revised Final Plat 3p4.2. t ' 16 11" X 17" Copies of Final Plat 1 Set of Revised Construction Plans 1 Letter of Response to Staff Review Comments THESE ARE BEING SENT: ® At your request 0 For your information 0 Per our conversation o For your signature ❑ For further action as noted 0 Per contract o For your approval ® For review and comment ❑ For your use ❑ For 0 At request of 0 Original will follow by mail REMARKS: If you have any questions or need any additional information, plea, e do et hesitate to call. / Copy to: Signed: _ Ga. I,' ad Jett-ry . '7•bertson, P.E. GAMES!Templates\Transmittal LettersMBESI Transmittal.JEFF.wpd